3.1 FMEA shall be conducted for each high-speed
craft, before its entry into service, in respect of the systems as
required under the provisions of 5.2, 9.1.10, 12.1.1 and 16.2.6 of this Code.
3.2 For craft of the same design and having the
same equipment, one FMEA on the lead craft will be sufficient, but
each of the craft shall be subject to the same FMEA conclusion trials.