1 Title (number and title of regulation(s))
|
|
2 Origin of the requirement (original proposal document)
|
|
3 Main reason for the development (extract from the proposal
document)
|
|
4 Related output
|
|
5 History of the discussion (approval of work programmes, sessions of
sub-committees, including CG/DG/WG arrangements)
|
|
6 Impact on other instruments (e.g. codes, performance standards,
guidance circulars, certificates/records format, etc.)
|
|
7 Technical background
|
7.1 Scope and objective (to cross check with items 4 and 5 in part II of
the checklist)
|
|
7.2 Technical/operational background and rationale (summary of FSA study,
etc., if available or, engineering challenge posed, etc.)
|
|
7.3 Source/derivation of requirement (non-mandatory instrument, industry
standard, national/regional requirement)
|
|
7.4 Short summary of requirement (what is the new requirement – in short
and lay terms)
|
|
7.5 Points of discussions (controversial points and conclusion)
|
|