8.3.1 The equipment used for operations is to be agreed by LR for the processes
specified.
8.3.2 Individual risers, equipment, fittings and sub-assemblies are to be
handled and stored with care, especially components with anodes or heavy anode
bracelets. No components are to be stored in a manner which will cause damage or
deformation.
8.3.3 All components and sub-assemblies are to be inspected before installation
and be approved to the satisfaction of the Surveyor.
8.3.4 The installation of the riser is not to introduce any unscheduled loading
and the transfer of loading to riser supports is to be shown to be in accordance
with design specifications.
8.3.5 All monitoring systems are to be operated and calibrated to the
Surveyor's satisfaction during all laying and installation operations.