1.1.1 In addition to the requirements detailed in this Chapter, the requirements of Pt 5, Ch 13, 1 General requirements and Pt 5, Ch 13, 2 Construction and installation are to be complied with, where applicable.
1.1.2 The requirements of Pt 5, Ch 13, 3 Drainage of compartments, other than machinery spaces are also to be complied with, so far as they are applicable, for the drainage of tanks, oily bilges and cofferdams, etc.
1.1.3 The requirements of Pt 5, Ch 14, 2 Fuel oil - General requirements and Pt 5, Ch 14, 4 Fuel oil pumps, pipes, fittings, tanks, etc. are to be complied with, as far as they are applicable, for all flammable liquids.