6 Integrated computer control - ICC notation
6.1 General
6.1.1 Integrated
Computer Control class notation ICC may be assigned where
an integrated computer system in compliance with Pt 6, Ch 1, 6.1 General provides fault tolerant
control and monitoring functions for one or more of the following
services:
-
Propulsion;
-
Electrical generation
and distribution (power management systems);
-
Cargo and ballast.
6.1.3 Special
consideration will be given to integrated computer control systems
for other applications, except where these are addressed by other
control engineering class notations. In particular, see
Pt 7, Ch 9 Navigational Arrangements and Integrated Bridge Systems for requirements of the optional
class notation IBS – Integrated Bridge Navigation
Systems.
6.2 General requirements
6.2.4 Controls
are to be provided, in compliance with Pt 6, Ch 1, 2.5 Control systems, general requirements, to ensure the safe and effective operation of equipment and
response to faults, e.g. stopping, starting, adjustment of parameters,
etc. Indication of operational status and other such parameters necessary
to satisfy this requirement, is to be provided for all equipment under
control by the integrated computer control system.
6.3 Operator stations
6.3.2 Each
multi-function display and control unit is to include a monitor, keyboard
and tracker ball. Alternative arrangements will be considered where
these enable each unit to be configured by the user to provide required
control or monitoring functions.
6.3.3 Where
the integrated computer control system is arranged such that control
and monitoring functions may be accessed at more than one operator
station, the selected mode of operation of each station (e.g. in control,
standby, etc.) is to be clearly indicated. See also
Pt 6, Ch 1, 2.2 Control stations for machinery.
6.3.4 Means
of communication are to be provided between operator stations and
any other stations from which the equipment may be controlled. The
arrangements are to be permanently installed and are to remain operational
in the event of failure of the main electrical power supply to the
integrated control system.
|
Copyright 2022 Clasifications Register Group Limited, International Maritime Organization, International Labour Organization or Maritime
and Coastguard Agency. All rights reserved. Clasifications Register Group Limited, its affiliates and subsidiaries and their respective
officers, employees or agents are, individually and collectively, referred to in this clause as 'Clasifications Register'. Clasifications
Register assumes no responsibility and shall not be liable to any person for any loss, damage or expense caused by reliance
on the information or advice in this document or howsoever provided, unless that person has signed a contract with the relevant
Clasifications Register entity for the provision of this information or advice and in that case any responsibility or liability is
exclusively on the terms and conditions set out in that contract.
|
![](LR-FooterLogo.png) |
|