2.1.1 The
following plans and information regarding the hold ventilation systems
and the electrical supplies to container plug-in points are to be
submitted in triplicate for appraisal before construction is commenced:
-
Plans of
ventilation arrangements:
- Location and installation details of each hold space ventilation
system showing duct arrangement and sizes.
- Details of all mechanical ventilation fans including locations,
number, duty at design conditions and power consumption.
- Details of air inlets including number, type, size and locations.
- Details of air outlets including number, type, size and locations.
- Details and locations of dampers and flaps, if applicable.
-
Plans of
hold spaces:
- Refrigerated container stowage plans, including sectional elevation
and plan views.
- Design pressure or vacuum in each hold space.
- Details of hatch cover sealing arrangements.
- Personnel access arrangements.
- Details and locations of hold temperature measurement sensors.
- Details of any pressure/vacuum safety valves if applicable.
-
Ventilation
throughput:
- Specified air throughput rate and proposed method of measurement.
- Design temperature rise in the hold space and corresponding diurnal
external ambient air temperature and relative humidity.
- Schematic arrangement of the ventilation system showing proposed
air volume and velocity at junctions.
-
Plans of
deck-stowed containers:
- Refrigerated container stowage plans, including sectional elevation
and plan views.
- Details of access arrangements for maintenance and monitoring
of refrigeration units fitted to deck-stowed containers.
-
Hull structure:
- Details of associated openings through the hull structure are
to be submitted.
-
Electrical.
In addition to the applicable requirements of Pt 6, Ch 2, 1.2 Documentation required for design review, the following information
and plans specific to the container plug-in points and ventilation
system are to be submitted:
- Power supply arrangements to the deck stowed refrigerated containers.
- Power supply arrangements to the hold space stowed refrigerated
containers.
- Power supply arrangements to the ventilation system.
- Single-line diagram of the ventilation system. This is to include
rating of motors, insulation type, size and current loading of cables
and make, type and rating of protective devices.
- A schedule of normal operating loads of the ventilation system
estimated for the design conditions expected.
-
Control
equipment. In addition to the applicable requirements of Pt 6, Ch 1, 1.2 Documentation required for design review , the following information
and plans specific to the ventilation system are to be submitted:
- Line diagram of control circuits.
- List of monitored, control and alarm points.
- Locations of control panels and consoles.
- Details of alarm system, including location of control panel and
audible and visual warning devices.
-
Testing:
- Details of the testing and commissioning programme, including
instrumentation to be used, are to be submitted.