                     2 General requirements
                  
                  
                  
                  
                  
                  
                  
                     
                        
                         
                        2.1 General
                        
                        
                        
                        
                           
                           
                              
                              
                              2.1.1 Limitations
                                 with regard to the application of these Rules are indicated in the
                                 various Chapters for differing ship types.
                               
                              
                              
                            
                           
                           
                         
                        
                        
                      
                     
                   
                  
                     
                        
                         
                        2.2 Plans to be submitted
                        
                        
                        
                        
                           
                           
                              
                              
                              2.2.1 Plans
                                 are to be of sufficient detail for plan approval purposes. For all
                                 areas of structure listed below the submitted plans are to show all
                                 plating thickness, stiffeners sizes and spacings, bracket arrangements
                                 and connections. Where appropriate, the plans should clearly show
                                 the allowance for corrosion margin or enhanced scantlings. Welding,
                                 constructional arrangements and tolerances are also to be submitted
                                 and this may be in the form of a booklet.
                               
                              
                              
                            
                           
                           
                           
                              
                              
                              2.2.2 In general
                                 all items of steel structure are to be shown except where they are
                                 ineffective in supporting hull girder and local loads and do not impinge
                                 on such structure.
                               
                              
                              
                            
                           
                           
                           
                              
                              
                              2.2.3 Equipment
                                 seating and supports are to be shown where they require additional
                                 stiffening and support to be incorporated in items of hull structure.
                                 In such cases the loading on the seating is also to be supplied. Generally
                                 total combined equipment weights on seating less than 0,5 tonnes need
                                 not be considered.
                               
                              
                              
                            
                           
                           
                           
                              
                              
                              2.2.4 Normally
                                 the plans for each item will be able to be contained on a few sheets.
                                 Unit or production drawings will not be accepted.
                               
                              
                              
                            
                           
                           
                           
                              
                              
                              2.2.5 Plans
                                 covering the following items are to be submitted:
                               
                              
                              
                              
                                 - Midship and other critical sections showing longitudinal and transverse
                                    material.
                                 
 
                                 - Profile and decks.
 
                                 - Shell expansion.
 
                                 - Structural continuity plan showing shadow areas of openings, longitudinally
                                    effective material and primary structural continuity material. 
                                 
 
                                 - Oiltight and watertight bulkheads.
 
                                 - Double bottom construction.
 
                                 - Pillars and girders.
 
                                 - Aft end construction.
 
                                 - Engine room construction.
 
                                 - Engine and thrust seatings.
 
                                 - Fore end construction.
 
                                 - Storing routes.
 
                                 - Deckhouses and superstructures.
 
                                 - Propeller brackets and appendages.
 
                                 - Rudder, stock and tiller.
 
                                 - Equipment.
 
                                 - Loading Manuals and stability information booklets, preliminary
                                    and final (where applicable).
                                 
 
                                 - Scheme of corrosion control (where applicable) including; location
                                    of anodes, method of attachment, details of cathodic protection system.
                                 
 
                                 - Ice strengthening.
 
                                 - Welding schedule.
 
                                 - Hull penetration plans including scuppers, sea connections, overboard
                                    discharges, arrangements and fittings.
                                 
 
                                 - Support structure for masts, derrick posts, cranes, RAS points,
                                    weapons handling/stowage or machinery lifting point and large items
                                    of equipment.
                                 
 
                                 - Bilge keels showing material grades, welded connections and detail
                                    design.
                                 
 
                                 - Flight deck arrangement and structure.
 
                               
                              
                              
                              
                              Additionally, for in-water survey the following plans and information
                                 are to be submitted:
                               
                              
                              
                              
                                 - Details showing how rudder pintle and bush clearances are to be
                                    measured and how the security of the pintles in their sockets are
                                    to be verified with the ship afloat.
                                 
 
                                 - Details showing how stern bush clearances are to be measured with
                                    the ship afloat.
                                 
 
                                 - Details of high resistant paint, for information only.
 
                               
                              
                              
                            
                           
                           
                           
                              
                              
                              2.2.6 The
                                 following supporting documents are to be submitted:
                               
                              
                              
                              
                                 - General arrangement.
 
                                 - Capacity plan.
 
                                 - Lines plan or equivalent.
 
                                 - Dry-docking plan.
 
                                 - Towing and mooring arrangements.
 
                                 - Corrosion margin policy.
 
                               
                              
                              
                            
                           
                           
                           
                              
                              
                              2.2.7 The
                                 following supporting calculations are to be submitted:
                               
                              
                              
                              
                                 - Equipment number.
 
                                 - Hull girder still water and dynamic bending moments and shear
                                    forces as applicable.
                                 
 
                                 - Midship section and other critical section modulus.
 
                                 - Structural items in the aft end, midship and fore end regions
                                    of the ship.
                                 
 
                               
                              
                              
                            
                           
                           
                           
                              
                              
                              2.2.8 In the
                                 process of plan approval and from Fatigue Design Assessment and Structural
                                 Design Assessment certain critical locations may be identified which
                                 require special attention. Plans and records of production are to
                                 be submitted in accordance with the construction monitoring procedures
                                 associated with the notation CM.
                                 
                               
                              
                              
                            
                           
                           
                           
                              
                              
                              2.2.9 Where
                                 the specific notations are applied for additional plans will be required.
                               
                              
                              
                            
                           
                           
                         
                        
                        
                      
                     
                   
                  
                     
                        
                         
                        2.3 Plans to be supplied to the ship
                        
                        
                        
                        
                           
                           
                              
                              
                              2.3.1 To facilitate
                                 the ordering of materials for repairs, plans listed in Vol  1, Pt  6, Ch  1,  2.2 Plans to be submitted 2.2.5 are to be carried on board
                                 the ship. They are to clearly indicate the disposition and grades
                                 (other than Grade A) of hull structural steel, the extent and location
                                 of higher tensile steel together with details of specification and
                                 mechanical properties, and any recommendations for welding, working
                                 and treatment of these steels.
                                 
                               
                              
                              
                            
                           
                           
                           
                              
                              
                              2.3.2 Similar
                                 information is to be provided where aluminium alloy or other materials
                                 are used in the construction.
                               
                              
                              
                            
                           
                           
                           
                              
                              
                              2.3.3 A copy
                                 of the final Loading Manual or Stability Information booklet, when
                                 approved, is to be placed on board the ship.
                               
                              
                              
                            
                           
                           
                           
                              
                              
                              2.3.4 Details
                                 of any corrosion control system fitted are to be placed on board the
                                 ship.
                               
                              
                              
                            
                           
                           
                           
                           
                           
                         
                        
                        
                      
                     
                   
                  
                     
                        
                         
                        2.4 Novel features
                        
                        
                        
                        
                           
                           
                              
                              
                              2.4.1 Where
                                 the proposed construction of any part of the hull or machinery is
                                 of novel design, or involves the use of unusual material, or where
                                 experience, in the opinion of LR, has not sufficiently justified the
                                 principle or mode of application involved, special tests or examinations
                                 before and during service may be required. In such cases a suitable
                                 notation may be entered in the Register Book.
                                 
                               
                              
                              
                            
                           
                           
                         
                        
                        
                      
                     
                   
                  
                     
                        
                         
                        2.5 Enhanced scantlings
                        
                        
                        
                        
                           
                           
                              
                              
                              2.5.1 Where scantlings in excess of the approved Rule requirement are fitted at
                                 defined locations as corrosion margins or for other purposes, the plans submitted for
                                 approval are to contain the enhanced scantling plan, together with the nominal
                                 thickness, less the enhancement adjacent, in brackets. See also
                                 Vol  1, Pt  6, Ch  6,  3.8 Corrosion margin.
                               
                              
                              
                            
                           
                           
                         
                        
                        
                      
                     
                   
                  
                     
                        
                         
                        2.6 Direct calculations
                        
                        
                        
                        
                           
                           
                              
                              
                              2.6.1  Direct
                                 calculations may be specifically required by the Rules and may be
                                 required for ships having novel design features or in support of alternative
                                 arrangements and scantlings. LR may, when requested, undertake calculations
                                 on behalf of designers and make recommendations with regard to suitability
                                 of any required model tests.
                               
                              
                              
                            
                           
                           
                         
                        
                        
                      
                     
                   
                  
                     
                        
                         
                        2.7 Exceptions
                        
                        
                        
                        
                           
                           
                              
                              
                              2.7.1 Ships
                                 of unusual form, proportions or speed, with unusual features, or for
                                 special or restricted service, not covered specifically by the Rules,
                                 will receive individual consideration based on the general requirements
                                 of the Rules.
                               
                              
                              
                            
                           
                           
                         
                        
                        
                      
                     
                   
                
             | 
         
         
            
               
                  
                  
                  
                  
                     
                        | Copyright 2022 Clasifications Register Group Limited, International Maritime Organization, International Labour Organization or Maritime
                           and Coastguard Agency. All rights reserved. Clasifications Register Group Limited, its affiliates and subsidiaries and their respective
                           officers, employees or agents are, individually and collectively, referred to in this clause as 'Clasifications Register'. Clasifications
                           Register assumes no responsibility and shall not be liable to any person for any loss, damage or expense caused by reliance
                           on the information or advice in this document or howsoever provided, unless that person has signed a contract with the relevant
                           Clasifications Register entity for the provision of this information or advice and in that case any responsibility or liability is
                           exclusively on the terms and conditions set out in that contract.
                           
                         | 
                          | 
                      
                   
                  
                
               
             |