7.3.1 Two
or more chilled water pumps are to be provided and be of sufficient
capacity to circulate chilled water at the flow rate and conditions
stated in the System Design Description with any one pump out of action.
7.3.2 The
chilled water pumps are to be located in separate compartments and
zones such that loss of one compartment or zone or failure in equipment
will not render the chilled water system inoperative.
NOTE:
This does not preclude locating the chilled
water pumps in the same compartment as the refrigeration plants mentioned
in Vol 2, Pt 7, Ch 5, 7.2 Refrigeration plant. Plants and their associated
chilled water pumps are to be arranged such that the pumps can be
cross-connected to other plants in the event of plant or pump failure.
In NS3 category ships the requirement for pumps to be located in separate
zones will not be insisted on where agreed by the Owner and included
in the System Design Description.
7.3.3 The
chilled water distribution system is to be of the constant flow type
with a pneumatically pressurised expansion tank. Expansion tanks are
to have a membrane fitted at the air/water interface to prevent ingress
of air into the chilled water system.
7.3.4 Each
user of chilled water is to be provided with means of isolation such
that the distribution system can operate at the designed constant
flow rate when the user is isolated.
7.3.5 The
arrangement of chilled water distribution pipes and isolation valves
is to ensure continuous availability of supply in the event of the
loss of any one compartment or zone.
7.3.6 Air
vent and drain valves with adequate bleed off points for filling and
in-service operational requirements are to be provided throughout
the system at all high and low points.
7.3.7 Provision
is to be made for filling and topping up the chilled water system.
A means is also to be provided for connecting the system to a dry
main for shore connection above the waterline. The shore connection
is to be sized sufficient to enable supply of cooling water for the
ship’s requirement as declared in the System Design Description
required by Vol 2, Pt 7, Ch 5, 1.3 Documentation required for design review 1.3.2.
7.3.8 Provision
is to be made to connect the chilled water distribution system to
an alternative source of water supply for use in emergency/action
damage conditions.
7.3.9 Sea-water
systems for refrigeration condensers are to be capable of being supplied
from not less than two independent sources located in separate compartments
and zones such that the loss of one compartment or zone, or failure
in equipment will not render loss of all sea-water sources. In NS3
category ships the requirement for refrigeration condensers to be
located in separate zones will not be insisted on where agreed by
the Owner and included in the System Design Description.
7.3.10 The
capacity of each source of sea-water required by Vol 2, Pt 7, Ch 5, 7.3 Water system 7.3.9 is to be sufficient for the
conditions stated in the System Design Description with any one source
out of action.