8.1.2 The manual
required by Pt 12, Ch 2, 8.1 General 8.1.1 is to be placed
on board and is to contain the following information:
-
Description of the
water jet propulsion system with details of function and design operating
limits. This is also to include details of support systems such as
lubrication, cooling and condition monitoring arrangements.
-
Identification of
all components together with details of any that have a defined maximum
operating life.
-
Instructions for
installation of the system on board ship with details of any required
specialised equipment.
-
Instructions for
commissioning at initial installation and following maintenance.
-
Maintenance and
service instructions to include inspection/renewal of bearings and
sealing arrangements. This is also to include component fitting procedures,
clearance measurements and lubricating oil treatment where applicable.
-
Actions required
in the event of fault/failure conditions being detected.
-
Precautions to be
taken by personnel working during installation and maintenance.