5.4.1 To facilitate
                                 the ordering of materials for repairs, plans are to be carried in
                                 the craft indicating the disposition and grades (other than Grade
                                 A) of hull structural steel, the extent and location of higher tensile
                                 steel together with details of specification and mechanical properties,
                                 and any recommendations for welding, working and treatment of these
                                 steels.
                              
                              
                              
                            
                           
                           
                           
                              
                              
                              5.4.2 Similar
                                 information is to be provided when aluminium alloy, fibre composite
                                 or other materials are used in the hull construction.
                              
                              
                              
                            
                           
                           
                           
                              
                              
                              5.4.3 A copy
                                 of the final Loading Manual, (where applicable) when approved, and
                                 details of the loadings applicable to approved decks, hatch covers
                                 and inner bottom are to be placed on board the craft.
                              
                              
                              
                            
                           
                           
                           
                              
                              
                              5.4.4 Details
                                 of any corrosion control system fitted are to be placed on board the
                                 craft.
                              
                              
                              
                            
                           
                           
                           
                              
                              
                              5.4.5 Copies
                                 of main scantling plans are to be placed on board.
                              
                              
                              
                            
                           
                           
                           
                              
                              
                              5.4.6 Electrical cables schedule of watertight penetrations (e.g. cable transit seal systems
                                 register).