Ballast Water Management CONVENTION
BWM Convention
Objective
Invasive aquatic species present a major threat to the marine ecosystems, and shipping has been identified as a major pathway for introducing species to new environments. The Ballast Water Management Convention aims to prevent the spread of harmful aquatic organisms from one region to another, by establishing standards and procedures for the management and control of ships' ballast water and sediments
Adoption
The International Convention for the Control and Management of Ships Ballast Water & Sediments was adopted by consensus at a Diplomatic Conference at IMO in London on Friday 13 February 2004.
Entry into Force
The convention enters into force on 8 September 2017.
The structure of the BWM Convention
The Convention is divided in Articles (22), and one Annex with 5 sections (A to E).To complement the Convention, the IMO adopted over 14 sets of technical guidelines and other documents contained in MEPC resolutions and circulars. Please refer to the attached document "BWM - Compilation of relevant Guidelines and guidance documents - April 2017" and document “MANUAL ON BALLAST WATER MANAGEMENT – HOW TO DO IT” Chapter 21.
Abbreviations
The following abbreviations are used:IBWMC : International Ballast Water Management Certificate;
SoC : Statement of Compliance for international ballast water management
BWMP : Ballast Water Management Plan;BWRB : Ballast Water Record Book;BWMS : Ballast Water Management System;BWTS : Ballast Water Treatment System;
EIF : Entry Into Force
Overview of the provisions
As per resolution MEPC.252(67) - Guidelines for port State control under the BWM Convention, The following compliance provisions are contains in the Convention regulation:
the discharge of ballast water shall only be conducted in accordance with the regulations of the BWM Convention (regulation A-2);
an IBWMC is required for all ships of 400 GT or above, excluding floating platforms, FSUs and FPSOs, as identified in regulation E-2;
a ship is required to have on board and implement a BWMP approved by the Administration;
a ship is required to have on board and maintain a BWRB which shall at least contain the information specified in appendix II of the BWM Convention, for a minimum period of two years after the last entry has been made (regulation B-2);
a ship is required to meet either the ballast water exchange standard (regulation D-1) or ballast water performance standard (regulation D-2 i.e. treatment system) in accordance with regulation B-3. Or in accordance with the schedule in resolution A.1088(28);
ballast water exchange is conducted at least 200 nm from the nearest land and in water at least 200 m in depth, or in cases where the ship is unable, at least 50 nm from the nearest land and in water at least 200 m in depth, or in a designated ballast water exchange area and is required to be conducted in accordance with regulation B-4;
sediment is removed and disposed from spaces designated to carry ballast water in accordance with the provisions of the ship's BWMP;
officers and crew shall be familiar with their duties in the implementation of ballast water management particular to the ship and ship's BWMP (regulation B-6);
any exemptions from the BWM Convention shall be recorded in the BWRB (regulation A-4.4) as well as records of any accidental and exceptional discharges (regulation B-2.3) and instances where ballast water was not exchanged in accordance with the BWM Convention (regulation B-4.5);
a ship is required to report accidents or defects that affect its ability to manage ballast water to the flag State and the port State (regulation E-1.7);
the condition of a ship, and its equipment, systems and processes shall be maintained to conform with the BWM Convention (regulation E-1.9); and
after any survey of a ship under regulation E-1.1 has been completed, no change shall be made in the structure, equipment, fittings, arrangements or material associated with the BWMP and covered by the survey without the sanction of the Administration, except the direct replacement of such equipment or fittings (regulation E-1.10).
IMO MANUAL ON BALLAST WATER MANAGEMENT – HOW TO DO IT
MEPC 71 approved “Manual on Ballast Water Management – How to do it”, to provide advice on the process of ratification, implementation and enforcement of the International Convention for the Control and Management of Ships' Ballast Water and Sediments, 2004Please refer to the attached file “MANUAL ON BALLAST WATER MANAGEMENT – HOW TO DO IT”
Unified interpretations to the BWM Convention and the BWMS Code
BWM.2/Circ.66 provides the consolidated text of all existing unified interpretations to the BWM Convention and the BWMS Code. Below table provide an indicated list of the revisions of this Circular.
| Revision | date | Purpose of the UI | Refer to |
|---|---|---|---|
| BWM.2/Circ.66 | 20 April 2018 | UI of appendix I (Form of the International Ballast Water Management Certificate) of the BWM Convention | Completion of the International Ballast Water Management Certificate - "Date installed" in relation to "Method of ballast water management used" |
| Rev.1 | 24 May 2019 | Updated UI with appropriate references to the Code for Approval of Ballast Water Management Systems (BWMS Code) | Completion of the International Ballast Water Management Certificate - "Date installed" in relation to "Method of ballast water management used" |
| Rev.2 | 13 December 2021 | UI to regulations E-1.1.1 and E-1.1.5 of the BWM Convention concerning the clarification of the date to be used for determining the implementation of mandatory commissioning testing of individual ballast water management systems. | Untitled |
| Rev.3 | 24 June 2022 | UI to appendix I to the BWM Convention (Form of International Ballast Water Management Certificate) concerning the principal ballast water management method(s) employed on the ship | Completion of the International Ballast Water Management Certificate - “the principal Ballast Water Management method(s) employed on this ship is/are” |
| Rev.4 | 14 February 2023 | - revised UI to regulation E-1.1.5 of the BWM Convention and the Form of the International Ballast Water Management Certificate, concerning commissioning testing of a ballast water management system which has undergone a major modification or an upgrade on board an existing ship in order to improve the performance of the BWMS and ensure compliance with the D-2 standard- UI to paragraph 4.10 of the BWMS Code, concerning requirements for the calibration of the BWMS components that take measurements | Untitled IMO UI of paragraph 4.10 of the BWMS Code (Survey item (BA) 1.2.1.21 of HSSC Guidelines – A.1156(32) |
| Rev.5 | 13 July 2023 | UI to regulations B-3.5 and B-3.10 of the BWM Convention and the Form of the International Ballast Water Management Certificate, concerning the "date of construction" for a ship which has undergone a major conversion in order to implement the BWM Convention | Unified interpretation for regulations B-3.5 and B-3.10 (i.e. date to meet the standard in regulation D-2) for a ship which has undergone a major conversion Completion of the International Ballast Water Management Certificate - "Date of construction" for a ship which has undergone a major conversion |
| Rev.6 | 19 May 2026 | UI to regulation D-3 of the BWM Convention, concerning installation date provisions applicable to ballast water management systems approved taking into account the 2016 Guidelines (G8) (resolution MEPC.279(70)) | Make BWMS Code Mandatory - amendments to regulations A-1 and D-3 |
Application
Untitled
Untitled
Untitled
According to Article 3, the BWM Convention applies to all ships designed or constructed to carry ballast water including submersibles, floating craft, floating platforms, FSUs and FPSOs.It will not apply to:
ships not designed to carry ballast water
ships of a Party which only operate in waters under the jurisdiction of that Party (subject to additionnal conditions as per Article 3 of BWM Convention)
ships of a Party which only operate in waters under the jurisdiction of another Party, (subject to additionnal conditions as per Article 3 of BWM Convention)
ships which only operate in waters under the jurisdiction of one Party and on the high seas (subject to additionnal conditions as per Article 3 of BWM Convention)
warships, naval auxiliary ships or other ships owned or operated by a state and used for time being only on government non-commercial service
ships with permanent ballast water in sealed tanks
Entry or re-entry of ships into exclusive operation within waters under the jurisdiction of a single Party
IMO developed Guidance on entry or re-entry of ships into exclusive operation within waters under the jurisdiction of a single Party (BWM.2/Circ.52/Rev.1)It provides guidance on entry or re-entry into exclusive operation pursuant to articles 3.2(b)-(d) (.i.e conditions under which the Convention does not apply to a ship), which will assist Administrations with respect to situations including ships (e.g. mobile offshore units) that may be assigned to extended operations in waters under the jurisdiction of a single Party following an international voyage or voyages.This Guidance sets out a process for ceasing application of the Convention to a ship in such circumstances.See the attached file "circular BWM.2/Circ.52/Rev.1”
Hopper dredgers
As per BWM.2/Circ.32, the provisions of the Convention are not applicable to the water in the hopper area of hopper dredgers. See the attached file "circular BWM.2/Circ.32"
Ships of non-Parties to the convention
According to Article 3, Parties shall apply the requirements of the BWM Convention as may be necessary to ensure that no more favourable treatment is given to such ships.Therefore, when trading internationally, ships flying a flag which is not party to the Convention may need to demonstrate compliance to PSC of Countries Parties to the Convention.
Ships subject to survey and certification
Untitled
Ships of 400 GT and above are subject to surveys and certification (excluding floating platforms, FSUs and FPSOs) (reg. E-1 paragraph 1).
However, Flag States shall establish appropriate measures for ships that are not subject to these provisions in order to ensure that appropriate provisions of the Convention are complied with. (reg. E-1 paragraph 2)As a consequence, reference is to be made to the flag procedure for Flag State policy (as an example, some Flag States may decide that ships < 400GT, floating platforms, FSUs and FPSOs are surveyed and issued with International Ballast Water Management Certificate).
Untitled
As per BWM.2/Circ.46, Mobile offshore units should comply with the provisions of the Convention and should be surveyed and issued with an IBWMC. See the attached file "circular BWM.2/Circ.46"
Untitled
Options for ballast water management for Offshore Support Vessels in accordance with the BWM Convention can be found in BWM.2/Circ.44. Generally, the process of survey and certification follows section E of the Convention. See the attached file "circular BWM.2/Circ.44"
Enforcement Time line
General
Untitled
On 8 September 2017, all ships subject to the Convention are required to:
Have on board an approved ballast water management plan BWMP (reg. B-1)
Have on board a ballast water record book BWRB (reg. B-2)
Carry out ballast water and sediment management on all voyages (reg. B-3) and comply with :
Standard in reg. D-1 - Ballast Water Exchange or
Standard in reg. D-2 - Ballast Water Performance (i.e. treatment system)
Untitled
On 8 september 2017, ships subject to survey and certification as per Ships subject to survey and certification are required to be issued with an IBWMC according to reg. D-1 or D-2 depending on ship's regulatory schedule for implementation.
Agreement on amendments to regulation B-3 of the Convention (adopted at MEPC 72 – April 2018)) - Implementation schedule of ballast water management for ships.
MEPC 71 - Draft Amendments to regulation B-3 of the BWM Convention
IMO MEPC 71 (July 2017) reached an agreement on draft amendments to regulation B-3 of the Convention (implementation schedule for compliance with the discharge standard described regulation D-2) with a view to their adoption at MEPC 72 (April 2018).See the attached file “MEPC 71-17-Add.1-Annex2 DRAFT AMENDMENTS TO REGULATION B-3 OF THE BWM CONVENTION”NB : The approved draft amendments to regulation B-3 of the BWM Convention (MEPC 71/17, annex 2) will be circulated to all Parties to the Convention and to all Members of the Organization immediately after the entry into force of the Convention.
These amendments clarify the implementation of discharge standard in regulation D-2 in particular:
Date of compliance with the standard described in regulation D-2 (BWMS) for new ships (New regulation B-3.5)
for "new ships" (ships constructed on or after 8 September 2017) : it is agreed to apply the entry-into-force date of the BWM Convention as the date to conduct Ballast Water Management that at least meet the standard described in regulation D-2.
Phase-in of compliance with the standard described in regulation D-2 (BWMS) for existing ships (New regulations B-3.1, 3.2 ,3.3, 3.4 and 3.10)
for "existing ships" (ships constructed prior to 8 September 2017), the IOPP renewal survey to be taken into account on or after 8 September 2017 as the start of the phase-in of conducting Ballast Water Management that at least meet the standard in regulation D-2 is :
1st renewal survey if :
- this survey is completed on or after 8 September 2019, or- a renewal survey (deharmonized IOPP or not) was completed on or after 8 September 2014 but prior to 8 September 2017
2nd renewal survey if :
- the 1st renewal survey following the entry into force of the BWM Convention is completed prior to 8 September 2019- Provided that renewal survey was not completed on or after 8 September 2014 but prior to 8 September 2017
Compliance with the standard described in regulation D-2 (BWMS) for non–IOPP ships (new regulation B-3.8)
Existing Ships which are not subject to hold an IOPP certificate shall comply with the standard described in regulation D-2 from the date decided by the Administration, but not later than 8 September 2024.
These amendments also confirmed the following principles / policy (new regulation B-3.9): Ships subject to compliance with B-3 will be required to comply with either regulation D-1 or regulation D-2, until such time as it is required to comply with regulation D-2.
These amendments apply (unless otherwise instructed by the Flag).
Adoption of Amendments to regulation B-3 – Res. MEPC.297(72)
Based on the agreement reached at MEPC 71, refer to MEPC 71 - Draft Amendments to regulation B-3 of the BWM Convention, MEPC 72 (April 2018) adopted the resolution MEPC.297(92) on amendments to regulation B-3. These amendments enter into force on 13 October 2019. Refer to attached file MEPC.297(72).
DETERMINATION OF THE DATE REFERRED TO IN REGULATION B-3, AS AMENDED, OF THE BWM CONVENTION – Res.MEPC.298(72)
MEPC 72 adopted Res. MEPC.298(72) related to the determination of the date referred to in regulation B-3 and confirmed that the” renewal survey” date is the renewal survey for the ship associated with the IOPP Certificate.
Unified interpretation for regulations B-3.5 and B-3.10 (i.e. date to meet the standard in regulation D-2) for a ship which has undergone a major conversion
Refer to IMO UI in circular BWM.2/Circ.66/Rev.5. see attached file circular BWM.2/Circ.66/Rev.5
Untitled
The following graph summarizes the provisions of amendments to regulation B-3 of the Convention adopted at MEPC 72 for ships constructed before 8 September 2017 (existing ships) :
New ships
Untitled
Ship constructed on or after 8 september 2017 are required to comply with the provisions of the convention (including and as per regulation D-2, i.e. ballast water management system) on delivery."Constructed" means a stage of construction where:
the keel is laid; or
construction identifiable with the specific ship begins; or
assembly of the ship has commenced comprising at least 50 tonnes or 1 percent of the estimated mass of all structural material, whichever is less; or
the ship undergoes a major conversion.
NB: IMO MEPC 72 has adopted amendments to regulation B-3 (implementation schedule compliance with the standard described regulation D-2 ) and confirmed that ships constructed on or after 8 September 2017 have to comply with the D-2 standard upon delivery.
Untitled
With regard to the term "major conversion", IMO has approved a clarification that a new installation of BWMS should not be treated as a major conversion (BWM.2/Circ.45). It also clarifies what is meant by a "change of ship type" according to regulation A-1.5.2.See the attached file "circular BWM.2/Circ.45”
Existing ships- Res. A.1088(28) superseded by res. MEPC.287(71) refer to 2.3.5
Untitled
See attached file "Resolution A1088 (28)"
NB: IMO MEPC 71 adopted RESOLUTION MEPC.287(71) – IMPLEMENTATION OF THE BWM CONVENTION which supersedes resolution A.1088(28) on Application of the International Convention for the Control and Management of Ships' Ballast Water and Sediments, 2004. Refer to Existing ships - RESOLUTION MEPC.287(71) – IMPLEMENTATION OF THE BWM CONVENTION
Existing ships - RESOLUTION MEPC.287(71) – IMPLEMENTATION OF THE BWM CONVENTION
MEPC 71 has adopted a resolution on implementation of the BWM Convention (MEPC.287(71)) with a view to facilitating the smooth and uniform implementation of the approved amendments to regulation B-3 which are referred to in Agreement on amendments to regulation B-3 of the Convention (adopted at MEPC 72 – April 2018)) - Implementation schedule of ballast water management for ships.
See the attached file: “RESOLUTION MEPC.287(71) IMPLEMENTATION OF THE BWM CONVENTION”
By this resolution, MEPC71 resolves that, in lieu of the implementation schedule recommended in resolution A.1088(28) and notwithstanding the schedule set forth in regulation B-3 of the Convention, the Parties should implement the draft amended regulation B-3 (MEPC 71/17, annex 2) immediately after entry into force of the Convention, with a view to avoiding the creation of a dual treaty regime during the time period between the entry into force of the Convention and the entry into force of the amended regulation B-3.
These amendments apply (unless otherwise instructed by the Flag).
This resolution supersedes resolution A.1088(28) on the Application of the International Convention for the Control and Management of Ships' Ballast Water and Sediments, 2004.
IOPP de-harmonisation prior to the EIF of BWMC
In case the owner request to advance IOPP renewal survey only (i.e de-harmonisation):- Some Flags States have instructed Recognised Organisation (RO) that no prior agreement on case-by-case basis is required for their Administration to accept such de-harmonisation (refer to the flag procedure and C&S Info # 1833 )- Otherwise, the MOC is to contact the Flag State on a case by case basis, to seek authorization and specific instruction if any. (Some Flag States have already provided same policy, refer to the flag procedure and C&S Info # 1833).The Owner always have the possibility to reduce voluntarily the period of class of the ship and to request to advance the class and statutory renewal surveys at the same time. In such a case, all class and statutory certificates will be harmonised and no prior Flag Agreement is normally necessary (refer to the flag procedure).Recognised Organisation (RO) will not accept to advance only the renewal surveys of all statutory certificates without advancing the class renewal survey at the same time.
Ballast Water Management Plan (BWMP) / Ballast Water Record Book (BWRB)
Ballast Water Management Plan (BWMP)
Untitled
Ships are required to have on board and implement a BWMP approved by the Administration (Regulation B-1). When duly delegated by the Flag administration to perform plan approval, DA-Mach / LPO reviews and approves these plans. See the related technical procedure BWMP is specific to each ship and includes a detailed description of the actions to be taken to implement the Ballast Water Management requirements and supplemental Ballast Water Management practices. Please refer the Guidelines for ballast water management and development of ballast water management plans (G4) - MEPC.127(53).
Contingency measures
MEPC 72 approved the “Guidance on contingency measures under the BWM Convention (BWM.2/Circ.62)”. The goal of this Guidance is to support ships and port States to apply sound and practical measures in the case of a ship unable to manage ballast water in accordance with its approved Ballast Water Management plan to meet the D-1 or D-2 standard, with a view to ensuring the protection of the marine environment and ship, safety and minimizing any impacts on the continuity of port and ship operations.
Consequently MEPC 73 (October 2018) adopted Res. MEPC.306(73) – Amendments to the guidelines for ballast water management and development of ballast water management plans (G4):Paragraph 4.3 is added in part B (NON-MANDATORY INFORMATION):"4.3 The ballast water management plan should include contingency measures developed taking into account guidelines developed by the Organization*."IMO (MEPC 73) agreed that each Member State may determine the timing for the incorporation of information on contingency measures in the BWMP of ships flying its Flag. Refer to flag procedures.
Temporary Storage of treated Sewage and/or grey Water in Ballast Water Tanks
MEPC 81 approved Guidance for the temporary Storage of treated Sewage and/or grey Water in Ballast Water Tanks (BWM.2/Circ.82). “There are exceptional situations where, to comply with coastal State regulations or inadequate reception facilities at ports, dry-docks and terminals, it may become necessary to store treated sewage and/or grey water in ballast water tanks. And the purpose of this guidance is to provide a procedure for the temporary storage of treated sewage and/or grey water in ballast water tanks.”BWMP of the ship should include a ship-specific change-over procedure, from ballast water storage to TS/GW storage and back to ballast water storage, including pump and piping associated with the dual-purpose BW tanks, with specific details on how the flushing is conducted. The BW tanks to be used for temporary storage of TS/GW should be identified in the BWMP. (BWM.2/Circ.82 para.15). Procedures provided as an addendum of the 'non-mandatory' section of the BWMP do not require re-approval of the BWMP, for the time being (pending the revision of regulation B-1 and Guidelines G4), and unless otherwise instructed by flag.
Challenging Water Quality Conditions
MEPC 81 adopted Interim guidance on the application of the BWM Convention to ships operating in challenging water quality (MEPC.387(81)). “The primary purpose of this Guidance is to assist ships in planning for compliance with the BWM Convention and the D-2 discharge standard when a type-approved ballast water management system (BWMS) that has been properly installed, operated and maintained encounters operational limitations or has difficulty meeting operational demand in challenging water quality (CWQ) conditions.”BWMP should include ship-specific guidance and procedures identified in the conceptual overview provided in figure 1 of the guidance. This planning is intended to facilitate ship operations and efficiency by optimizing the performance of BWMS in CWQ, reducing the need to bypass this environmentally protective equipment and decontaminate ballast tanks. Procedures provided as an addendum of the 'non-mandatory' section of the BWMP do not require re-approval of the BWMP, for the time being (pending the revision of regulation B-1 and Guidelines G4), and unless otherwise instructed by flag.
Amendments of the Ballast Water Management Plan (BWMP) (MEPC.370(80))
For consistent implementation of the changes introduced for the record-keeping and reporting process under the BWM Convention (refer to New Format of Ballast Water Record Book (BWRB) (MEPC.369(80)) - 1 February 2025), IMO adopted amendments to Guidelines for Ballast Water Management and development of Ballast Water Management Plans (G4) (MEPC.370(80)).Consequently, BWMPs shall be appropriately updated, in particular the part “RECORDING REQUIREMENTS” to reflect the changes introduces in record keeping and reporting process with the proper reference to BWM.2/Circ.80/rev.1.Retroactive application for existing ships, refer to Retroactive application on existing ships
See attached resolution MEPC.370(80)
Ballast Water Record Book (BWRB)
Untitled
Ships must have BWRB (Regulation B-2) to record when ballast water is taken on board; circulated or treated for Ballast Water Management purposes; and discharged into the sea. It should also record when Ballast Water is discharged to a reception facility and accidental or other exceptional discharges of Ballast Water.
BWRB entries shall be done taking into guidance in BWM.2/Circ.80/Rev.1 refer to Guidance on ballast water record-keeping and reporting (BWM.2/Circ.80/Rev.1)
BWRB entries shall be maintained on board the ship for a minimum period of two years after the last entry has been made and in the Company's control for a minimum period of three years.The BWRB may be an electronic record system, or may be integrated into another record book or system. It shall at least contain details as shown in Appendix II of the Convention.
New Format of Ballast Water Record Book (BWRB) (MEPC.369(80)) - 1 February 2025
Untitled
IMO adopted amendments to appendix II of the Annex to the BWM Convention in relation to the Form of Ballast Water Record Book (resolution MEPC.369(80)). This comes into force on 1 February 2025.This revised Form of BWRB proposes the list of items to be recorded in "Code" (letter A to H) and "Item" (number) format and additional details that must be recorded for different ballast water operations, similarly to the Oil record book. See attached resolution MEPC.369(80)
Retroactive application on existing ships
Existing ships are required, from 1 February 2025, to amend BWRBs, BWMPs, as appropriate, and record ballast water operations taking into account the IMO Guidance on Ballast Water Record-Keeping and Reporting to BWM.2/Circ.80/rev.1.Unless otherwise instructed by the ship’s Flag, Recognised Organisation (RO) surveyor shall verify onboard, during the first periodical survey under the BWMC on or after 1 February 2025, that:- BWRB comply with the new format outlined in resolution MEPC.369(80)- BWMP is updated to reflect the changes introduces in record keeping and reporting process with the proper reference to BWM.2/Circ.80/rev.1, as per resolution MEPC.370(80).
Guidance on ballast water record-keeping and reporting (BWM.2/Circ.80/Rev.1)
IMO approved the Guidance on Ballast Water Record-Keeping and Reporting (BWM.2/Circ.80) to provide detailed instructions on when and how to record ballast water operations in the BWRB. The guidance includes standardized format, examples and instructions for chronologically recording each ballast water operation, as well as requirements for storing the records.In addition, it includes an updated example of ballast water reporting form (BWMRF) which may be submitted before reaching a port, as well as an example form for voluntary tank-by-tank logging of ballast water operations.
See attached circular BWM.2/Circ.80/Rev.1
Use of electronic record books - entry into force 1 October 2025
Untitled
IMO adopted through resolutions MEPC.383(81), amendments to the Convention, which is expected to enter into force in October 2025. These amendments to regulations A-1 and B-2 of the BWM Convention, concern the use of electronic record books.IMO also adopted related Guidelines for the use of electronic record books under the BWM Convention – resolution MEPC.372(80)
Approval of electronic record books and issuance of the ship’s Declaration
An Electronic Record Book means a device or system, approved by the Administration, used to electronically record the required entries for discharges, transfers and other operations as required as required under the BWM Convention in lieu of a hard copy record book, taking into account the “Guidelines for the use of electronic record books under the BWM Convention”, resolution MEPC.372(80).Any electronic system deemed to meet the above criteria shall be provided with a “Declaration of BWM Convention electronic Record Book”, to be carried on board the ship for the purpose of regulatory surveys or inspections.Delegating the assessment of the electronic record book against these Guidelines and the issuing of a declaration on behalf of the Administration by recognized organizations (ROs) is at the discretion of the Administration. Refer to flag procedures.(Some flag administration may not accept electronic record book refer to flag procedures)
Recognised Organisation (RO) Approval of electronic record books under BWM Convention
When duly delegated by the Flag Administration, DA_ELEC will assess the conformity of the specific electronic record book to be installed on the concerned ship and issue a Type Approval Certificate.Refer to the flag procedure for possible specific Flag instructions and requirements in relation to the assessment and approval process
Recognised Organisation (RO) Issuance of a Declaration for BWM Convention electronic record book
When duly delegated by the ship’s Flag Administration to issue a “Declaration for BWM Convention electronic record book” on their behalf (refer to flag procedures), Recognised Organisation (RO) Surveyor shall verify onboard that:- A declaration by the installer that the system is installed in accordance with current regulations, that its performance has been tested and that it is in perfect working order, is available on-board.- [Recognised Organisation (RO)] Type Approval Letters are available on-board (i.e. Flag Administration may have specific instruction on acceptance of TAC)- Any Flag Administration possible specific instructions or requirements are implemented– refer to the flag procedure.At the completion of a satisfactory verification onboard, Recognised Organisation (RO) surveyor issues a “Declaration for BWM Convention electronic record book” on behalf of the Flag Administration (refer to the flag procedure), which is to be available on-board.“Declaration for BWM Convention electronic record book” based on format provided in the appendix of resolution MEPC.372(80) will be available in ASMS2 Certificate.
Standards for Ballast Water Management
Ballast water exchange (reg.D-1)
Ships performing Ballast Water exchange shall do so with an efficiency of 95 per cent volumetric exchange of Ballast Water.For ships exchanging ballast water by the pumping-through method, pumping through three times the volume of each ballast water tank shall be considered to meet the standard described in paragraph 1. Pumping through less than three times the volume may be accepted provided the ship can demonstrate that at least 95 per cent volumetric exchange is met.As per MEPC.288(71) - 2017 Guidelines for ballast water exchange (G6), There are three methods of Ballast Water exchange which have been evaluated and accepted by the IMO.
The three methods are
the sequential method
the flow-through method
the dilution method.
The flow-through method and the dilution method are considered as "pump through" methods.Ballast Water Exchange safety issues will be reviewed by the LPO (when duly delegated) during the course of examination of the BWMP. See the related technical procedure
Ballast water performance standard (reg.D-2)
Ships conducting ballast water management shall comply with the ballast performance standard prescribed in regulation D-2.Discharge water shall contain:
Approval of Ballast Water Management System (reg.D-3) (BWMS)
Untitled
BWMS means any system which processes ballast water such that it meets or exceeds the ballast water performance standard in regulation D-2. The BWMS includes ballast water treatment equipment, all associated control equipment, monitoring equipment and sampling facilities.
The BWMS must have a type approval which refers to:
Guidelines for Approval of Ballast Water Management Systems (G8) (using active substances and not using-active substances) - (MEPC.174(58) or MEPC.279(70)) or the Code for approval of ballast water management systems (BWMS Code - MEPC.300(72))
and as applicable to,
Procedure for Approval of Ballast Water Management Systems that make use of Active Substances (G9) - MEPC.169(57)
Approval of a system is intended to screen-out management systems that would fail to meet the standards prescribed in regulation D-2 of the ConventionRefer to the lists of BWMS which received Basic/Final Approval from IMO and which received Type Approval Certification by their respective Administrations:
http://www.imo.org/en/OurWork/Environment/BallastWaterManagement/Pages/BWMTechnologies.aspx
Type Approval process
2 Process
Revision of G8 guidelines
IMO MEPC 70 adopted revised Guidelines for approval of ballast water management systems (G8) - MEPC.279(70)Revised Guidelines include :- more robust test and performance specifications - more detailed requirements for type approval reporting and control & monitoring equipment among othersThe type approval process is expanded, with detailed requirements for land-based, shipboard, and installation survey & commissioning procedures.These revised G8 Guidelines apply when approving ballast water management systems as soon as possible, but not later than 28 October 2018.
This guidelines will be revoked when the BWMS Code takes effect on 13 October 2019. Refer to Code for approval of ballast water management systems (BWMS Code)
Code for approval of ballast water management systems (BWMS Code)
Untitled
IMO MEPC 70 adopted the 2016 Guidelines for approval of ballast water management systems (G8) (resolution MEPC.279(70)) and agreed that they should be made mandatory after the entry into force of the BWM Convention and renamed as "Code for approval of ballast water management systems" (BWMS Code).
Consequently, MEPC 72 adopted the BWMS Code – Res.MEPC.300(72), which takes effect on 13 October 2019.
Make BWMS Code Mandatory - amendments to regulations A-1 and D-3
MEPC 72 adopted consequential amendments to regulations A-1 and D-3 of the Ballast Water Management Convention by resolution MEPC.296(72) to make the BWMS Code mandatory. These amendments enter into force on 13 October 2019.As per Regulation D-3.1 as amended by resolution MEPC.296(72):.1 ballast water management systems installed 1 on or after 28 October 2020 shall be approved in accordance with the BWMS Code, as may be amended; and.2 ballast water management systems installed 1 before 28 October 2020 shall be approved taking into account the guidelines 2 developed by the Organization or the BWMS Code, as may be amended.1 Refer to paragraph 2 of the Unified interpretation of appendix I (Form of the International Ballast Water Management Certificate) of the BMW Convention related to "date installed" contained in BWM.2/Circ.66/Rev.4. Refer to para. “Date installed” to be used in IBWMC
2 Refer to resolutions MEPC.125(53), MEPC.174(58) or MEPC.279(70), as appropriate.
Acceptance of the Type approved BWMS onboard ships
Untitled
It is to be verified that the TAC is acceptable to the Ship's Flag Administration according to the Flag's instruction given in the flag procedure. In case of doubt, the Flag State is to be contacted on a case by case basis through the MOC.
Untitled
As per IMO resolution MEPC.279(70) - Guidelines for approval of ballast water management systems (G8) :- ballast water management systems installed on ships on or after 28 October 2020 should be approved taking into account the revised Guidelines (G8) set out in resolution MEPC.279(70)- ballast water management systems installed on board ships prior to 28 October 2020 should be approved taking into account either resolution MEPC.174(58), or preferably the revised Guidelines (G8) set out in resolution MEPC.279(70),The word “installed” means the contractual date of delivery of the ballast water management system to the ship. In the absence of such a date, the word “installed” means the actual date of delivery of the ballast water management system to the ship. Refer to para. “Date installed” to be used in IBWMC
After 13 October 2019, the provisions of Regulation D-3.1 as amended by resolution MEPC.296(72) will apply. Refer to para.Make BWMS Code Mandatory - amendments to regulations A-1 and D-3
Approval & installation summary
The following graph summarizes the timeline for approval and installation of BWMS
4 Prototype Ballast Water Treatment Technologies (reg. D-4)
Regulation D-4 covers Prototype Ballast Water Treatment Technologies. It allows for ships participating in a programme approved by the Administration to test and evaluate promising Ballast Water treatment technologies to have a leeway of five years before having to comply with the requirements of Regulation D-2.For any ship that, after the date on which the standard in regulation D-2 has become effective for it, participates in a programme approved by the Administration, taking into account Guidelines developed by IMO, to test and evaluate promising Ballast Water technologies with the potential to result in treatment technologies achieving a standard higher than that in regulation D-2, the standard in regulation D-2 shall cease to apply to that ship for five years from the date of installation of such technology.
Survey
General
Ships (refer to Ships subject to survey and certification) shall be subject to surveys specified below:
An initial survey before the ship is put in service or before the Certificate is issued for the first time.
This survey shall verify that the BWMP and any associated structure, equipment, systems, fitting, arrangements and material or processes comply fully with the requirements of the Convention.
It includes mainly:- Confirmation of the availability of the approved BWMP, of the BWRB- Confirmation of the availability of the Certificate(s) for type approval / equipment manuals for major components / approved operations and technical manual / installation specifications and commissioning procedures / initial calibration procedures for BWMS- Confirmation of the satisfactory installation and operation of BWMS in accordance with the technical installation specification and manufacturer's equipment specification.
An annual survey within three months before or after each Anniversary date.
This survey includes a general inspection of the structure, any equipment, systems, fittings, arrangements and material or processes associated with the BWMP to ensure that they have been maintained to conform with the provisions of the Convention and remain satisfactory for the service for which the ship is intended.
An intermediate survey within three months before or after the second Anniversary date or within three months before or after the third Anniversary date of the Certificate, which shall take the place of one of the annual surveys
This survey shall ensure that the equipment, associated systems and processes for Ballast Water Management fully comply with the applicable requirements and are in good working order.
A renewal survey at intervals specified by the Administration, but not exceeding five years
This survey shall verify that the BWMP and any associated structure, equipment, systems, fitting, arrangements and material or processes comply fully with the applicable requirements of this Convention.
An additional survey, either general or partial, according to the circumstances, shall be made after a change, replacement, or significant repair of the structure, equipment, systems, fittings, arrangements and material necessary to achieve full compliance with this Convention.
Additional survey shall be held when ballast water management systems (BWMS) are retrofitted on an existing ship to which an International Ballast Water Management Certificate was previously issued.
Mandatory Commissioning testing of ballast water management systems
Mandatory commissioning testing of BWMS installed on or after 1 June 2022- Amendments to regulation E-1.1.1 and E-1.1.5 of BWM Convention – Entry into Force 1 June 2022
Untitled
IMO adopted the amendments to regulation E-1 of the BWM Convention (MEPC.325(75) - Entry into force on 1 June 2022), which will require commissioning testing at initial survey (i.e. for new ships) and at an additional survey (i.e. new BWMS installations on existing ships).
IMO (MEPC 74) took the following decisions (MEPC 74/18):
4.54 The Committee endorsed the view that commissioning testing should begin as soon as possible in accordance with BWM.2/Circ.70 and agreed to reflect this in the requisite resolution for the adoption of the relevant amendments to mandatory instruments. As an interim measure, the Committee urged Administrations to provide the recognized organizations which acted on their behalf with written and clear instructions in relation to the conduct of indicative analysis testing of BWMS at the time of their commissioning on board ships flying their flag, including what actions were to be taken in the event of this testing demonstrating non-compliance.4.55 The Committee also endorsed the view that commissioning testing should not be applicable to ships that had already installed a BWMS and were certified for compliance with regulation D-2.4.56 The Committee confirmed that the analysis undertaken in the context of commissioning testing would be indicative and agreed to reflect this in the requisite resolution for the adoption of the relevant amendments to mandatory instruments.
Untitled
The commissioning testing applies to any new installation(1) of BWMS on or after 1 June 2022 (There is no retroactive application for existing ships that had already installed a BWMS and are certified with D-2 standard).
(1) Refer to below IMO Unified Interpretation for the date to be used for determining the implementation of mandatory commissioning testing (BWM.2/Circ.66/Rev.4):
1.1 Irrespective of new ships under construction subject to regulation E-1.1.1 or existing ships retrofitting ballast water management system(s) (BWMS) on board subject to regulation E-1.1.5, the commissioning testing of individual BWMS taking into account the guidelines developed by the Organization* should be conducted if the initial or additional survey is completed on or after 1 June 2022. If the initial or additional survey is completed before1 June 2022, the commissioning testing of individual BWMS remains subject to the specific requirements of the Administration(s).
1.2 In case an installed BWMS on board a ship undergoes an upgrade or change to a major component as defined under paragraph 3.9 of the BWMS Code, the BWMS should be regarded as a newly installed BWMS. A commissioning test should be conducted in accordance with regulation E-1.1.5 of the BWM Convention and an International Ballast Water Management Certificate (IBWMC) for that ship should be re-issued accordingly
*Refer to the 2020 Guidance for the commissioning testing of ballast water management systems (BWM.2/Circ.70/Rev.1), as amended.
2020 Guidance for the commissioning testing of ballast water management systems(BWM.2/Circ.70/Rev.1)
Untitled
IMO (MEPC 73 – October 2018) had approved BWM.2/Circ.70 on Guidance for the commissioning testing of ballast water management systems. See attached file BWM.2/Circ.70The purpose of commissioning testing is to validate the installation of a ballast water management system (BWMS) by demonstrating that its mechanical, physical, chemical and biological processes are working properly. Commissioning testing is not intended to validate the design of type-approved BWMS that are approved by the Administration.
Untitled
IMO approved BWM.2/Circ.70/Rev.1 - 2020 Guidance for the commissioning testing of ballast water management systems for a consistent implementation of the revised regulation E-1 (Amendments to regulation E-1 related to Commissioning testing of ballast water management systems - Resolution MEPC.325(75)). See attached file BWM.2/Circ.70/Rev.1
For that purpose sampling and analysis of ballast water and Verification of the self-monitoring equipment have to be conducted by approved Service Suppliers. Refer to Service Suppliers engaged in Sampling and Analysis of ballast water and Verification of the self-monitoring equipment during Commissioning Testing of Ballast Water Management Systems (BWMS), for Statutory purposes.
Service Suppliers engaged in Sampling and Analysis of ballast water and Verification of the self-monitoring equipment during Commissioning Testing of Ballast Water Management Systems (BWMS), for Statutory purposes.
Service suppliers engaged in Commissioning Testing of BWMS are to be approved as per the requirements of IACS UR Z17 (Annex, para.18), as transposed in NR533 (entry into force 1st January 2022). Please also refer to the statutory service suppliers approval procedure
Recommendation for conducting commissioning testing of Ballast Water Management Systems (IACS REC 180)
IACS published guidance in Rec. 180 to facilitate a uniform approach to conducting the commissioning tests of BWMS. Recognised Organisation (RO) Surveyor is to take into consideration the provisions of this guidance for the purpose of verification that tests are conducted according to procedures developed by the service supplier and as approved by Recognised Organisation (RO) under IACS UR Z17. Refer to the attached file “REC-180”
Survey item in HSCC guidelines
2017 HSSC Guidelines – A.1120(30)
IMO MEPC 71 instructed III 4 to introduce provisions in the HSSC Survey Guidelines for validating the compliance of individual BWMS with regulation D-2, in conjunction with their commissioning. Consequently, the HSSC Survey Guidelines, adopted by resolution A.1120(30)) . It includes a new survey item (BI)1.1.2.19 . This is the survey item currently implemented in ASMS items (item BWM205).
2019 HSSC Guidelines – A.1140(31)
IMO (Sub-Committee III 6 - July 2019) have updated the Survey Guidelines under the HSSC to ensure that:
the validation of BWMS at their commissioning be incorporated for all ships, including new ballast water management system installations on existing ships.
Considering that the commissioning connected to the installation of BWMS on board existing ships might be during an annual survey, an intermediate survey, a renewal survey or an additional survey, modification have been done to the survey guidelines including a new section “Additional surveys (BAd). Refer to 2019 HSSC Guidelines – A.1140(31)
In addition, IMO agreed to add a footnote to the survey item (BI)1.1.3.17 (ASMS survey item BWM205A) to make reference to BWM.2/Circ.70.
Refer also to the flag procedure for possible Flag specific requirements
ASMS Survey items
BWM.2/Circ.7 and 2017 HSSC Guidelines – A.1120(30)
(Pending to the entry into force of the IBWMC, IMO MEPC 55 (October 2006) approved the circular BWM.2/Circ.7 - Interim Survey Guidelines for the purpose of the International Convention for the Control and Management of Ships' Ballast Water and Sediments under the Harmonized System of Survey and Certification)
Following the entry into force of the Convention, the provisions of circular BWM.2/Circ.7 have been incorporated in the HSSC guidelines as set out in the resolution A.1120(30). ASMS survey items are based on those provisions.
ASMS survey check list are available when selecting the survey code:IBWM: Initial survey Ballast Water Management (for existing ships)BWMA: Ballast Water Management Annual SurveyBWMI: Ballast Water Management Intermediate Survey
BWMR: Ballast Water Management Renewal SurveyBWMO: Ballast Water Management Occasional survey
2019 HSSC Guidelines – A.1140(31)
Survey Guidelines under the Harmonized System of Survey and Certification (HSSC), 2019 - resolution A.1140(31) adopted at IMO 31st Assembly Meeting includes:
Amendments to the survey items in light of the existence of
the Guidelines for approval of ballast water management systems (G8) (resolution MEPC.174(58));
the 2016 Guidelines for approval of ballast water management systems (G8) (resolution MEPC.279(70)); and
the BWMS Code as adopted by resolution MEPC.300(72),
that might be applicable to BWMS installed on board existing and new ships, and different requirements among these versions.
New section of survey item “(BAd) 1.5 Additional surveys” with subclauses for the specific content of additional survey in relation to the installations of BWMS on existing ships.As a consequence, new ASMS survey code BWMC: Ballast Water Management Additional survey, shall be selected when ballast water management systems (BWMS) are retrofitted on an existing ship to which an International Ballast Water Management Certificate was previously issued.
IMO UI of paragraph 4.10 of the BWMS Code (Survey item (BA) 1.2.1.21 of HSSC Guidelines – A.1156(32)
IMO approved a unified Interpretation to paragraph 4.10 of the BWMS Code, concerning requirements for the calibration of the BWMS components that take measurements (Circular BWM.2/Circ.66/Rev.4). Consequently this interpretation applies to the checklist item (BA) 1.2.1.21 of Res.A.1156(32).
Certification
Alternate procedure to 6.2 and 6.5 for Recognised Organisation (RO) classed ships subject to statutory certification in accordance with Regulation D-1 only of the BWM Convention (issuance of IBWMC prior to EIF)
The following alternative procedure applies in case of ships flying a Flag:
which has not ratified the Convention, or which has ratified the Convention but which has not delegated/authorized Recognised Organisation (RO) (i.e issuance of a Statement of Compliance by Recognised Organisation (RO), refer to 6.4) except UK/REG (refer to the flag procedure); or
which has ratified the Convention and which has delegated Recognised Organisation (RO), except Singapore, Sweden, New Zealand (Refer to flag procedures for these flags).
In accordance with IMO BWM.2/Circ.40 "Issuance of Ballast Water Management Certificates prior to entry into force of the BWM Convention and Ballast Water Management Plans approved according to resolution A.868(20)" , paragraph 3, an International BWM Certificate or a Statement of Compliance depending on the ship's Flag , will be issued, before the entry into force of the Convention, in accordance with Regulation D-1, and upon receipt of the BWM plan for approval, with the following annotation:
Annotation on International Ballast Water Management Certificate: "The validity of this certificate begins from 8th September 2017 provided the BWM plan on-board will be approved not later than 8th December 2017 (ref: IMO BWM.2/Circ.40)" Certificates issued through Certificate Editor prior to 8 September 2017 will contain the above statement. The subsequent survey dates will be calculated from the initial survey date.
Annotation on Statement of Compliance: "This Statement of Compliance is valid provided the BWM plan on-board will be approved not later than 8th December 2017 (ref: IMO BWM.2/Circ.40)" SoC issued through Certificate Editor will contain the above statement.
and
Above Certificate or SoC with above referenced annotation might be issued administratively (without Recognised Organisation (RO) Surveyor attendance on-board) upon receipt of the BWM plan for approval, for a maximum validity of 5 years and with the "completion date of the survey on which the certificate is based" being the date of the last statutory survey.
Refer also to flag procedures for possible additional Flag Requirements
The CD is to send the letter in attached file “Letter_Owner_BWM_Plan” upon issuance of the International Ballast Water Management Certificate or SoC in accordance with this alternate procedure; in accordance with FM instructions, the corresponding invoice should also be issued at this time.
International Ballast Water Management Certificate
An IBWMC is to be issued after successful completion of an initial survey for a period specified by the Administration that shall not exceed five years.
IBWMC is issued when duly delegated by the Flag State, since 8 September 2016.
Issuance and validity of the first IBWMC for existing ship
- For ships complying with D1 only, the validity cannot exceed the date of IOPP renewal following EIF- Validity is maximum 5 years after initial survey (unless performed within 3 months before expiry date of IOPP or Harmonized certificate, for harmonization of IBWMC )- Preferred option is harmonization with all other certificates or- Harmonization with IOPP certificate only, in case IOPP is de-harmonized- Refer also to the flag procedure
Completion of the International Ballast Water Management Certificate - "Date of construction" for a ship which has undergone a major conversion
IMO approved the circular BWM.2/Circ.66/Rev.5 which provide a clarification on the issue regarding the item "Date of construction" in the Form of International Ballast Water Management Certificate (IBWMC) in appendix I of the BWM Convention for a ship which has undergone a major conversion. See attached file circular BWM.2/Circ.66/Rev.5.
Completion of the International Ballast Water Management Certificate - "Date installed" in relation to "Method of ballast water management used"
Untitled
IMO approved the unified interpretation of appendix I (Form of the International Ballast Water Management Certificate) of the BWM Convention - BWM.2/Circ.66/Rev.4. It provides a UI on how the IBWMC should be completed for the "Date installed" in relation to "Method of ballast water management used”
“Date installed” to be used in IBWMC
For the purpose of completing the International Ballast Water Management Certificate, the date when commissioning has been completed in accordance with section 8 of the BWMS Code (resolution MEPC.300(72)) should be used.Notwithstanding the above, it should be noted that, with regard to the deadline for installing a ballast water management system, operative paragraph 5 of resolution MEPC.300(72) (Code for Approval of Ballast Water Management Systems) is as follows:"5 RESOLVES that, for the purpose of operative paragraph 4 of this resolution, the word "installed" means the contractual date of delivery of the ballast water management system to the ship. In the absence of such a date, the word "installed" means the actual date of delivery of the ballast water management system to the ship;"Consequently, two dates, i.e. the contractual date of delivery or the actual date of delivery, and the date following commissioning and operation, may exist in relation to installing a ballast water management system.
Completion of the International Ballast Water Management Certificate - “the principal Ballast Water Management method(s) employed on this ship is/are”
Untitled
By resolution MEPC.325(75), IMO adopted the amendments to the BWM Convention regarding, inter alia, the form of the International Ballast Water Management Certificate (IBWMC), which added a new item "other approach in accordance with regulation" into the principal ballast water management method(s) employed on a ship.This revised form is available in ASMS Certificate from 1 June 2022. Unless otherwise instructed by the flag (refer to flag procedures), when the ship is not using "other approach in accordance with regulation" (i.e. principal method is in accordance/subject to D-1, D-2 or D-4) and in accordance with of MSC-MEPC.5/Circ.6 para.3.1, certificate is not required to be re-issued until its expiry.In order to facilitate and harmonise the completion of the section “principal Ballast Water Management method(s) employed on this ship is/are”, IMO has approved Circular BWM.2/Circ.66/Rev.4. This circular clarifies, for different scenarios of method(s) employed, the appropriate record in the certificate. See attached circular BWM.2/Circ.66/Rev.4.
Untitled
After the date for which the ship is required to conduct ballast water management that at least meets the standard described in regulation D-2, only D-2 shall be ticked in the IBWMC. Refer to BWM.2/Circ.66/Rev.3
NB: Conducting the ballast water management that meet the standard described in regulation D-1, as a contingency measures described in the BWMP, does not need to be reported in the IBWMC.
Statement of Compliance for international ballast water management (SoC)
SoC may be issued, upon owner's request and according to the provisions of this TNS, in case of a ship flying a Flag:
- which has not ratified the Convention, or- which has ratified the Convention but which has not delegated / authorized Recognised Organisation (RO)
Existing SoC
Existing Recognised Organisation (RO) SoC already issued are to be replaced by an IBWMC, when duly delegated by the Flag State(and when the Flag state is party to the Convention), in accordance with the provisions of this TNS and following satisfactory verification on the occasion of an occasional survey or annual survey of the following:
No modification on the ship / BWMS affecting the conditions based on which the SoC was initially issued
An approved BWMP is available on board.
A BWRB is available on board.
The BWMS, as appropriate, is installed and functioning correctly.
Survey code BWMO will have to be selected
Attestation for non-applicability of the convention
On a case by case basis and at owner’s request, an attestation may be issued with prior agreement from MOC to declare that:The ship is not designed or constructed to carry Ballast Water.