4.2.1 The necessary plans, calculations, particulars and specifications of the
unit and equipment are to be submitted for the approval of the Committee, together
with certificates or other evidence of proving tests which have been carried out,
and of surveys conducted by recognized authorities. The existing or proposed
maintenance and operating instructions, as applicable, and a statement of the level
of pilot and crew training, considered by the designer or Owner to be adequate for
the operation of a submersible, are to be provided for consideration.
4.2.2 If the unit has already been in service, the log book is to be made
available for inspection by the Surveyors.
4.2.4 On the basis of a satisfactory report from the Surveyors on the survey,
the Committee will assign a class notation as applicable. The date of completion of
the survey will normally be the date taken as of initial acceptance by the
Committee. This date will be displayed on the Interim Certificate and Class Direct
and recorded on the Certificate of Class. The stated date will govern the time of
the first Special survey.