Section
20 Refrigerated cargo installations
20.1 Annual Surveys
20.1.1 The
Surveyors are to examine the machinery under working conditions as
soon as practicable after a ship's arrival at a port of discharge
before the cargo is unloaded. An examination of the refrigerated cargo
installation log book (or other records) is to be made and any breakdowns
or malfunctions of the plant during the previous twelve months are
to be noted and reported to the Committee.
20.1.2 A
General Examination of the refrigerating plant is to be carried out,
and satisfactory operation of safety devices, controls and thermometry
is to be verified. Insulated cargo spaces are to be inspected, and
the condition of insulation, lining, scuppers, hatches, coolers, air
ducting and air refreshing arrangements are to be checked. The Surveyors
may request opening out of suspected items, or recommend repair or
renewal of defective items, as a result of inspection.
20.1.3 A
General Examination is to be made of electrical motors driving refrigerant
compressors, pumps and fans, together with their controlgear and cables.
Random tests for insulation resistance are to be made on the cables,
switchgear, motors, etc. and this resistance is to be not less than
1 MΩ between individual conductors and between those conductors
and earth. The installation may be subdivided for the purpose of this
test, and the Surveyor may at his discretion accept the results of
tests carried out by a competent member of staff or contractor.
20.1.4 A
survey book or other permanent record is to be kept on board the ship
to show the date of examination of the various parts. This is to be
available to the Surveyor at all times, and is to be signed by the
Surveyor on the occasion of each survey.
20.2 Special Surveys
20.2.1 At
the first Special Survey, the examinations outlined below are to be
carried out. Where there is a programme of replacement instead of
maintenance on board, alternative survey arrangements will be considered.
Each case will be given individual consideration.
20.2.2 Detailed
internal examination of each reciprocating compressor, opened up for
inspection of cylinders, pistons, connection rods, valves, seats,
glands, relief devices, filters, lubrication and crankshaft.
20.2.3 For
screw-type compressors, the period before opening up may be extended
to six years or 25 000 running hours, whichever is the earlier. Examination
should be made of rotors, clearances, gearing, etc.
20.2.4 Refrigerant
condenser cooling water pumps, including standby pump(s) which may
be used on other services, are to be opened up and their working parts
exposed.
20.2.5 Primary
and secondary refrigerant pumps are to be opened up and their working
parts exposed.
20.2.6 The
water end covers of condensers are to be removed for examination of
the tubes, tubeplates and covers.
20.2.7 In
the case of pressure vessels covered by insulation, any evidence of
dampness or deterioration of the insulation which could lead to external
corrosion of the vessels or their connections is to be investigated.
20.2.8 Sufficient
insulation is to be stripped from insulated pressure vessels to allow
the condition of the vessels and their connections to be ascertained.
Care is to be taken that in replacement of the insulation, the vapour
sealing of the outer covering is made good.
20.2.9 Sufficient
insulation is to be stripped from pipes carrying the refrigerant at
various points of the system both outside and inside the insulated
chambers to permit the condition of the pipes to be ascertained. Sections
of piping exposed are to include locations where lengths of piping
have been connected by screwed couplings or butt welding. Care is
to be taken that when ungalvanized portions of the piping in way of
joints have been exposed, they are to be suitably coated and taped,
after pressure testing, to prevent corrosion. On replacement of the
insulation, the vapour sealing of the outer covering is to be made
good.
20.2.10 A
General Examination is to be made of all pressure relief valves and/or
safety discs throughout the refrigerating plant to ensure that they
are in good order and covered by current certification. However, no
attempt is to be made to test primary refrigerant pressure relief
on board ship. Relief valves are to be removed, overhauled and recalibrated
every five years or in accordance with the manufacturer's recommendations,
whichever is sooner.
20.2.11 Sea
connections to refrigerant condenser cooling water pumps are to be
opened up on the occasion of the hull and/or main machinery Special
Survey.
20.2.12 The
electric motors driving refrigerant compressors, pumps and fans, together
with their controlgear and cables, are to have their insulation resistance
tested and this is to be not less than 1 MΩ between individual
conductors and between those conductors and earth. The installation
may be subdivided to any desired extent by opening switches, removing
fuses or disconnecting appliances for the purpose of this test.
20.2.13 All
automatic controls, alarms and safety systems are to be tested and
correct operation confirmed.
20.2.14 Sufficient
air ducting and insulation lining is to be stripped from the cargo
spaces or chamber's overhead and vertical surfaces to allow the condition
of the insulation, insulation linings, grounds, supports, hangers
and fixtures which support the insulation, grids, meat rails, etc.
to be ascertained. Care is to be taken that on replacement, the ducts
and linings are sealed against air blowing into the insulation, or
against moisture ingress from refrigerated cell or space atmosphere.
20.2.15 Sufficient
tank top insulation is to be stripped to allow the condition of the
grounds and inner insulation lining to be ascertained.
20.2.16 Due
consideration is to be given to the type of insulation used in the
cargo spaces and chambers when determining the amount of insulation
lining to be removed. Where organic foam insulants have been used,
including panel systems or foamed in situ, or other insulants
in slab form, the removal of panels or linings is to be at the Surveyor's
discretion.
20.2.17 Under
normal circumstances, the condition of the cargo space and chamber
insulation, grounds, etc. can be ascertained when the Special Survey
of the ship's steel structure is being held.
20.2.18 Arrangements
made for defrosting air coolers, and for draining condensate from
trays below coolers, are to be examined to ascertain that they are
in working order. Trace heating elements around drain pipes should
be specially examined.
20.2.19 Any
air refreshing arrangements are to be examined.
20.3 Subsequent Special Survey
20.3.1 A
subsequent Special Survey is to be held approximately five years from
the date of the previous Special Survey. Where a Continuous Survey
procedure has been agreed, the interval between consecutive examinations
of each item should not exceed five years.
20.3.3 `Shell-and-tube'
condensers and evaporators (secondary refrigerant coolers) in which
the primary refrigerant is in the shell, are to have the shell pneumatically
tested with the refrigerant, or air, or a mixture of inert gas and
refrigerant (with the end covers removed) at pressures as stated in Pt 6, Ch 3, 2.5 Design pressures 2.5.5.
20.3.4 Shell-and-tube evaporators (secondary refrigerant coolers) in which the
secondary refrigerant is in the shell are to have the shell hydraulically tested (with
the end covers removed) to 1,5 times the design pressure, but in no case less than 0,29
MPa. After refitting the end covers, the primary refrigerant side is to be pneumatically
tested as stated in Pt 1, Ch 3, 20.3 Subsequent Special Survey 20.3.3, and an examination made as far as practicable for
gas leakage in the shell with the secondary refrigerant connection removed.
20.3.5 Heat
exchangers used for cooling refrigerant liquid by the suction return
gas to a compressor are not subject to internal corrosion, and would
normally require to be specially examined internally only if leakage
is suspected between high and low pressure sides. This type of heat
exchanger, together with others using brine or water, are to be examined
and tested at the discretion of the Surveyor according to the design
of such equipment.
20.4 Loading Port Surveys
20.4.2 The
refrigerating installation is to be examined under working conditions,
and the temperatures in the cargo chambers are to be noted.
20.4.3 A
General Examination of the generating plant supplying electric power
to the refrigerated cargo installation is to be carried out to confirm
that it complies with Pt 6, Ch 3, 6.1 General.
20.4.4 The
refrigerated cargo spaces and chambers are to be examined in an empty
state to ascertain that they are clean and free from odour which may
adversely affect the cargo to be loaded, that the air cooler coils
and cooling grids and their connections are free from leakage, that
cargo battens, where fixed to the vertical surfaces, are in good order,
that cargo gratings or dunnage battens (see
Pt 6, Ch 3 Refrigerated Cargo Installations) are available as necessary
for the floors or decks, and that no damage has been sustained to
the insulation or its lining prior to the loading of the refrigerated
cargo. Any indications of defective insulation not considered to warrant
immediate attention are to be noted and specially reported.
20.4.5 All
scuppers and bilge suctions draining insulated spaces are to be examined
to ensure that they are in good working order, and that any liquid
seals are primed.
20.4.6 If
the ship loads at more than one port, one survey only at the first
loading port will be required, provided that it includes the examination
of all spaces or chambers which are to be used for refrigerated cargo
during the voyage, and that general cargo is not subsequently carried
in any of the spaces or chambers prior to loading the refrigerated
cargo.
20.4.7 In
the case of ships engaged on voyages of less than two months' duration,
a Loading Port Certificate will be considered as valid for two months,
provided that the cargoes carried are of such a nature as not to damage
the insulation or appliances in the insulated chambers, nor to affect,
by taint or mould, the refrigerated cargoes loaded during that period.
For longer voyages, the certificate is valid for only one cargo from
the loading port(s) to the discharge port(s).
20.4.8 If
there is no LR Surveyor available at the loading port(s), or if none
is obtainable from a port within a reasonable distance, the Committee
will accept the report of a survey held at the loading port by two
competent engineers of the ship.
20.5 Refrigerating plant on ships not classed with LR
20.5.1 In
the case of refrigerating installations being constructed under Special
Survey on ships not intended to be classed with LR, the installation
is to comply with the applicable requirements of Pt 6, Ch 3 Refrigerated Cargo Installations.
20.5.2 The
generator engines and electrical equipment, which supply power to
the refrigerating installations are to be constructed in accordance
with the requirements of the Classification Society concerned and
the installation is also to comply with the requirements of Pt 6, Ch 3, 6.1 General 6.1.2. Such plant is
to be examined generally and under working conditions by the Surveyors.
|