5.1.1 The bilge
drainage arrangements are to comply with Pt 15, Ch 2, 4 Bilge pumping and drainage systems, except that the arrangements are to be such that any water
which may enter this compartment can be pumped out through at least
two bilge suctions under all possible conditions of list and trim
in the maximum assumed damage condition.