Isle Of Man - Specific requirements by the British Administration for the Isle of Man flag

Isle of Man - 2026-11-05

Flag instructions relating to statutory surveys

Flag procedural requirements

Standing requirements
Standing requirementsAction by
1- Reporting on entry into classMOC
2- Reporting on requests for exemptions or interpretationsMOC
3- Reporting on cases of detainable deficiencies, as per IACS Recommendation 98 (Duties of surveyors under statutory conventions and codes) and Addendum A to Appendix 2 (attached file)MOC
4- Pre-authorisation prior to extending statutory certificatesMOC
5- Pre-authorisation prior to issuing short term certificatesMOC
6- Reporting on detentionsDO-FM
7- Submission of copies of statutory certificatesVeriSTAR
8- Reporting on class suspension or class modificationMOC
9- Reporting on class withdrawalDO-FM
10- Notification in case of SMS failure (IACS PR 17)MO
11- Single contact point

MCC London

General policy

Agreement

An Agreement between the Department for Enterprise and Recognised Organisation (RO) SA commencing on the 1st of August 2021 has been signed. The Agreement and its Appendices 1 to 4 show the details of authorisation granted (see Agreement governing the delegation of statutory certification services to Annex 4 to the Agreement).

Information regarding the general policy are in the agreement and in the “Technical Instructions” displayed in Technical Instructions to ROs and their Surveyors.

Reference should be made to the below sections for details on:

  • Approval of manuals: SOPEP / SMPEP / P&A, Stability, Cargo Securing manuals (Section 1, §5)

  • New construction, major modifications or conversions (Section 3, §1&2)

Electronic certificates

(Administration email dated 09/03/2018)

The Administration agrees Recognised Organisation (RO) issuing electronic statutory certificates in accordance with IMO’s FAL.5/Circ.39/Rev.2.

Refer also to MSN 065 “Digitally Signed Electronic Certificate”.

Single contact point

All correspondence between Isle of Man and Recognised Organisation (RO) shall be channelled through a single contact point.

To date, the contact point is Marine Customer Centre London (GBR_CLO).

Registration

Refer to Section 2 of the “Technical Instructions” displayed in Technical Instructions to ROs and their Surveyors, for details on:

  1. Registration – Isle of Man surveyor in attendance

  2. Registration – RO’s surveyor not in attendance

    1. Marking of official / IMO number - carving and marking

    2. Builders certificate and bill of sale

    3. International Tonnage Certificate

    4. Certificate of survey

  3. Alternative Equivalent arrangements

    Refer also to Deviations and equivalent solutions.

Issuance of statutory certificates

  1. Statutory certificates are issued by Recognised Organisation (RO) and no longer by the British Committee of the Society.

  2. Statutory certificates - Endorsement

    The Isle of Man is one of the Red Ensign registries of the United Kingdom.

    As such, the statutory certificates issued since 1 January 2010 to ships registered in the Isle of Man are endorsed with the following mention:

    “This Certificate is issued on behalf of the Isle of Man under the responsibility of the United Kingdom as Flag state under the Convention.”

    The mention is automatically printed onto the certificates by ASMS Certificates Editor. The surveyor nevertheless verifies that the mention is duly endorsed when issuing a certificate.

  3. Recognised Organisation (RO) issues certificates / Statement of Compliance as per table given in “Guideline to Recognised Organisation (RO) Surveyors” attached in Technical Instructions to ROs and their Surveyors.

    One copy of each full-term certificate shall be forwarded to the Administration.

    The Administration should be advised in circumstances where it is not considered appropriate to issue either interim or full-term certificates.

    Where Recognised Organisation (RO) have been authorised to issue full term certificates, IOM Ship Registry issued certificates should be replaced with Recognised Organisation (RO) issued ones at renewal surveys or before if they need significantly updating.

  4. The Administration issues full-term:

    • Passenger Ship Safety Certificate

    • MODU Code Safety certificate

    • Certificate of Compliance for Larger Charter Yachts

    Where applicable, corresponding interim certificates may be issued by Recognised Organisation (RO). These will generally be restricted to cases where specific appointments have been issued to the Society for renewal surveys to be conducted.

    Refer to the relevant table of authorization given in “Guideline to Recognised Organisation (RO) Surveyors” attached in Technical Instructions to ROs and their Surveyors.

  5. Recognised Organisation (RO) issues provisional and final International Tonnage Certificates. One copy of each certificate issued shall be forwarded to the Administration.

    Where a Recognised Organisation (RO) ship is intending to be transferred to the Isle of Man Register, the society may issue the Certificate of Survey for the ship measured in accordance with the tonnage regulations. The information required for inclusion in this document is contained in Form S 031 of April 2000 (given in Annex 1, Appendix 5).

    (Paragraph 3.2 of Appendix 2 of the Agreement, refer to Annex 2 to the Agreement)

    Whenever an international tonnage certificate is issued for a ship that will be or has been registered in the Isle of Man, or whenever an existing international tonnage certificate issued by a foreign authority or another Recognised Organisation is accepted temporarily in connection with registration in the Isle of Man, Recognised Organisation (RO) shall immediately forward one copy of the same to the Isle of Man.

    Tonnage certificates may also be issued for fishing vessels and yachts in accordance with the appropriate Isle of Man regulations.

  6. Withdrawal of statutory certification

    (Paragraph 5.4 of the Agreement, refer to Agreement governing the delegation of statutory certification services)

    (Paragraph 4.6 of Appendix 2 of the Agreement, refer to Annex 2 to the Agreement)

    The Administration reserves the right to suspend, cancel or revoke any certificate, document or approval issued by Recognised Organisation (RO) pursuant to the agreement. In case of a cancellation or revocation, the Administration will inform Recognised Organisation (RO) in good time, stating the reasons for this action.

    Statutory certification issued by Recognised Organisation (RO) under the authority of the Administration shall not be withdrawn, by Recognised Organisation (RO), without informing the Administration in good time stating the reasons for this action.

    In the circumstances when a ship is found to be in operation with deficiencies or discrepancies such that the condition of the ship or its equipment does not correspond substantially with the particulars of its certificates or the requirements of applicable International Conventions and/or national requirements, if corrective action is not taken to the satisfaction of Recognised Organisation (RO), then Recognised Organisation (RO) shall immediately consult the Administration and, if given approval, withdraw the relevant certificate(s).

    The Administration will provide written authorisation to withdraw the certificate(s). The right to withdraw certificates may not always exist and where cancellation is the only possible action the Administration retains responsibility for such cancellations.

  7. Refer to Section 1 of the “Technical Instructions” displayed in Technical Instructions to ROs and their Surveyors, for details on:

    • Harmonised surveys and certification (§3)

    • Exemptions, waivers etc. (§4)

    • Note to be added to all Convention certificates (§6)

    • Certification updating (§7)

Survey

  1. For the survey of passenger ships, the Administration grants individual appointments to Recognised Organisation (RO) surveyors.

  2. A copy of the survey summary print-out shall to be sent to the Administration at periods not exceeding 6 months. Other arrangements for provision of this information will also be used.

  3. Annual / periodical / intermediate survey reports shall be sent to the administration only where significant deficiencies are observed.

  4. Flag notification in case of deficiencies - IACS PR 17

    Whatever the survey, where the surveyor has concerns regarding the condition of the ship or the operation of the vessel that requires the issue of a report of deficiencies relating to possible safety management system failures (IACS Procedural Requirement No 17), then the Isle of Man Ship Registry must be informed within 3 working days of the issuance of the report.

    If the attending surveyor has concern that these are potential significant / serious failures of the Safety Management System or significant / serious non-conformity with the ISM Code, the Ship Registry is to be informed within 24 hours of issuance of the report.

    This should be done using the out of hours contact if necessary and by email to marine.survey@gov.im, after validation of PR 17 report by the MO, with copy to c-r_stat@bureauveritas.com, [e-mail redacted] and gbr_clo@bureauveritas.com.

Reporting

(Paragraph 3.4 of Appendix 2 of the Agreement, refer to Annex 2 to the Agreement)

Recognised Organisation (RO) should inform the Administration in cases where there are special circumstances appropriate for:

  • the issue of a certificate which has a validity exceeding five (5) years from the date of expiry of the previous full term certificate in accordance with applicable instruments,

  • the extension of certificates in accordance with Survey and Certification Regulations, or

  • where the issue of an exemption certificate by the Administration.

Conditions of class relating to statutory items

(Letter from MCA MS16/62/2 dated 4th November 2011 and e-mail dated 10th February 2012)

The use of Conditions of Class (CoC) to manage the rectification of minor deficiencies relating to classification items, e.g. hull structure, machinery and electrical / control systems, is acceptable to the Isle of Man Ship Registry. It is not necessary to issue short term Safety Construction and/or Load Line certificates in such cases.

However, the use of a CoC to manage the rectification of deficiencies (or multiple deficiencies) relating to non-classification items, e.g. safety equipment, safety radio, etc., which in the opinion of the RO surveyor may affect the validity of the relevant certificate is not acceptable to the Isle of Man Ship Registry as the only course of action to take. Such deficiencies (or multiple deficiencies) are to be reported to the Isle of Man Ship Registry which will advise how the deficiencies are to be dealt with, e.g. by the issue of a short term certificate.

Interpretations

(Paragraph 5.2 of the Agreement, refer to Agreement governing the delegation of statutory certification services)

While interpretations of the applicable instruments, as well as the determination of equivalents or the acceptance of substitutes to the requirements of the applicable instruments are the prerogative of the Administration, Recognised Organisation (RO) will co-operate in their establishment as necessary.

Recognised Organisation (RO) applies the IMO interpretations and Circulars, as well as the available IACS Unified Interpretations as stated below unless they conflict with written instructions/guidance from the Administration.

For acceptance of IACS Unified Interpretations (“UIs”) the following conditions apply:

  • IACS UIs that have been adopted by the IMO shall be applied with respect to statutory certification and services provided by Recognised Organisation (RO) on behalf of the Administration; and

  • IACS UIs that have been submitted to, but which are still under review of, the IMO or have yet to be submitted, shall be subject to review by the Administration on a case by case basis.

Closure of simple Conditions of Class/Statutory Recommendation

(RO BCC meeting - 20 November 2019)

The Administration has no objection to Recognised Organisation (RO) undertaking closure of simple Conditions of Class/Statutory Recommendation, or outstanding survey items for which no more than documentary evidence is required, by remote inspection/verification provided Recognised Organisation (RO) follows procedure in the planned inspection programme Section 13.

It should be noted that Recognised Organisation (RO) remote acceptance of evidence provided by a ship’s manager or owner does not obviate its accountability with respect to verification of Convention compliance.

Ships changing flag to Isle of Man

Stability information

Ships shall have their stability information approved by one of the Isle of Man’s RO. The attending surveyor shall verify this and confirm that approval information remains compliant with applicable international regulations. Stability booklets shall be endorsed stating the content is accepted by the vessel’s RO on behalf of the Isle of Man.If stability information is approved by an organisation other than one recognised by the Ship Registry, the attending RO’s surveyor shall contact the Ship Registry for instructions regarding re-approval.

For further information, refer to Section 4 of the “Technical Instructions” in Technical Instructions to ROs and their Surveyors.

Transfer of Class

(Paragraph 2.4 of Appendix 2 of the Agreement, refer to Annex 2 to the Agreement)

In cases of transfer of the certification of the ship from one RO to another, the gaining organisation shall, within one month from the issuance of the certificates. advise the Administration and the losing organisation of the date of issue of the certificates and confirm the date, place and action taken to satisfy each overdue survey, overdue recommendation and overdue condition of class.

(Paragraph 7.5 of the Agreement, refer to Agreement governing the delegation of statutory certification services)

In the event that a ship registered in Isle of Man transfers class from another Recognised Organisation to Recognised Organisation (RO), Recognised Organisation (RO) shall ensure that it has obtained all, to its knowledge, relevant information on the survey status of the ship, including structural and operational limitations and any outstanding conditions given by the previous Recognised Organisation. The structural and operational limitations of the ship shall be checked and agreed to by Recognised Organisation (RO).If the ship is not classed on transfer, the requirements of IACS procedural requirements for transfer of Class shall apply.Outstanding conditions shall be reassessed and if considered acceptable by Recognised Organisation (RO) followed up within the time limits given by the losing Recognised Organisation.The above procedures shall be carried through before assignment of class to a ship, or before an unclassed ship is registered by Recognised Organisation (RO). This information shall also be copied to the Administration on request.

For Isle of Man registered vessels transferring class from Recognised Organisation (RO), but remaining registered in the Isle of Man, Recognised Organisation (RO) will provide the same information to the gaining Recognised Organisation upon request.

Recognised Organisation (RO) shall not issue statutory certificates to a ship de-classed or changing class for safety reasons before consulting with the Administration to determine whether a full inspection is required.

Remote Inspections Techniques (RIT) and Remote Surveys (RS)

(Refer to Technical Instructions to ROs and their Surveyors)

The Administration position on RIT and RS is as follows:

  • Annual/Intermediate/Renewal Surveys will not be considered;

  • Remote Surveys for the reporting of defects whilst the vessel is at sea will be considered on a case-by-case basis;

  • Remote Surveys for the reporting of defects whilst the vessel is in port will be considered on a case-by-case basis, provided that there are extenuating circumstances preventing physical attendance;

  • Remote surveys for the closure of findings will be considered, on a case-by-case basis, provided there are extenuating circumstances that prevent physical attendance;

  • Remote surveys where a ship changes owner or technical manager will be considered on a case-by-case basis subject to the specific circumstances.

Prior to commencement of any RIT or RS, a case-by-case application alongside a documented procedure to be followed must be submitted by Recognised Organisation (RO) to the Administration for agreement and possible instructions. In all cases, the Administration may require follow-up physical attendance.

Technical requirements

Industry circulars

Industry circulars (Notices to surveyors, shipowners, managers and classifications societies) are regularly released by the Administration.

They are available on the IOM website http://www.iomshipregistry.com/

Deviations and equivalent solutions

(Paragraph 5.3 of the Agreement, refer to Agreement governing the delegation of statutory certification services)

Exemptions and deviations from, and equivalents to, the requirements of the applicable instruments are the prerogative of the Administration and only the Administration may approve them prior to issuance. Recognised Organisation (RO) will co-operate in their establishment as necessary.

In instances where, temporarily, the requirements of an applicable instrument cannot be met under particular circumstances, Recognised Organisation (RO) will specify such measures or supplementary equipment as may be available to permit the vessel to proceed to a suitable port where permanent repairs or rectifications can be effected or replacement equipment fitted, and shall immediately inform the Administration in writing of any such action taken.

Prior to registration, Recognised Organisation (RO) shall advise the Ship Registry of any applicable alternative or equivalent arrangements (potentially accepted by another flag Administration). This information is to be accompanied by reference to applicable IMO Circular and any supporting documentation (risk assessments, safety cases, plans etc.)

For further information, refer to Section 2, §3 of the “Technical Instructions” in Technical Instructions to ROs and their Surveyors.

LL 66

Load Line requirements

(MSN 073)

Refer to Section 3 of MSN 073 for Load Lines requirements for non-Convention ships.

Refer to Section 5 of MSN 073 for IOM Ship Registry’s requirements

Load Line Certificate

  1. Extension of a periodical survey shall be subject to a prior approval of the Administration.

  2. A copy of the approved stability information should be on board.

    Where final approval of stability is carried out by the Administration, the formal approval endorsement stamp will be found on the appropriate front page of this document and will be similar to the examples shown below.

    graph1
    Endorsement found on ships registered under an EU flag prior to transfer to the Isle of Man.

    or

    graph2
    General approval endorsement stamp found in addition to an approval endorsement by Recognised Organisation (RO) (as an accepted Certifying Authority).

    or

    graph3
    Endorsement for offshore supply / anchor handling / standby safety and similar ships.

    or

    graph4
    Endorsement found on ships registered in the Isle of Man prior to November 1986.

    or

    graph5
    Endorsement stamp in current use for all other ships.
  3. Most version of approved stability documents will normally be found to be secured by a wire and embossed lead seal arrangement or similar arrangement.

  4. Until the stability information has received final approval, only Interim Loadline Certificates valid for a maximum period of 5 months will be issued. In this case, the on-board stability information should be endorsed as “Provisionally Accepted” by a surveyor of the Administration or by Recognised Organisation (RO) as certifying Authority acting on behalf of the Administration.

  5. The society is authorised to approve stability files on certain ships as specified in the applicable loadline rules and in the accompanying memorandum dated 3rd December 1998.

    For all other ships, special appointments will be made by the Administration to the stability division of Recognised Organisation (RO) (statutory services) before the stability information document can be approved.

    All other pertinent instructions will be given at the time of appointment.

Multiple load lines

Reference should be made to Section 6 of the “Technical Instructions” displayed in Technical Instructions to ROs and their Surveyors.

1. No formal authorisation is required for the issue of multiple load line certificates. The requirements which should be applied to IoM registered vessels are as follows:

2. The ship fully complies with all the applicable safety and pollution convention requirements appropriate for a ship of the maximum deadweight for which the minimum freeboard could be assigned;

3. Only one set of Load Lines is displayed at one time -all others should be permanently marked but effectively painted over.

4. If there are International Load Line Certificates in force concurrently relating to each set of Load Line marks, the Master is to ensure that the certificate in use corresponds to the Load Line marks displayed.

5. The Master should make an entry in the vessel's Official Log Book on each occasion that the Load Line marks in use are changed. The attendance of a Recognised Organisation (RO)’s surveyor on such occasions is not required;

6. All Load Line marks should be checked annually by the attending Recognised Organisation (RO)’s surveyor conducting the Load Line Annual survey. The Ship Registry requires that all other statutory certificates shall show only the maximum deadweight of the ship. It is NOT intended to issue a full set of statutory certificates corresponding to each of the deadweights shown on the multiple Load Line Certificates

SOLAS 74

General

Refer to MSN 059, MSN 056, MSN 074 and also to Technical Instructions to ROs and their Surveyors for technical instructions.

Cargo Ship Safety Construction Certificate

General

  1. Extensions to survey periods in respect of statutory survey items which have survey cycles of less that 5 years (e.g. oil-fired and exhaust-gas fired smoke-tube and water-tube boilers, dry-docking of ships, etc.) are subject to a prior approval by the Administration.

  2. Any proposed exemption or equivalent arrangement to the requirements of the relevant Safety Construction regulations shall be forwarded to the Administration for consideration.

  3. Intervals between bottom inspections (Reg 10(a)(v)): Reference should be made to Section 4 of “Technical Instructions” displayed in Technical Instructions to ROs and their Surveyors.

    The policy of the Ship Registry with regard to the intervals between ship’s bottom inspections is as follows:

    1. Unless applicable statutory requirements forbid, an in-water survey may be completed in lieu of dry-docking subject to the satisfaction of the RO without consultation with the Ship Registry.

    2. Ships’ bottom inspections postponement shall only be agreed in consultation with the Ship Registry.

Application of IACS UI SC178 on unified interpretation of chapter 12 of FSS code

The Administration accepts the IACS UI SC 178 rev.1, the application date of which is for ships contracted for construction on or after 1st January 2012, and construction commenced before 1st January 2013, for a period of one year until 1st January 2013 and, thereafter, the date of application will be for ships constructed on or after 1st January 2013.

Initial testing of watertight bulkheads (SOLAS II-1/11)

The Administration accepts the application of IACS UR S14 Rev 7 as an equivalent provision for initial testing of watertight bulkheads under SOLAS Chapter II-1/Reg.11, subject to the conditions stipulated in annex of the attached file “SOLAS-UK Acceptance UR S14_XQ164387”.

Devices to prevent the passage of flame in cargo tanks - UK / REG policy on MSC.1/Circ.1324

Refer to the attached file “MCA policy on MSC-Circ-1324” and specifically its provisions in chapter 5 (“Survey requirements”).

Delay in delivery of ships due to unforeseen circumstances

(Section 4 of “Technical Instructions” displayed in Technical Instructions to ROs and their Surveyors) (SOLAS II-1)

The Ship Registry will consider ships under the provisions of MSC.1/Circ.1247, Unified interpretation of ‘Unforeseen delay in delivery of ships’, on a case-by-case basis.

Loss of anchor and validity of Safety Construction Certificate

In case of loss of a single anchor, the Administration is to be advised, as the decision that this can be handled through the issue of a class recommendation or a memoranda (rather than require the issue of a short term Safety Construction Certificate) remains with the Flag Administration.

Steering gear

(Action 8 of the RO BCC dated 31/10/2014)

The Administration is content for the amendments to SOLAS Regulation II-1/29 to be applied on a voluntary basis until they enter into force on 1 January 2016.

Collision bulkhead

Cargo ships may, in lieu of complying with the requirements of Regulation II-1/12.5.1, comply with the following:

Except as provided in paragraph 5.2, the collision bulkhead may be pierced below the bulkhead deck in passenger ships and freeboard deck in cargo ships by not more than one pipe for dealing with fluid in the forepeak tank, provided that the pipe is fitted with a screw-down valve capable of being operated from above the bulkhead deck in passenger ships and freeboard deck in cargo ships, the valve being located inside the forepeak at the collision bulkhead. The Administration may, however, authorize the fitting of this valve on the after side of the collision bulkhead provided that the valve is readily accessible under all service conditions and the space in which it is located is not a cargo space. Alternatively, for cargo ships, the pipe may be fitted with a butterfly valve suitably supported by a seat or flanges and capable of being operated from above the freeboard deck. All valves shall be of steel, bronze or other approved ductile material. Valves of ordinary cast iron or similar material are not acceptable.

For further information, refer to the letter from MCA to IMO, referenced MS 067/011/0006 and dated 23 February 2018, in the attached file “EquivalenceForButterflyValves_2018”.

Fire protection, fire detection and fire extinction (SOLAS II-2)

For further information, refer to MSN 058 in attached file which gives interpretations and type approval requirements for fire protection systems and equipment.

Refer also to the Section 4 of “Technical Instructions” displayed in Technical Instructions to ROs and their Surveyors.

Code of Safe Practice for Cargo Stowage and Securing

MSC.1/Circ.1352(Rev 1), 1353, 1354, 1355 are mandatory on Isle of Man registered vessels.

Crew accommodation

Where escape from a sleeping room is through a day room, a secondary means of emergency escape shall be provided from sleeping room.

Ideally a kick-out panel or via window and knotted rope, etc. instantaneously sounding smoke alarms, in day rooms, may be accepted in lieu.

Lifting Appliances

Refer to Technical Instructions displayed in Technical Instructions to ROs and their Surveyors and Technical Advisory Notice 009-23.

REG interpretation of amendments to SOLAS II-2 (MSC.1/Circ.1694)

(UK MCA email dated 26/11/2025)

With regards to point 5. of MSC.1/Circ.1694 – Unified interpretations of SOLAS Chapter II-2 and the HSC Codes (1994 and 2000), the UK/REG position relating to, which standards are considered “recognized” by the Administration is as follows:

  • Noting that all Aqueous Film Forming Foam (AFFF) should be PFOS free as per the SOLAS requirements. Also noting that PFOS has been banned by the UK and EU for over ten years (including for marine use).

  • Noting that the guidance requires a recognised standard and that there is no UK/REG standard for PFOS testing currently, the UK/REG is open to approval based on other acceptable standards.

  • The UK/REG understand that the NPR-CEN/TS 15968 standard has now been withdrawn, however as that standard was withdrawn as it does not work for the testing of other banned PFAS which are banned in the UK and the EU but not in the maritime sector and that no alternative has been published, the UK/REG believe it is still appropriate to use NPR-CEN/TS 15968.

  • The UK/REG will also accept a modified version of ISO 25101 that has been adapted for use on foams instead of its intended use in water sampling.

  • The UK/REG will be willing to consider other recognised tests methods (for example the US EPA Method 8327) but for now the aforementioned are the preferred tests.

Manoeuvring tests

(34th RO BCC meeting - 11 June 2025)

The MSC Resolution 137(76) - Standards for Ship Manoeuvrability are considered as guidelines and should be used to evaluate the manoeuvring performance of ships of all rudder and propulsion types, of 100m in length and over, and chemical tankers and gas carriers regardless of the length.

The instruction in relation to RO Surveyor attendance during manoeuvring tests would primarily apply during newbuild sea trials; but should also be considered during sea trials following alterations or modifications, which in the opinion of the RO, may influence the ship's manoeuvrability characteristics.

Inspections of means of access for cargo spaces

(REG-UI 010)

The Administration will not extend the requirement contained within MSC.1/Circ.1572/Rev.2, section 1.4, “Inspection”, in respect of annual inspections of the means of access provided within cargo spaces on oil and chemical tankers subject to the following conditions:

  1. Means of access for cargo spaces should be inspected whenever the space is accessed and inspection is practicable, and in all cases prior to the means of access used;

  2. Any such inspections shall be subject to adherence with the requirements contained within MSC.1/Circ.1572/Rev.2, section 1.4, “Procedures”.

Notwithstanding the above, the inspection of means of access to cargo spaces shall be inspected during the periodical statutory surveys pursuant to SOLAS Chapter I, Regulation 10.

Cargo Ship Safety Equipment Certificate

General

No extension of certificate validity may be granted without referring it to the Administration.

Where circumstances do not permit the renewal survey to be completed by its due date, the surveyor shall contact the Administration for further instructions.

Statutory equipment requiring type approval

(Section 3, §3 of “Technical Instructions” displayed in Technical Instructions to ROs and their Surveyors)

All equipment requiring type approval must be accompanied by a type approval certificate issued by:

  • a Recognised Organisation (RO) listed in MSN 20; or

  • the Isle of Man (IOM) Ship Registry; or

  • a Recognised Organisation (ordinarily this shall be a Recognised Organisation listed in MSN 020) on behalf of a national Administration.

Where a ship is transferring class/flag and has onboard existing equipment approved on behalf of National Administration by a Recognised Organisation other than those listed in MSN 020, the RO is requested to contact marine.survey@gov.im for advice on how to proceed.

In addition to the above, equipment certified under the EU Marine Equipment Directive (MED) by an RO or a notified body or the UK conformity assessment procedures by a RO or a Conformity Assessment centre is acceptable for use on Isle of Man registered vessels. However, it is not mandatory for equipment to be certified under either of these schemes.

If the equipment has been issued with a type approval certificate by another organisation it may only be used or fitted with the consent of the IOM Ship Registry.

Except when it is a convention requirement, individual test certificates are not required in addition to the type approval certificate.

Annual surveys

  1. Should any deficiency be found which cannot be dealt with at the time of the survey and which, in the opinion of the attending Recognised Organisation (RO) surveyor, would affect the validity of the certificate, the Administration shall be contacted for advice on an urgent basis.

    All relevant information should be made by fax or telephone to enable the Administration to make an informed response to the Recognised Organisation (RO) surveyor on the course of action to be taken.

  2. If the requested survey is found to be outside the plus or minus 3-month envelope from the due date of the survey, the Administration shall be contacted for advice.

  3. Any alterations or amendments to the safety equipment systems or equipment should be verified for correct operation and that the correct type-approval documentation for new equipment should be on board.

    The alterations should be noted and the Safety Equipment Certificate and Record of Safety Equipment (Isle of Man Form C-8) amended and endorsed appropriately. Details should be sent to the Administration at the completion of the survey.

  4. The same process applies to intermediate surveys of tankers over 10 years of age.

  5. Maintenance and testing of lifeboat and rescue boat launching appliances and on load release gears:

    Annual examination and testing of survival craft launching appliances and on-load release gear shall be carried out by “Authorized Service Provider”. The annual examination/testing must be conducted within the survey window of the relevant Cargo Ship Safety Equipment or Passenger Ship Safety Certificate (as applicable); it is not necessary to conduct this at 12 month intervals.

    For further information, refer to MSN 062, Section 2.

Renewal surveys

Where issuance of a short-term conditional certificate has been found necessary, the relevant details should be faxed to the Administration.

Exemptions, equivalent arrangements and waivers

Any proposed exemption or equivalent arrangement to the requirements of the relevant regulations applying to safety equipment shall be forwarded to the Administration for consideration.

A list of Isle of Man requirements, listed in Isle of Man Regulations, and that the Ship Registry considers as additional to that of the SOLAS convention standard is attached in the file “Additional equipment required in IOM regulations”. Where the SOLAS convention standard is met, as indicated, then the Isle of Man Ship Registry will issue an exemption against the need to fit the additional equipment required by the applicable Isle of Man regulations stated.

Safety of Navigation

(MSN 063)

This MSN is to advise of the Isle of Man’s SOLAS Chapter V Regulations and how SOLAS Chapter V has been applied to IOM registered ships. This MSN also issues guidance and where necessary interpretations on the SOLAS Chapter V requirements.

For further information, refer to attached file “msn-063.pdf”.

Carriage of ECDIS

(MSN 026)

The Isle of Man accepts the following configurations for nautical charts (as defined in SOLAS Chapter V Regulation 19) on board Isle of Man vessels:

  • 1 x paper chart folio.

  • 2 x ECDIS.

  • 1 x ECDIS plus 1 x paper chart folio.

Refer also to “Technical Instructions” displayed in Technical Instructions to ROs and their Surveyors.

BNWAS

BNWAS are to be fitted on board vessels in accordance with the timetable given in SOLAS V/19.2.2.3.

The BNWAS is to be type approved by a Recognised Organisation.

Paragraph 5.4.9 of IMO Resolution A.861(20) requires all mandatory alarms on the bridge to interface with the VDR. Paragraph 4.1.3.3 of Resolution MSC.128(75) allows a device that registers physical activity to act as a reset function. The Administration therefore allows the use of PIR detectors. The carriage of BNWAS applies to all passenger ships and there is no relaxing the requirement for those on short international voyages. The carriage of BNWAS does not apply to vessels certificated and surveyed in compliance with the HSC Code.

Many vessels had BNWAS fitted before the introduction of Resolution MSC.128(75); SOLAS V/19.2.3.4 allows administrations to accept installations fitted prior to the implementation date.A table of what the Isle of Man Ship Registry deems acceptable regarding BNWAS installed prior to 1 July 2011 can be found in page 2 of “MSN061 Bridge Navigational Watch alarm System”, in the attached file “msn-061-bnwas”.

Refer also to “Technical Instructions” displayed in Technical Instructions to ROs and their Surveyors.

VDR

Within MSC.333(90) different standards are permitted, depending on if the VDR has been installed before 1 July 2014 or on/after 01 July 2014.

The term installed shall be taken as meaning: "set in position, connected to relevant peripheral equipment, tested and ready for use and evidence of proper operation is verifiable by the Flag/RO or its representative.”

Refer also to “Technical Instructions” displayed in Technical Instructions to ROs and their Surveyors.

Equivalent Arrangements for Magnetic Compasses carriage requirements

In accordance with SOLAS Chapter I, Regulation 5, the Administration has determined that the carriage requirements for Standard and Spare magnetic compasses under Regulations V/19.2.1.1 and V/19.2.2.1, and a gyro compass under Regulation V/19.2.5.1 may be satisfied by either of the following methods:

  1. Fitting of three gyro compasses, under the following conditions:

    1. Each gyrocompass shall:

      • be independently connected to both main and emergency sources of electrical power, and;

      • have a transitional source to be able to supply uninterrupted electrical power for up to 30 minutes (this may be satisfied by use of ship transitional power, if fitted), and;

      • be type approved in accordance with the international standards, and;

      • Display the reading at the main steering position.

    2. To avoid ‘single point of failure’ and to afford redundancy, the installation arrangements should be such that a fire, or other incidents, in one compartment should not render all of the compasses inoperative i.e. One gyrocompass shall be separated from the other units by at least one A Class fire boundary.

  2. Fitting of two gyro compasses and one GNSS compass, under the following conditions:

    1. Each gyrocompass and the GNSS compass shall:

      • be independently connected to both main and emergency sources of electrical power, and;

      • have a transitional source to be able to supply uninterrupted electrical power for up to 30 minutes (this may be satisfied by use of ship transitional power, if fitted), and;

      • Display the reading at the main steering position.

    2. The gyrocompasses shall be type approved in accordance with international standards.

    3. The GNSS compass shall be type approved in accordance with the requirements for a Transmitting Heading Device (THD) complying with SOLAS V/19.2.3.5

    4. The GNSS compass is separate to the GNSS requirement stipulated within V/19.2.1.6

    5. To avoid ‘single point of failure’ and to afford redundancy, the installation arrangements should be such that a fire, or other incidents, in one compartment should not render all of the compasses inoperative i.e. One gyrocompass or the GNSS compass shall be separated from the other units by at least one A Class fire boundary.

For further information, refer to General Equivalency Letter to IMO (XQ162569) in attached file “Equivalent Arrangements for Magnetic Compasses carriage requirements - XQ162569”

Wire rope terminations

Bulldog grips or cable grips are not to be used on primary load bearing terminations of wire ropes used for life boat falls, recovery strops or hanging off pennants. Where found these should be replaced with acceptable terminations as described in MSN 011 (see attached file “MSN 011”).

Refer also to the Section 4 of “Technical Instructions” displayed in Technical Instructions to ROs and their Surveyors.

Storage of medical oxygen cylinders

The Administration would prefer to have the required amount (40L @ 200 bar) of medical oxygen splitted in a number of smaller capacity (e.g. 4 cylinders of approximately 10 litres @ 200 bar each, or equivalent) for use inside the accommodation. One of the cylinders should be stored in the hospital ready for immediate use. The other remaining cylinders are to be securely stored in a suitable space outside the accommodation, where the cylinders will be protected from deterioration and where the risk of fire and explosion is minimised.

In the event that a 40 litres cylinder is installed it is recommended the following guidance is used.

The use of the 40 litres @ 200 bar medical oxygen cylinder can be stored in either of the following locations:

  • Outside the accommodation block, as close to the hospital as is reasonably possible, in a secure and weather protected cabinet.

  • Inside the accommodation block in the hospital beside the bed(s), provided the cylinder is securely locked in a frame connected directly to the steel structure of the ship.

(IGC 14.3.2 and IBC 14.2.8.3)

40-liter oxygen cylinders are not allowed in the accommodation spaces. Storage of a 40-liter cylinder outside the accommodation is not recommended.

It is recommended that ships carry 4 cylinders of approximately 10-liter each, one in the hospital ready for use, three outside accommodation in a suitable dry store.

Maintenance and inspection of fire protection systems and appliances

Refer to MSN 057 in the attached files which sets out the minimum level of maintenance and inspection for fire protection systems and appliances onboard Isle of Man registered ships.

Storage of Gas Cylinders

Refer to MSN 060 in the attached file “MSN060.pdf”.

Refrigeration Gas & Nitrogen Cylinders

The Administration recommends that cylinders which have exceeded their inspection dates should not remain on the vessel more than 5 years after the inspection date, after which time the cylinder should be returned to a service provider for inspection and testing.

Therefore a bottle containing refrigeration gases that has been sent to the vessel could remain on the vessel for a maximum of 15 years before being sent ashore for testing, assuming that it was brand new when sent to the vessel.

Oxy-Acetylene Equipment

Cylinders containing acetylene or oxygen normally used for welding/gas cutting should be provided with a permanent storage facility.

Any new fixed piping installation should be approved by the vessel’s Classification Society and pressure tested to their satisfaction.

Breathing apparatus

(Email from MCA dated 14/01/2015)

The Administration’s interpretation of SOLAS II-2 Regulation 5.2.2.6 as amended by MSC.338(91) in relation to the suitable number of spare cylinders is that an onboard means of recharging breathing apparatus cylinders used during drills shall be provided or a suitable number of spare cylinders shall be carried on board to replace those used.

In addition to the fully charged spare cylinders required by the regulations for each Self Contained Breathing Apparatus (SCBA), where no means for recharging such cylinders is provided on board, sufficient additional spare cylinders must be provided for training purposes. Factors to be considered by the ship-owner when deciding upon the number of training cylinders to be provided include the requirements in the Safety Management System (SMS) for the number / frequency of drills on board where SCBA cylinders may be used, and the nature of the vessels trading pattern with respect to shore based charging facilities. Cylinders intended for training purposes should be prominently marked to indicate their intended use.

The SMS must take account that at least one fully charged spare cylinder for training purposes must be provided for each SCBA set required by regulation to be on board.

If additional training SCBA sets are provided on board (each with a fully charged training cylinder) then the equivalent number of SCBA sets required on board by regulation need not be provided with a spare cylinder for training purposes.

Refer also to the “Technical Instructions” displayed in Technical Instructions to ROs and their Surveyors.

Manually operated call points (SOLAS Chapter II-2 Regulation 7.7)

(Email from MCA dated 22/06/2015)

Recognised Organisation (RO) must not apply the IACS UI SC 241 on manually operated call points but must follow the convention requirements.

(Action 14 from the BCC meeting 2015)

Fixed fire detection systems with manually operated call points shall be capable of immediate operation at all times as per the FSS code.

Refer also to the “Technical Instructions” displayed in Technical Instructions to ROs and their Surveyors.

Life-saving appliances and arrangements

(MSN 0062 dated 20 February 2020)

This Shipping Notice details the requirements for life-saving appliances and arrangements, including requirements for lifeboats, rescue boats, lifejackets and immersion suits according to the type of ship the equipment is fitted on. It is divided in 3 sections:

For further information, refer to attached file “MSN-062-Feb-20.pdf”.

Rescue boats launching appliance

The Ship Registry accepts manual slewing of the rescue boat as an equivalent arrangement to SOLAS Regulations III/16 & III/17. The equivalence is available in the IoM’s area of GISIS Ref. No. XQ52942.

Where a rescue boat launching appliance with manual slewing arrangements is provided, the following note is to be added to the Cargo Ship Safety Equipment Certificate in the free text box to the left of the signature block:

"Manual slewing of the rescue boat has been accepted by the Ship Registry in accordance with IMO SLS.14/Circ.448 as an equivalent arrangement to SOLAS Reg.III/17 regarding the stored mechanical power requirement."

Refer to the “Technical Instructionss” displayed in Technical Instructions to ROs and their Surveyors.

Lifeboat and rescue boat release and retrieval system

(MSC.1/Circ.1392)

Recognised Organisation (RO) is fully authorised to conduct the following work on behalf of the Administration: Replacement of lifeboat and rescue boat Release and Retrieval Systems (RRS), not meeting SOLAS III/1.5, in accordance with MSC.1/Circ.1392 paragraphs 18-26 including:

  • Review and approval of replacement lifeboat and rescue boat RRS (MSC.1/Circ.1392 §.20)

  • Discretion to decide if the hook fixed structural connections need to be replaced (MSC.1/Circ.1392 §.21)

  • Witnessing of the installation (MSC.1/Circ.1392 §.23)

  • Witnessing of the post installation testing (MSC.1/Circ.1392 §.25)

    For compliance with MSC.1/Circ.1392 the Ship Registry accepts simulation of the 5 knot test by means of lowering into an approximate 5 knot tidal stream or lowering into the wake of a tug. This test is designed to assess the whole launching system for the boat and shall be carried out on each davit on the ship.

  • Issuing the Statement of Acceptance as per MSC.1/Circ.1392 Appendix 4 (MSC.1/Circ.1392 §.26).

It is the Ship Registry’s interpretation of the LSA Code that this is also applicable to rescue boats and as such if a hook on a rescue boat is of a similar type to that on a lifeboat the same procedures should be followed as for lifeboats, including replacement.

MSC.1/Circ.1392 requires Administrations to send IMO reports on evaluation of hooks. These reports are to be sent by Recognised Organisation (RO) to marine.survey@gov.im.

Lifeboats designated as rescue boats, all vessels constructed after 1 July 1986 that have lifeboats designated as rescue boats must have recovery strops fitted.

Maintenance and testing of lifeboat and rescue boat davit and on load release gear: see MSN 062, section 2.

For further information, refer to “Technical Instructions” displayed in Technical Instructions to ROs and their Surveyors and MSN 062 (section 3, Reg1.5) in attached file.

Fall preventer devices

The Ship Registry strongly recommends the use of fall preventer devices in accordance with MSC.1/Circ.1392 but their use is not mandatory.

The definition of FPDs is stated in MSC.1/Circ.1466. If FPDs are fitted they must be fitted in accordance with MSC.1/Circ.1327 and employed for each existing lifeboat release and retrieval system, until the system is:

  • evaluated and found to be in compliance with MSC.1/Circ.1392; or

  • modified then evaluated and found to be in compliance with MSC.1/Circ.1392; or

  • replaced by a new lifeboat release and retrieval system

The use of FPDs must be documented in the ship’s safety management system. FPDs must be inspected before use and thoroughly inspected by a senior member of the ship’s crew every six months.

For further information, refer to the “Technical Instructions” displayed in Technical Instructions to ROs and their Surveyors and MSN 062 (section 3, Reg1.5) in attached file “MSN-062-Feb-20.pdf”.

Launch testing of lifeboats and rescue boats

(SOLAS III/17.3 and Resolution MSC.81(70)/5.4)

The Ship Registry requires the launching test at 5 knots for lifeboats on cargo ships of 20,000 GT and above and rescue boats to be carried out on every ship, not just the first in series.

For further information, refer to “Technical Instructions” displayed in Technical Instructions to ROs and their Surveyors.

Simulated launching of free-fall lifeboats

IMO resolution MSC.325(90) introduces an amendment to SOLAS Chapter III, Regulation 20 to permit the simulated launching of free-fall lifeboats during the regular tests. IMO has recommended early implementation of this amendment through circular MSC.1/Circ.1411.

The Administration confirms early implementation, with reference to the requirements on Guidelines for simulated launching of free-fall lifeboats from MSC.1/Circ.1206/Rev.1. Refer to the attached file “Guidelines for simulated launching”.

Inflatable liferafts

The Administration has accepted equivalent arrangements for the servicing of inflatable liferafts in accordance with SOLAS III/4 and III/20.8.3 by the UK and communicated by SLS.14/Circ.573 (Viking), SLS.14/Circ.264 (Viking) and SLS.14/Circ.576 (Survitec).

Refer also to the “Technical Instructions” displayed in Technical Instructions to ROs and their Surveyors.

Arrangement for remotely located survival craft

(Administration email dated 05/07/2019)

The Administration agreed the revised Unified Interpretation of SOLAS Reg III/31.1.4 detailed in MSC.1/Circ.1490/Rev.1.

Quote

1. Liferafts required by SOLAS regulation III/31.1.4 should be regarded as "remotely located survival craft" with regard to SOLAS regulation III/7.2.1.4.

2. The area where these remotely located survival craft are stowed should be provided with:

  • .1 a minimum number of two lifejackets and two immersion suits;

  • .2 adequate means of illumination complying with SOLAS regulation III/16.7, either fixed or portable, which should be capable of illuminating the liferaft stowage position, as well as the area of water into which the liferaft should be launched; portable lights, when used, should have brackets to permit their positioning on both sides of the vessel;

  • .3 an embarkation ladder or other means of embarkation enabling descent to the water in a controlled manner* as per SOLAS regulation III/11.7; and

  • .4 self-contained battery-powered lamps (i.e. luminaires) may be accepted as means of illumination for complying with SOLAS regulation III/16.7. Such lamps should be capable of being recharged from the ship's main and emergency source of electrical power, and should be stowed close to the liferaft and embarkation ladder they are intended to serve, under charge. When disconnected from the ship's power, the lamp should give a minimum duration of three hours of undiminished performance. The lamps should comply with the requirements of section 1.2.3 of the LSA Code. The lamps (i.e. luminaires) should meet the requirements of Ingress Protection rating IP 55. The batteries for the subject lamps should comply with IACS Unified Requirement (UR) E18 requirements irrespective of whether the expiry date is marked by the manufacturer or not.

3. With regard to the distance between the embarkation station and stowage location of the liferaft as required by SOLAS regulation III/31.1.4 (remotely located survival craft), the embarkation station should be so arranged that the requirements of regulation III/13.1.3 can be satisfied.

4. Exceptionally, the embarkation station and stowage position of the liferaft (remotely located survival craft) may be located on different decks provided that the liferaft can be launched from the stowage deck using the attached painter to relocate it to the embarkation ladder positioned on the other deck (traversing a stairway between different decks with the liferaft carried by crew members is not acceptable).

5. Notwithstanding paragraph 2, where the exceptional cases mentioned in paragraph 4 exist, the following provisions should be applied:

  • .1 the lifejackets and the immersion suits required by paragraph 2.1 may be stowed at the embarkation station;

  • .2 adequate means of illumination complying with paragraph 2.2 should also illuminate the liferaft stowage position, embarkation station and area of water where the liferaft is to be embarked;

  • .3 the embarkation ladder or other means of embarkation as required by paragraph 2.3 may be stowed at the embarkation station; and

  • .4 notwithstanding the requirements in paragraph 4.1.3.2 of the LSA Code, the painter should be long enough to reach the relevant embarkation station.

Unquote

“Technical Instructions” displayed in Technical Instructions to ROs and their Surveyors MSN-062 Section 3:

An embarkation ladder complying with the requirements of paragraph 6.1.6 of the LSA Code is not mandatory for remotely located survival craft. An acceptable alternative could be a Jacob’s ladder with efficient non-slip surface, which can be secured in a safe and efficient manner and is properly maintained. The use of knotted rope is not acceptable

Requirements for maintenance, thorough examination, operational testing, overhaul and repair of lifeboats and rescue boats, launching appliances and release gear (MSC 402(96))

(Technical Advisory Notice - 006-19, MSN-062 Section 2)

The Administration delegates Recognised Organisation (RO) for authorization of Authorized Service Providers (ASP).

Existing approvals will be valid after 1st January 2020 until the approval’s expiry date or until 3 years from the date of issue, whichever occurs first. Once the approval has expired, it will have to be reissued in accordance with Resolution MSC 402(96).

The Administration will accept the authorization of service providers issued by other Administrations.

Authorized Service Provider (ASP) includes manufacturers when they are acting as an ASP.

Authorized Service Provider can be accredited to work on a different manufacturer’s equipment, however they will have to demonstrate during their authorisation process that they have sufficient technical information (e.g. the manufacturer’s guidelines) in order to establish a training program for the make and type of another manufacturer’s equipment.

For further information, refer to the attached files “TAN 006-19.pdf” and “MSN-062-Feb-20.pdf”

Measurement of General Emergency Alarm and Public Address System

(RO BCC meeting - 20 November 2019)

Sound pressure measurements shall be done separately on each ship.

Fire Fighting

Firefighting outfits (Reg 10)

The Ship Registry strongly recommends that "fire-fighting suits" used in any area comply, as a minimum, with the standards specified in TAN 004-24 (or with equivalent national or international standards) as these provide the designed protection in both open and enclosed spaces and that equipment not meeting these standards be replaced as soon as possible. Existing close proximity clothing stating, "not suitable for fire entry" (or similar) may be used for protection when boundary cooling fires or for search and rescue in an enclosed space without a fire. It should not be used for search and rescue purposes or fire-fighting within an enclosed space containing a fire.

Fire main (Reg 10.2.1)

New constructions: The fire main must not have any additional permanent connections for services other than firefighting; however connections to anchor washers, windlass cooling systems and forepeak bilge eductors are permitted provided that lockable valves or removable spool pieces are fitted.

Emergency fire pump (Reg 10.2.2)

The interpretation for emergency fire pumps in cargo ships, as stated in IACS UI SC178 Rev.1 is considered to be acceptable

Fixed Foam Fire Extinguishing Systems (Reg 10.4.1)

The interpretations for fixed foam fire extinguishing systems as stated in IACS UI SC262 Rev.1 is considered to be acceptable.

Fire extinguishers

(SOLAS II-2C Regulation 10.3.2.1)

No more than 50% of the total outfit should be dry powder. In accommodation spaces, there should be some water or foam extinguishers. In machinery spaces, there should be some foam type extinguishers. Semi-portable extinguishers in machinery spaces should be either foam or CO2.

Existing ships with dry powder semi-portable extinguishers should change them when the extinguishers are renewed.

Emergency Escape Breathing Devices (EEBDs) (Reg 13)

  1. Keel laid before 01/07/2002:

    Two in ER (in working areas), two in accommodation fire station.

  2. Keel laid after 01/07/2002:

    As above plus 2 spare (to be marked spare and stored in accommodation fire station)

See MSN 058 for details - www.iomshipregistry.com

Refer also to the “Technical Instructions” displayed in Technical Instructions to ROs and their Surveyors.

EPIRB

(Section 4 of “Technical Instructions” displayed in Technical Instructions to ROs and their Surveyors)

EPIRBs must be registered with the relevant UK Authorities. Guidance on the registration process is provided in MSN 1816 (M+F) published by the UK MCA.

EPIRBs installed on or after 1 July 2022 shall conform to the performance standards stated in MSC.471(101). the Administration adopts IACS UI 295 interpretation of “installed on or after 1 July 2022”.

LRIT

(MSN 032)

Pole Star Space Applications Limited (‘Pole Star’) has been appointed as the recognised Application Service Provider and as such provides the dedicated Data Centre for the Isle of Man. Their contact details can be found in Appendix 1 to MSN 032.

Authorised Testing Application Service Providers (‘ASPs’) are authorised to conduct conformance tests and issue conformance test reports and certificates on behalf of Administrations. A current list of IOMSR authorised testing ASPs is provided in Appendix 1 to MSN 032.

Cargo Ship Safety Radio Certificate

Surveys

Only approved radio survey companies should be used (see the statutory service suppliers approval procedure).

Whilst the Administration recognises that it is not always possible to avoid using survey companies which supply or service radio equipment, it is recommended that independent surveyors be used wherever possible to avoid potential conflicts of interest.

No extension of certificate validity may be granted without referring it to the Administration.

Where circumstances do not permit the renewal survey to be completed by its due date, the surveyor shall contact the Administration for further instructions.

Renewal surveys

Should any deficiency be found which cannot be dealt with at the time of the survey and which, in the opinion of the Recognised Organisation (RO) surveyor, would affect the validity of the certificate, the Administration shall be contacted for advice on an urgent basis.

All relevant information should be made by fax or telephone to enable the Administration to make an informed response to the Recognised Organisation (RO) surveyor on the course of action to be taken.

Any alterations or amendments to the safety radio systems or equipment should be verified for correct operation and that the correct type-approval documentation for new equipment should be on board.

Exemptions and equivalent arrangements

Any proposed exemption or equivalent arrangement to the requirements of the relevant regulations applying to radio installations and equipment shall be forwarded to the Administration for consideration.

Radio companies acceptable to the Flag Administration

(MSN 020)

In addition to the Recognised Organisation (RO) agreed radio company, the Isle of Man Administration accepts the following service providers to act as an “organisations acceptable to the Department”:

  • Bevan Ltd

Passenger Ship Safety Certificate

(Section1, §11 of “Technical Instructions” displayed in Technical Instructions to ROs and their Surveyors)

All surveys of passenger ships and high-speed craft will be carried out by surveyors from the Ship Registry in conjunction with surveyors from Recognised Organisation (RO).

The Ship Registry’s lead surveyor, RO surveyor(s), the master and the operator of the vessel will have an opening meeting to discuss the delegation of survey items. This will include the procedure and schedule of surveys to be conducted in the three month window prior to the expiry date of the Passenger Ship Safety Certificate or the High-speed Craft Safety Certificate.

For Passenger Ships (not HSC), the Ship Registry will issue a document ‘Declaration of Surveys required for issue of a Passenger Ship Safety Certificate' which is to remain on board until surveys are completed.

On completion of all surveys, the Ship Registry will issue the relevant Passenger Ship Safety Certificate or High-speed Craft Safety Certificate.

Safe Return to Port

Instructions for the guidance of surveyors on the implementation of SOLAS regulations II-1/8-1, II-2/21 and II-2/22 can be found in the Red Ensign Group’s Safe return to port publication available following this link: https://www.redensigngroup.org/media/1282/safe-return-to-port_oct-2019.pdf

SOLAS codes

Certificate of Fitness for the Carriage of Liquefied Gases in Bulk

Extension of certificate validity

No extension of certificate validity may be granted.

Annual surveys
  1. Should any deficiency be found which cannot be dealt with at the time of the survey and which, in the opinion of the attending Recognised Organisation (RO) surveyor, would affect the validity of the certificate, the Administration shall be contacted for advice on an urgent basis.

    All relevant information should be made by fax or telephone to enable the Administration to make an informed response to the Recognised Organisation (RO) surveyor on the course of action to be taken.

  2. If the requested survey is found to be outside the plus or minus 3-month envelope from the due date of the survey, the Administration shall be contacted for advice.

  3. Any alterations or amendments to the cargo system or equipment should be verified for correct operation and that the correct type-approval documentation for new equipment should be on board. Details should be sent to the Administration at the completion of the survey.

  4. The Procedures and Arrangements (P&A) manual for cargo handling should carry the approval endorsement of the Administration as follows:

    graph6
  5. Particular attention should be paid to the correct completion of the cargo record books as these increasing feature in Port State Control reports. It is considered as a good practice to endorse the record book at completion of the examination.

  6. The same process applies to intermediate surveys. Ship owners and operators should be encouraged to apply for an intermediate survey in conjunction with either the 2nd annual or 3rd annual surveys.

Certificate of Fitness for the Carriage of Liquefied Chemicals in Bulk

Extension of certificate validity

No extension of certificate validity may be granted.

Annual surveys
  1. Should any deficiency be found which cannot be dealt with at the time of the survey and which, in the opinion of the attending Recognised Organisation (RO) surveyor, would affect the validity of the certificate, the Administration shall be contacted for advice on an urgent basis.

    All relevant information should be made by fax or telephone to enable the Administration to make an informed response to the Recognised Organisation (RO) surveyor on the course of action to be taken.

  2. If the requested survey is found to be outside the plus or minus 3-month envelope from the due date of the survey, the Administration shall be contacted for advice.

  3. Any alterations or amendments to the IOPP system or equipment should be verified for correct operation and that the correct type-approval documentation for new equipment should be on board. The alterations should be noted and the IOPP certificate and record of equipment amended and endorsed appropriately. Details should be sent to the Administration at the completion of the survey.

  4. The Procedures and Arrangements (P&A) manual for cargo handling should carry the approval endorsement of the Administration as follows:

    graph6
  5. Particular attention should be paid to the correct completion of the cargo record books as these increasing feature in Port State Control reports. It is considered as a good practice to endorse the record book at completion of the examination.

  6. The same process applies to intermediate surveys. Ship owners and operators should be encouraged to apply for an intermediate survey in conjunction with either the 2nd annual or 3rd annual surveys.

POLAR Code

Recognised Organisation (RO) is fully authorised for statutory surveys and verifications and issuance of a full term Statement of Compliance.

IGC Code

A0 Wheelhouse windows (IGC Code §3.2.5)

(BBC Meeting dated 28 November 2018)

The Administration supported the removal of the A0 windows as the vision through A0 glass can be distorted and it is not possible to get A0 clearview screens. They agree for the early implementation and in the process of drafting a notification to IMO on early implementation of MSC.1-Circ.1549.

IP Code

(Technical Advisory Notice - 003-23)

The existing standards for the carriage of more than 12 industrial personnel on board vessels engaged on international voyages are stated within MSC.418(97) – the ‘Interim recommendations on the safe carriage of more than 12 industrial personnel on board vessels engaged on international voyages’. Cargo ships constructed before the entry into force of the IP Code, and holding an authorisation under MSC.418(97) prior to the entry into force of the IP Code, may comply with a reduced version of the Code (i.e. only regulations III/1, III/2 (except for paragraph 2.1.7), IV/7 and IV/8.

Cargo ships that are constructed after the entry into force and cargo ships that are constructed prior to the entry into force but do not hold an authorisation under MSC.418(97) must comply with the full version of the Code.

It will be necessary to obtain documentary evidence of compliance with MSC.418(97) in order to benefit from the grandfathered version of the code.

Recognised Organisation (RO) is authorized to undertake the relevant surveys and issuance of the Industrial Personnel Safety Certificate and Record of Equipment.

However, with the agreement of the Administration, Recognised Organisation (RO) do not issue any Statement of Compliance (documentary evidence of compliance) relating to MSC.418(97); in such a case the Administration can undertake this service for any Isle of Man Registered ships (Administration email dated 22/05/2023).

Other

Bulk carriers

(Emails from the Administration dated 17 and 20/11/2014)

The Isle of Man will be applying the definition of “bulk carrier” as contained within MSC.277(85) to all new or existing vessels wishing to register in the Isle of Man, as follows:

  1. Vessels currently registered

    Existing vessels constructed prior to 1st January 2009 may remain as currently defined.

    Vessels with a keel lay date between 1st January 2009 and 1st November 2014 may remain as currently defined, but will require to apply for a letter of acceptance from the Ship Registry as to the application of the definition.

  2. Vessels not yet registered

    Existing vessels constructed prior to 1st January 2009 may remain as currently defined.

    Vessels with a keel lay date between 1st January 2009 and 1st November 2014 may be accepted onto the register with their existing definition with the prior agreement of the Ship Registry if it is not practicable to meet the requirements of a “bulk carrier”, however will require to be issued with a letter of acceptance by the Ship Registry.

    All vessels with a keel lay date or in a position of build that it is practicable to meet the requirements of a “bulk carrier” after 1st November 2014 are to meet the requirements of MSC.277(85) in its entirety.

In terms of the SOLAS definition for bulk carriers “primarily to carry dry cargo in bulk” means that the vessel has been primarily designed to carry dry cargoes in bulk and to transport those cargoes which are carried, and loaded or discharged, in bulk, and which occupy the ship’s cargo spaces exclusively or predominantly. In addition “includes such types as ore carriers and combination carriers” and “constructed generally with single deck, top-side tanks and hopper side tanks in cargo spaces” means that ships are not considered outside the definition of bulk carriers on the grounds that they are not ore or combination carriers or that they lack some or all of the specified constructional features as was previously indicated.

Therefore any vessel that is constructed and designed to primarily carry dry cargoes in bulk, no matter how constructed will be deemed to be a “bulk carrier” (MSC.277(85) 1.5).

It should be noted that this does not preclude the carriage of cargoes other than bulk dry cargo, in which case the vessel will remain a “bulk carrier”, other ship types may occasionally carrying dry cargoes in bulk, provided that they comply with the requirements of MSC.277(85) 1.6 or 1.7 and in which case the vessels will not be deemed to be “bulk carriers”.

All vessels to which this circular applies, if not a bulk carrier, but meeting the requirements of 1.5, 1.6 or 1.7 of the circular should be issued with a letter from Recognised Organisation (RO) identifying that they are either:

  1. A ship meeting the definition of 1.5 of the Resolution and therefore not a bulk carrier; or

  2. A vessel which may occasionally carry dry cargo in bulk meeting the definition of 1.6 or 1.7 of the Resolution.

Refer also to the “Technical Instructions” displayed in Technical Instructions to ROs and their Surveyors.

Carriage of Dangerous Goods (SOLAS Chap. VII)

Manx-registered ships are not permitted to carry packaged irradiated nuclear fuel, plutonium and high-level radioactive wastes.

Refer also to “Technical Instructions” displayed in Technical Instructions to ROs and their Surveyors.

Electronic Log Books

(TAN 011-23)

This TAN applies to the following log books where an operator chooses to maintain them in an electronic format:

  • GMDSS Log Book (SOLAS Chapter IV, Regulation 17)

  • Navigation Log Book (SOLAS Chapter V, Regulation 28)

The standards within this TAN may be voluntarily applied to other electronic log books for which there is no prescribed standard, e.g. Bridge/Engine Room Log Book.

Refer to TAN 008-20 Sections 3 and 4 for Flag State Interpretations relating to electronic signatures, storage of data and offline records.

Once the generic system has been confirmed by an RO as meeting the standards in section 3 of TAN 011-23, and the Electronic Record Book and any associated hardware has been installed onboard the vessel, the ship’s RO must be contacted to arrange for confirmation that the system has been installed correctly on the ship, including any ship’s specific items such as back-up systems.If satisfied the system is acceptable, the ship’s RO will issue a Declaration of Electronic Record Book to the ship. This Declaration must be retained onboard as evidence that the system has been accepted.

(TAN 002-25)

This TAN applies to the following documents, where an operator chooses to maintain them in an electronic format:

  • Official Log Book

  • Official Log Book (Passenger Ships)

Whilst the List of Crew may be maintained in an electronic format, it is not required to meet the standards in this TAN.

The system must be approved by an Isle of Man Recognised Organisation against one of the standards stated in Section 3 of this TAN, and issued with an approval document to confirm this.

Once the system has a generic system approval, the manufacturer may apply to the Administration to approve the system for use on Isle of Man registered ships by contacting marine.survey@gov.im. The system must satisfactorily demonstrate that it meets the requirements stated in MSN 004 as applicable for each document type. Additionally, the Ship Registry may review the system against any of the requirements of this notice, should it be deemed necessary.

IGF Code

Alternative Design and Arrangements (ADA)

(REG-UI 009)

Until the interim guidelines for use of alternative fuels are made mandatory under the IGF code or otherwise, an Alternative Design and Arrangements (ADA) process is to be followed.

The interim guidelines for the fuel or system components in consideration can be used as a basis for the ADA unless otherwise stated by the administration.

In accordance with the ADA process, when the alternative design and arrangements has received final approval, the administration will issue the document of approval and submit the report on approval to the IMO via the IMO Global Integrated Ship Information System (GISIS) website.

Where all risk assessments required by the interim guidelines have been completed and compliance with the prescriptive and functional requirements of the interim guidelines has been confirmed via the plan approval and site survey, the qualitative and quantitative risk analysis as referenced in MSC.1/Circ.1455 are not required.

Where a vessel is unable to comply with any of the provisions of the interim guidelines, no exemption request is necessary as the ‘deviation’ can be addressed within the ADA process and within the context of the whole design. However, these deviations should be highlighted to the Administration.

MARPOL 73/78

Annex I. IOPP certificate

Refer to Manx Shipping Notice on MARPOL Annex I, MSN 066 and to the “Technical Instructions” displayed in Technical Instructions to ROs and their Surveyors

Surveys

  1. No extension of certificate validity may be granted.

    Where circumstances do not permit the renewal survey to be completed by its due date, the surveyor shall contact the Administration for further instructions.

  2. Should any deficiency be found which cannot be dealt with at the time of the survey and which, in the opinion of the attending Recognised Organisation (RO) surveyor, would affect the validity of the certificate, the Administration shall be contacted for advice on an urgent basis.

    All relevant information should be made by fax or telephone to enable the Administration to make an informed response to the Recognised Organisation (RO) surveyor on the course of action to be taken.

Annual surveys
  1. If the requested survey is found to be outside the plus or minus 3-month envelope from the due date of the survey, the Administration shall be contacted for advice.

  2. Any alterations or amendments to the IOPP system or equipment should be verified for correct operation and that the correct type-approval documentation for new equipment should be on board.

    The alterations should be noted and the IOPP certificate and record of equipment amended and endorsed appropriately. Details should be sent to the Administration at the completion of the survey.

  3. The manual for Shipboard Oil Pollution Emergency Plans (SOPEP) should carry the approval endorsement of the Administration.

    An example is displayed in the paragraph 6.2 of the “Process” section in the related survey procedure.

  4. Oil tankers are required to have also approved manuals for:

    1. Ballast monitoring and control,

    2. Crude oil washing procedures.

    with appropriate approval or acceptance endorsements.

  5. Particular attention should be paid to the correct completion of the oil record books as these increasing feature in Port State Control reports. It is considered as a good practice to endorse the record book at completion of the examination.

  6. The same process applies to intermediate surveys. Ship owners and operators should be encouraged to apply for an intermediate survey in conjunction with either the 2nd annual or 3rd annual surveys.

Regulation 12.2.2

The Administration adopts the Unified Interpretation for regulation 12.2.2 (MEPC.1/Circ.753).

Add-on equipment for upgrading Resolution MEPC.60(33) - compliant oil filter equipment

(Email from MCA dated 11/10/2012)

Recognised Organisation (RO) is authorised to issue the certificate of type approval for add-on equipment on behalf of the Administration providing the equipment performance has meet the requirements contained within the “2011 guidelines and specifications for add-on equipment for upgrading Resolution MEPC.60(33) - compliant oil filter equipment” (Resolution MEPC.205(62)).

A format for this certificate is included in the appendix 1 of these guidelines.

It should be noted however, that the add-on equipment is not a mandatory requirement by the Administration.

Stability instrument

(Email from MCA dated 09/09/2015)

The IMO Resolutions MEPC.248(66), MSC.369(93) and MSC.370(93) allow waiving of the requirement of the stability instrument capable of verifying compliance with intact and damage stability requirements which is required to be fitted on board oil tankers, chemical carriers and gas carriers.

The Ship Registry’s policy is that a waiver should only ever be issued as a last resort where fitting a loading instrument is impractical or the costs of providing one would be prohibitive. A waiver will only be granted by the Ship Registry based upon evidence provided by the Recognised Organisation.

The waiver would need to be accompanied by comprehensive approved stability information available on-board to support this.

Refer also to the “Technical Instructions” displayed in Technical Instructions to ROs and their Surveyors.

Regulation 12A

(Item 2.b. of the 2015 BCC meeting)

Definition of “major conversion” under MARPOL Annex I (Regulation 1.9.1) includes “any modification which otherwise so alters the ship that, if it were a new ship, it would become subject to relevant disposition of the present convention not applicable to it as an existing ship”. Any modification of tank/s on any ship (existing or new) that results in overpassing the total FO capacity on board over 600 m3 would thus be considered as a major conversion in regard to application of Regulation 12A (Oil fuel tank protection).

In principle, full compliance with Regulation 12A is required. Nevertheless where full compliance with Regulation 12A is not feasible on any specific case, this should be brought to the attention of the Administration by Recognised Organisation (RO) for consideration of any alternate proposal.

Ship-to-Ship transfer operational plans

Recognised Organisation (RO) is authorised to approve STS Operational Plans in accordance with MARPOL Annex I Regulations 40 & 41. The Ship Registry recommends that at the next opportunity, existing STS Plans are revised and re-approved by an RO on behalf of this Administration in accordance with: “Refer to Manual on Oil Pollution, Section 1, Prevention, 2011, Edition, and the OCIMF Ship to Ship Transfer Guide for Petroleum, Chemicals and Liquefied Gases (2013)”

For further information, refer to MSN 066 in attached file.

Annex II. NLS certificate

MARPOL Annex II is applied in the Isle of Man by the Merchant Shipping (MARPOL Annex II - Control of Pollution by Noxious Liquid Substances in Bulk) Order 2020. This Order applies Annex II up to MEPC.315(75).

Further guidance is provided in Manx Shipping Notice MSN 067.

Surveys

No extension of certificate validity may be granted.

Where circumstances do not permit the renewal survey to be completed by its due date, the surveyor shall contact the Administration for further instructions.

Annual surveys
  1. Should any deficiency be found which cannot be dealt with at the time of the survey and which, in the opinion of the attending Recognised Organisation (RO) surveyor, would affect the validity of the certificate, the Administration shall be contacted for advice on an urgent basis.

    All relevant information should be made by fax or telephone to enable the Administration to make an informed response to the Recognised Organisation (RO) surveyor on the course of action to be taken.

  2. If the requested survey is found to be outside the plus or minus 3-month envelope from the due date of the survey, the Administration shall be contacted for advice.

  3. The manual for procedures and arrangements in respect of the carriage and handling of all noxious liquid substances carried in accordance with the INLS certificate should carry the approval endorsement of the Administration as follows:

    graph7
  4. Particular attention should be paid to the correct completion of the cargo record books as these increasing feature in Port State Control reports. It is considered as a good practice to endorse the record book at completion of the examination.

  5. The same process applies to intermediate surveys. Ship owners and operators should be encouraged to apply for an intermediate survey in conjunction with either the 2nd annual or 3rd annual surveys.

Application of OSV Chemical Code – Transitional Period

(TAN 001-21)

On 1 January 2021, amendments to the IBC code entered into force which re-classified a number of cargoes which were commonly carried on OSVs under Appendix 1 of the LHNS Guidelines. Many cargoes previously deemed ‘pollution-only products’ are now also deemed ‘safety hazard’ productions. In addition a number of previously ‘non-toxic’ cargoes have been reclassified as ‘toxic’. The result of this is that the range of cargoes able to be carried by OSVs certified to the LHNS guidelines is vastly reduced.Such vessels must decide whether to continue to operate under the LHNS Guidelines with the reduced range of cargoes, or to convert to the OSV Chemical Code. This should be considered in partnership with the vessel’s Recognised Organisation. To assist, the Isle of Man Ship Registry can consider application of a transitional period of one year.

During the transitional period, ships complying with LHNS guidelines may be permitted to continue carrying products listed in Appendix 1 subject to any conditions specified by the coastal state. Any vessel wishing to make use of a transitional arrangement should contact the Isle of Man Ship Registry. A request is likely to be looked upon favourably if it complies with the position of the coastal state(s) where the vessel is operating and is agreed with the relevant authority.

From 1 January 2022, vessels that opt to continue to operate under LHNS Guidelines will be restricted to a reduced range of cargoes. The permitted cargoes are listed in Annex I of MGN 649. For ships that wish to transition to compliance with the OSV Chemical Code, Recognised Organisation (RO) is fully authorised to provide survey and certification services.

Refer also to the “Technical Instructions” displayed in Technical Instructions to ROs and their Surveyors.

Annex IV. ISPP certificate

(MSN 069)

All surveys with respect to MARPOL Annex IV have been fully delegated to Recognised Organisation (RO).

MARPOL Annex IV has been extended to the Isle Of Man and entered into force on 13 February 2012.

Any statement of compliance placed on-board is to be replaced by an international certificate as soon as possible, but no later than the next annual survey on-board.

Refer also to the “Technical Instructions” displayed in Technical Instructions to ROs and their Surveyors.

Maximum permissible rate of discharge

(30th RO British Certification Committee Meeting - 10th February 2021)

Recognised Organisation (RO) is to approve the maximum permissible rate of discharge of untreated sewage (as per MARPOL Annex IV reg.11.1.1) which should be vessel specific and achievable, taking fully into account the capacity (fixed/variable) of the pump provided, for different combinations of draft and speed.

(TAN 007-21)

Administration confirms it shall be retrospective with reviews for discharge rates taking into account this requirement undertaken at the first available opportunity. This would be in line with Annex IV Reg 4.6.

Given MARPOL Annex IV survey and certification cycles, a vessel could in theory have been surveyed and certified under MARPOL IV just prior to the implementation of this requirement into Recognised Organisation (RO) Country files, which may not have necessarily extended to the review of pump capacities inclusive of type against draft and speed, and may operationally remain non-compliant. As such, a discharge rate issue could remain present until the renewal survey unless an interim situation develops (Annex IV Regs 8.2, 8.5, or 8.7) which may require Recognised Organisation (RO) to review the on board arrangements.

Variable Discharge Pumps

(Refer to the “Technical Instructions” displayed in Technical Instructions to ROs and their Surveyors.)

When approving the maximum permissible rate of discharge of untreated sewage (as per Reg 11.1.1) Recognised Organisation (RO) is requested to ensure this is both vessel specific and achievable, taking fully into account the capacity of the pump(s) provided for different combinations of draught and speed.In addition to the above, and pending further review at IMO, the Administration is content that Recognised Organisation (RO) may accept existing variable rate discharge pumps providing that the variable rate of the pump can be fixed to a discharge rate which renders the most effective discharge rates compliant with the Regulation.

The pump discharge rates should be detailed on the sewage discharge rate table approved by Recognised Organisation (RO). Also, suitable instructions should be included within the ship’s SMS/Sewage discharge procedures to ensure that the approved pump discharge rate is not exceeded in service during sewage discharge operations.

(33rd RO BCC meeting - 2nd May 2024)

Where a variable discharge rate pump is fitted, it can be accepted, subject to the rate being fixed at whatever rate is the most suitable for the pump (e.g. in relation to suction, flow rate, cavitation, overheating etc) provided the discharge rate is within the requirements of the Regulation.

If the maximum discharge rate of the installed pump(s) means the discharge is greater than that allowed under the Regulation, then a lower rate will need to be used that is within the Regulation parameters, if that rate is not suitable for the pump in question (i.e. ineffective or damages the pump) a new or alternative pump will need to be used, that allows discharge in line with regulation.

Annex V

(MSN 070)

Revised MARPOL Annex V

Refer to the “Technical Instructions” displayed in Technical Instructions to ROs and their Surveyors.

Garbage Record Book (GRB)

Garbage Record Books (‘GRBs’) are required under MARPOL Annex V, Regulation 10 for ships of 400gt or above, or carrying more than 15 persons.

Following recent and forthcoming changes to the GRB (amendments for Polar Code and HME Substances), current GRBs will require replacement by 1st March 2018.

For further information, refer to attached file “TAN 001-18.pdf”.

Annex VI. IAPP, EIAPP, IEE certificates and IMO DCS

(MSN 071)

Delegation

All surveys with respect to MARPOL Annex VI have been fully delegated to Recognised Organisation (RO).

MARPOL Annex VI has been extended to the Isle of Man and entered into force on the 5th April 2012.

Any Statement of Compliance placed onboard is to be replaced with an International Certificate, as soon as possible, but no later than the next annual survey onboard.

NOx Technical Code 2008

Refer to the “Technical Instructions” displayed in Technical Instructions to ROs and their Surveyors

Exhaust Gas Cleaning Systems (EGCS)

  1. MEPC.184(59) - Guidelines for EGCS

    The Isle of Man Ship Registry does not consider as acceptable averaging SOx emissions from “over performing” equipment against untreated equipment as the means to comply to the SOx emission limits requirements.

    To further clarify, the Isle of Man Ship Registry does not interpret this arrangement to cover engine streams where the stack is not common, e.g. a ship with multiple stacks where one stack is treated while another emits higher sulphur.

  2. EGCS – Approval Process & Guidance in case of Failure (TAN 010-19)

    The Administration accepts EGCS as an equivalence to MARPOL Annex VI Regulation 14 provided that they are in accordance with IMO guidelines. For ships with a keel laid date of 1st June 2022 or after, or retrofitted EGCS installed on or after this date, the relevant guidelines are MEPC.340(77). For EGCS installed before this date, but after 15th May 2015 the relevant guidelines are MEPC.259(68).

    Ship owners wishing to make use of this provision should follow the procedure stated below:

    1. The owner arranges the EGCS to be approved by Recognised Organisation (RO) in accordance with MEPC.340(77).

    2. Recognised Organisation (RO) is authorised to issue a short term IAPP noting the equivalence and the EGCS may then be put into service.

    3. As soon as possible during the period of the short-term IAPP, Recognised Organisation (RO) shall send an application for the equivalence to the Ship Registry. This should include as a minimum: - Class Approval Letter; - Short-Term IAPP Certificate and Supplement; and - The required documents specified under paragraph 2.3 of MEPC.340(77).

    4. The Administration will review the application, and if acceptable, advise IMO via an entry to the Global Integrated Shipping Information System (GISIS). Once complete, the Administration shall advise Recognised Organisation (RO).

    5. When Nitrate Analysis is completed to the satisfaction of Recognised Organisation (RO), a full-term IAPP certificate can be issued.

    Alternatively, the owner may elect not to have a short term IAPP; in this case compliant fuel must be used until both the nitrate analysis and notification to IMO is complete and the IAPP certificate is amended to note the equivalent arrangement.

    EGCS malfunction

    In case of EGCS malfunction, the guidance in MEPC.1/Circ.883 should be followed.

    Tonnage recalculation

    Where an EGCS is retrofitted to a vessel, tonnage must be re-measured following any changes to enclosed spaces which may occur as a result. If these changes do not constitute an increase or decrease of more than 1% of the gross tonnage, the owner of the vessel may elect to either;

    - Note the change as an annotation on the current ITC; or

    - Request a new ITC be issued noting the change;

    In either case the ITC shall retain the existing tonnage figures. If any change, or the cumulative effects of multiple changes exceed more than 1% increase or decrease of the gross tonnage stated on the ITC, then the tonnage shall be recalculated and the new figure should be used on the Tonnage Certificate and all other Convention certificates.

Boil-off gas co-firing equivalence

(Refer to “Technical Instructions” in Technical Instructions to ROs and their Surveyors)

The Ship Registry accepts the boil off gas co-firing equivalence permitted by EC Decision 2010/769/EC in the North Sea and Baltic Sea ECAs. MTN 2015/07 refers. When completing the IAPPC supplement, the equivalence reference in 2.6 is 'EC Decision 2010/769/EC'. The Ship Registry is not submitting an equivalence under MARPOL Annex VI, Regulation 4 to the IMO.

(Email from MCA dated 05/08/2015)

Recognised Organisation (RO) is requested to keep the Administration informed should Recognised Organisation (RO) has an approved job in relation to the boil-off gas co-firing equivalence.

Approved method process for marine diesel engines

(Refer to “Technical Instructions” in Technical Instructions to ROs and their Surveyors)

2014 Guidelines on the Approved Method Process for marine diesel engines installed on a ship constructed prior to 1 January 2000:

To comply with MARPOL VI/13.7.1 requirement for the use of an approved method the Ship Registry has adopted the Guidelines in Resolution MEPC.243(66) - 2014 Guidelines on the Approved Method Process.

SEEMP/EEDI

(Refer to “Technical Instructions” in Technical Instructions to ROs and their Surveyors)

Recognised Organisation (RO) is authorised to conduct all work relating to SEEMP and EEDI under the existing MARPOL Annex VI authorisation.

Data Collection System for fuel oil consumption of ships

(Refer to “Technical Instructions” in Technical Instructions to ROs and their Surveyors)

Recognised Organisation (RO) is authorized to perform the following statutory services under the provisions of the new MARPOL VI, Regulation 22A which entered into force on 1 March 2018 as per resolution MEPC.278(70):

  • Review the SEEMP to confirm that Part II includes a description of the methodology that will be used to collect the data required by regulation 22A.1 not later than 31 December 2018, and issue of the “Confirmation of Compliance”.

  • Verify fuel oil consumption data for the calendar year (initial year starts on 1 January 2019) and, upon satisfactory review based on resolution MEPC.292(71), 2017 Guidelines for Administration verification of ship fuel oil consumption data, issue the “Statement of Compliance”.

  • Report results of the verification to the IMO Ship Fuel Oil Consumption Database (copy of report will be provided to the Administration) based on resolution MEPC.293(71), 2017 Guidelines for the development and management of the IMO Ship Fuel Oil Consumption Database, not later than one month after the issuance of Statements of Compliance.

  • Verify onboard, during the MARPOL VI IAPP Survey, that the SEEMP and associated “Confirmation of Compliance” is onboard and valid.

If an owner/manager wishes for another RO to carry out the MARPOL VI Reg 22A work on their ship(s), they shall contact the RO who has issued the IAPP certificate to obtain their written agreement.

(Administration email dated 17/08/2018)

SEEMP amendments:

On or before 31 December 2018, in the case of ships of 5000GT or above, the Ship Energy Efficiency Management Plan (SEEMP) is to be confirmed by Recognised Organisation (RO) surveyors as including a description of the methodology that will be used to collect the data and the processes that will be used to report the data to the ship's flag State.

Enhanced Collection of Fuel Usage Data

(REG-UI 006 Amendment 02)

The simplest and most direct method to record and report the enhanced DCS is by fitting flow meters for each consumer taking into account the guidance provided within MEPC.346(78), section 7.2.

These meters would then be read each year and the difference calculated. Photographic evidence of flow meter readings may be used in support of the required data submission. Recognised Organisation (RO) verifying the submission may be sent the evidence and the completed submission at the agreed time. Flow meters should be maintained and calibrated in accordance with manufacturer recommendations.

The IMO also allow for systems of calculation and estimation to be used as the basis for submission of the Enhanced DCS. The Administration do not recommend the use of such systems for recording the enhanced DCS given the potential for the data to be compromised by inconsistencies over the course of a year.If such a system is to be used, the SEEMP must incorporate clear and detailed instructions of the measurements and estimates to be used for the submission. In this case the data will need to be accumulated consistently throughout the year.

Recognised Organisation (RO) shall:

  • Ensure ships have in place all required equipment for measuring or otherwise determining the fuel usage in each consumer.

  • Ensure that for all ships, the SEEMP has been modified with all procedures required to complete the required measurements or alternative procedures.

  • Ensure all ships are recording Enhanced DCS data for submission in January 2027 and each year thereafter.

Sampling points

(TAN 005-21)

MARPOL sampling points must be physically marked and clearly identified on the relevant piping diagram for the system. The easiest solution to meet the requirement will be to designate existing sampling points as MARPOL sampling points. Where not possible, vessels are required to fit new sampling points.

EEXI

(TAN 007-22)

The authorisation for verification of EEXI extends to all Isle of Man vessels irrespective of being classed with Recognised Organisation (RO), provided that:

  1. The verification is carried out with the agreement of the RO which classes the vessel who have been authorised for issuing the International Energy Efficiency Certificate for ensuring clarity on respective responsibilities.

  2. The verification is limited to reviewing the EEXI Technical File and the estimated speed power curve obtained from the tank test and/or numerical calculations and/or the sea trial results calibrated by the tank test in accordance with the EEDI Survey and Certification Guidelines (MEPC.333(76)).

  3. Where an overridable Shaft/Engine Power Limitation system is installed, the verification would confirm that the system is appropriately installed and sealed on board in accordance with Guidelines on the Shaft / Engine Power Limitation system to comply with the EEXI requirements and use of a power reserve (MEPC.335(76)) and that a verified Onboard Management Manual (OMM) for overridable Shaft / Engine Power Limitation is on board the ship. This onboard verification task would be performed by the RO that classes the vessel; and

  4. The RO performing the verification notifies the Administration prior to commencing the verification process.

IACS Recommendation 172

(Administration email dated 15/12/2022)

The EEXI compliance verification and approval process have been delegated to the recognised organisations (RO), therefore the Administration is in agreement with RO to use IACS Rec 172 for type approval of ShaPoLi systems.

IACS Rec 172 has taken into consideration the guidelines MEPC.335(76) and therefore the Administration has no objection to use ShaPoLi systems on board the Isle of Man registered vessels as long as it remains compliant with the IACS Rec 172 requirements. The Onboard Management Manual (OMM) would also conform to the guidelines MEPC.335(76). It is generally acceptable to consider SHaPoLi systems in accordance with paragraph 6.6 of IACS Recommendation 172, as long as the system is type approved by an IACS member. For the moment, the Administration do not have any specific requirements and accept IACS Rec 172 for type approval of the installation.

Cruise passenger vessels fitted with gas turbine

(REG-UI 003 Amendment 01)

Cruise passenger vessels fitted with gas turbine plant as part of a diesel engine / gas turbine installation are allowed to exclude the gas turbines from the power-weighted average calculation of the specific fuel consumption used in the EEXI calculations for these ships.

This is conditional on the gas turbines only being used for emergency situations to secure the safety of the ship or saving life at sea.

When a Gas Turbine, which has been excluded from the ship’s EEXI rating, is used in an emergency situation it will be considered a use of the power reserve. Examples of this include operating in, or the avoidance of, adverse weather and ice-infested waters, participation in search and rescue operations, when sick passengers or crew need to be transferred ashore urgently, avoidance of pirates and for engine maintenance. Details must be recorded in the Onboard Management Manual (OMM) as described in MEPC.335(76) section 3.2. Use of the power reserve must be reported to the Recognised Organisation (RO) and the port of destination. The flag administration will report all cases of the use of power reserve to the IMO on an annual basis.

If an operator wishes to continue to use gas turbines during the routine operation of the vessel, then the gas turbines must be taken into account when calculating the EEXI rating for the ship.

Use of SHaft Power Limitation (SHaPoLi) systems (IACS Rec.172)

(REG-UI 004 Amendment 03)

The Administration accepts the IACS Recommendation 172 as amended, provided SHaPoLi systems comply with the following requirements:

  1. The SHaPoLi system should be fitted with a visual indication and an audible alarm at the control position on the bridge. The visual indicator should indicate when the power is approaching the power limit and remain visible whilst the power limit is being exceeded. The audible alarm may be acknowledgeable (silenced).

  2. In addition to the above an alarm is to be fitted to indicate system malfunction.

  3. The SHaPoLi / EPL system should be non-permanent but should require the deliberate positive action of the ship's master or the OICNW to enable the use of unlimited shaft / engine power (power reserve) of the ship. This should be via the use of a key switch or similar. For existing vessels where the use of a key switch to access the power reserve is not practicable, a suitable alternative may be considered. By way of example, the acknowledgement of the audible alarm(s) required in 3.1.1 and the continued use of the reserve power may be considered as deliberate positive action. For systems that use a Password/PIN to control access to the power reserve override, attention should be paid to ensure that the necessary Password/PIN is always available when override is required by the ship in a scenario specified in regulation 3.1 of MARPOL Annex VI, which may endanger safe navigation of ship. Immediate use may be achieved by procedural arrangements for pre-emptive un-limiting of the SHaPoLi / EPL system.

  4. Records of the use of the power reserve shall be submitted to Recognised Organisation (RO) and the port of destination without delay. The Administration interprets ‘without delay’ to mean within 24 hours of the last event. Recognised Organisation (RO) is authorized to transmit these records onward to the IMO, at the appropriate intervals. Recognised Organisation (RO) is also requested to transmit copies of these records to the office of the Administration which is responsible for the vessel.

  5. If the power limit is exceeded inadvertently (due to a change in sea or tidal conditions, for example) the system should alert the bridge and automatic data recording shall begin within 300 seconds (5 minutes) after the limit is exceeded. This time delay is intended to allow the operator to modify the input if the use of reserve power is not necessary.

  6. Any use of the power reserve or inadvertent exceedance of the power limit (beyond the 300s time limit) must be recorded in the OMM and in accordance with the guidelines.

  7. The reactivation or replacement of the SHaPoLi / EPL system following any use of the power reserve, must be confirmed and supported by documentary evidence such as OMM log extracts and photographic evidence, by the Master or operator of the vessel, to Recognised Organisation (RO) at the earliest opportunity. Recognised Organisation (RO) shall review all documentary evidence submitted, to verify the satisfactory reactivation or replacement of the SHaPoLi / EPL system. Such verification may, if so required, extend to an occasional survey, which may be undertaken via stablished remote survey means.

  8. Recognised Organisation (RO) shall during the required MARPOL Annex VI (IAPP) periodical attendances, verify that all occasions where the reactivation or replacement of the SHaPoLi / EPL system has taken place, have been reported. Recognised Organisation (RO) shall verify that corresponding entries are contained within the OMM log, together with supporting documentary evidence demonstrating the reactivation or replacement of the SHaPoLi / EPL system.

For overridable systems, the existing manoeuvring booklet, if available, and the manoeuvring information displayed on the navigating bridge shall (1) include the ship’s power; if it has been limited and (2) state the limiting power for the attention of the Master to account for the ship’s performance in case no corresponding sea trials are carried out.

For non-overridable systems, the stopping times and distances, and the data of the turning circles as per SOLAS Reg. II-1/28.3 and Res.MSC.137(76) respectively, are to be recorded on new trials, where applicable. Also, the existing manoeuvring booklet, if available, and the manoeuvring information displayed on the navigating bridge (pilot card and wheelhouse poster) are to be updated.

The Administration requires that any update of the manoeuvring characteristics of the ship (in respect to Overridable or Non-overridable system) is verified by Recognised Organisation (RO) and to be completed no later than the next scheduled periodical survey related to the Safety Construction Certificate (SAFCON).

In cases where the manoeuvring characteristics of the ship are determined by new sea trials; Recognised Organisation (RO) will, as part of the verification stated above, verify that the new sea trial has been undertaken in accordance with the requirements for new sea trials contained within IACS Recommendation No. 172 (as amended).

In cases where Recognised Organisation (RO) has witnessed the new sea trial, a witness statement attesting to the effect of the SHaPoLi arrangement, shall be issued by Recognised Organisation (RO).

Alternative methods for updating the manoeuvring characteristics, such as CFD (Computational Fluid Dynamics) numerical calculations, are acceptable subject to plan appraisal, and are to be included in the EEXI technical file.

Issuance of short term/limited validity letter/permit in relation to any interim compliance scheme for EEXI (ShaPoLi/EPL systems)

(32nd RO BCC meeting - 29th June 2023)

Recognised Organisation (RO) is to approach the Administration when situation arise, for possible temporary dispensation, on a case by case basis.

EEXI implications in case of change from Bulk Carrier to General Cargo

(33rd RO BCC Meeting - 2nd May 2024)

The position of the Administration is: if a vessel has been built and designed as a bulk carrier, and there is no evidence of significant change, then it will remain a bulk carrier.

SEEMP Part III and Carbon Intensity Indicator (CII)

(TAN 007-22)

The authorisation for approval of SEEMP Part III under MARPOL VI/26 and verification of Carbon Intensity Indicator (CII) under MARPOL VI/28 of Isle of Man ships is extended to the respective Isle of Man RO who has additionally taken on the responsibility for IMO Data Collection System (DCS) for Fuel Oil Consumption of those ships, i.e. the DCS and CII verification, and issuance of Statement of Compliance for a Isle of Man ship must be carried out by the same Isle of Man RO irrespective of whether that RO has classed the ship.

This permission is subject to that RO taking full legal responsibility for the whole of the DCS, CII and SEEMP Part III work, or the ship owner ensuring an agreement exists between the DCS/CII RO and the ships’ primary RO as to who owns responsibility for the shipboard elements of the DCS and CIII work and related certifications. The Administration would emphasise the importance of the owner having documented, legal clarity as to who takes responsibility for each element.

SEEMP Company Verification/Audits

(Refer to “Technical Instructions” in Technical Instructions to ROs and their Surveyors)

The SEEMP Part III Company Verification/Audit can be undertaken by any RO without prior consultation with the Administration, when this RO is the same than the ISM RO.

(Administration email dated 15/05/2026)

Pending update of “Technical Instructions” at the next revision, the policy has been amended as follows:

SEEMP verifications/audits should be undertaken where possible coincidental with ISM DOC verifications. This may be additionally applicable in the case of ISO 14001 (or similar) audits. A combination of related audits serves to reduce the overall impact/burden on companies. Where DOC audits are retained by the Administration, best endeavours will be made to facilitate concurrent attendance with the RO undertaking the SEEMP Company Audit, however this may not always be possible.

Where a SEEMP company verification/audit is to be undertaken on a stand-alone basis, this will be considered on a case-by-case basis by the Administration. In doing so, the Administration may also consider authorisation of remote audit techniques if the audit is limited to verification of documentary evidence.In respect of RO’s authorised for SEEMP audits, that entity should be the same RO responsible for the International Air Pollution Prevention Certificate (IAPPC) and International Energy Efficiency Certificate (IEEC), especially considering shipboard verifications. If shipboard ISM audits have been delegated, and a SEEMP shipboard audit is required, the ISM RO should carry out this audit. Where the ISM Company audit has not been delegated: If the entire fleet of a company is classed by the same RO, the same RO responsible for IAPPC/IEEC should perform the SEEMP Company audit. However, if the fleet is classed by different ROs, to reduce overall audit burden then it should be considered whether it is more appropriate for the audit to be completed by the DCS verifier.

In respect of frequency of audits, the company should be audited every three years after the first issuance of the Confirmation of Compliance, and/or after any amendment/revision of the SEEMP.

Documentation required to facilitate the verification/audit should as a minimum consist of:

  • Approved SEEMP and Confirmation of Compliance certificate;

  • Statement of Compliance certificates for last three years;

  • Records related to the elements of IACS Rec. 175, section 7.1;

  • Documentation in support of analysis of the cause for the inferior CII rating (as applicable);

  • Documentation in support of analysis of the performance of measures in the previous implementation plan (as applicable);

  • Documentation in support of additional and revised measures added to the implementation plan (as applicable); and

  • Potential identified impediments to the effectiveness of the additional measures and relevant mitigation measures put in place to overcome such impediments.

Additional company audits should be undertaken for managers/operators of ships rated as D for three consecutive years, or, E for one year, to verify the progress related to additional/revised measures added to the three-year implementation plan.

Shipboard verifications/audits would not normally be considered as part of the company verification process unless additional/revised measures added to the three-year implementation plan, or, amendments to SEEMP have a direct impact on shipboard operations.

Based on the outcome of the additional SEEMP company audit in the case of a ship rated as D for three consecutive years, or a ship rated as E, the need for an additional shipboard verification/audit should be considered

Shipboard verifications where suitable may be undertaken coincidental with ISM SMC verifications, or, next upcoming IAPP/IEEC survey window.

Biofuels

NOx compliance

(TAN 008-22)

Refer to TAN 008-22, in particular to Appendix 1 “Compliance with MARPOL Annex VI Regulation 18.3 for Engines Using Biofuel Blends”, for NOx compliance.

MEPC.1/Circ.795/Rev.9

(REG-UI 008)

This REG-UI 008 is to provide the REG position on the application of the guidance in interpretation 15 of MEPC.1/Circ.795/Rev.9 as amended. The flow chart given in Figure 1 provides a comprehensive summary of the REG policy position on biofuels and NOx emissions for all scenarios.

Biofuels (MEPC.1/Circ.905)

Ships using fuel blends with biofuels or synthetic fuels, regardless of percentage, do not fall under “alternative fuel oils” as defined in MARPOL Annex VI Regulation 4. Therefore, no acknowledgement by the Administration is required, and there is no obligation to report particulars to IMO under MARPOL Annex VI Regulation 4. However, this does not remove the obligation to report fuel usage under the Data Collection System (DCS) (Regulation 27).

The following schemes are considered acceptable for biofuel certification:

  • ISCC and RSB (recognised internationally and by IMO).

  • Schemes listed under the UK RTFO recognised voluntary schemes.

  • ICAO-approved sustainability schemes and CORSIA criteria.

  • Other schemes aligned with EU RED Directive sustainability criteria may be assessed individually.

Documentation such as Proof of Sustainability (PoS) and LCV values (either within certification or via laboratory results) is deemed adequate alongside Bunker Delivery Notes.

Use of Cf based on Well-to-Wake emissions for certified sustainable biofuels is accepted for DCS reporting and CII calculation, provided:

  • The biofuel is certified under an international scheme.

  • It achieves at least 65% WtW emissions reduction compared to fossil MGO (94 gCO2e/MJ), resulting in less or equal to 33 gCO2e/MJ.

For blends, Cf should be calculated as a weighted average based on energy content.

MARPOL Electronic Record Books

(TAN 008-20)

The Administration has delegated the approval of MARPOL Electronic Record Books to Recognised Organisation (RO) in order to verify that requirements stated in IMO Resolution MEPC.312(74) are fulfilled.

For using Electronic Record Books, the following procedure is to be followed by the Owner:

  1. The generic system must have been approved by an Isle of Man authorised RO or a member of the Red Ensign Group (in most cases this will be by a RO); and

  2. The RO classing the ship and issuing the MARPOL certificates must be contacted in order to arrange for the system to be accepted for use onboard the ship. The RO shall verify that the system has been installed correctly on the ship, including anything ship specific such as back-up systems. If the system is acceptable, the ship’s RO issues a Declaration of MARPOL Electronic Record Book for the ship. This Declaration must be retained onboard as evidence that the system has been accepted.

Tonnage 69

ITC 69

Tonnage measurement in accordance with the International Convention on Tonnage Measurement of Ships 1969 is to be carried out by Recognised Organisation (RO). Provisional and full term International Tonnage Certificates (1969) is to be issued on behalf of the Government of the Isle of Man, for which Recognised Organisation (RO) are fully authorised. The original certificate is to be forwarded to the vessel and a copy to the Isle of Man Ship Registry.

(Agenda item 10 of the BCC meeting 2015)

Recognised Organisation (RO) is to ensure all Tonnage Certificates (ITC 69) contain the correct information as required in the convention and the specimen certificate thereto.

Certificate of survey

A certificate of survey (Form Sur 59E) document is to be completed by Recognised Organisation (RO) prior to registration in the Isle of Man and sent to the Isle of Man Registrar of Ships. The original is then to be forwarded to the Isle of Man Ship Registry.

(Email from the Flag Administration dated 18/08/2015)

When completing the Isle of Man certificate of Survey, in the box marked “Number of seaman and apprentices for whom accommodation is certified” this number is now to also include the masters cabin.

The intention is not to apply this retrospectively, only for new certificates of survey going forward.

The Flag Administration’s long term plan is to remove this requirement from the certificate of survey, but this requires a change in legislation so will be a while off.

(Agenda item 10 of the BCC meeting 2015)

Recognised Organisation (RO) is to ensure the original Certificate of Survey contains the correct information of the ship and its tonnages.

In circumstances where the original Certificate of Survey had been reissued with insufficient data, then this certificate must be promptly updated when the correct data is available at the time of completion of vessel’s construction and delivered to the owner.

Change of tonnage - REG Unified-Interpretation

(Administration email dated 03/06/2020, REG-UI 0001.A01)

The Administration would not normally consider small changes made solely for compliance with a new regulation to affect tonnage or application of regulations under other Conventions.

For “new” ships under the Tonnage Convention, tonnage shall always be re-measured following changes to enclosed spaces and if <=1% then either annotate the current certificate or issue a new certificate, at owners discretion; in either case using retaining the existing tonnage. If the cumulative effects of more than one such change exceeds 1% of the original tonnage, then the recalculated figure shall be used on the Tonnage Certificate and all other Convention certificates.

For “existing ships” the current 1% allowance under TM5./Circ.6 applies.

Yachts

(REG Tonnage Guidelines for Yachts Rev.1.2)

Yachts can be regarded as purpose-built ships which have some unique constructional features in exterior areas for aesthetical reasons or for guest recreation that do not affect the overall size or useful capacity for which it would be unreasonable to include in the vessel’s tonnage.

The document “REG Tonnage Guidelines for Yachts Rev.1.2” provides Recognized Organizations (ROs) acting on behalf of this Administration additional guidance on how to apply the International Convention of Tonnage Measurement of Ships, 1969 and TM.5/Circ.6 for typical yacht arrangements.

Guidelines Rev.1.2 are applicable to vessels with contracts signed on or after 1st January 2025 and projects with contracts signed before 1st January 2025 keel to be laid no later than 1st January 2026.

COLREG 72

Collision regulations

For new constructions:

Masthead lights, stern lights, side lights and NUC lights are required to be two tier, capable of being switched to maintain function in the event of a bulb failure or one power supply system failure. Other lights, e.g. Suez Canal etc. may be single tier.

(Refer to “Technical Instructions” in Technical Instructions to ROs and their Surveyors)

AFS Convention

AFS certificate

(Email from the Administration dated 09/06/2014 and MSN 047)

The Anti-fouling System (AFS) Convention was extended to the Isle of Man on 21/05/2014.

The Isle of Man Ship Registry is requesting Recognised Organisation (RO) to issue a full term International AFS Certificate to all Isle of Man registered vessels which have previously been issued with an AFS Statement of Compliance. This should be carried out within 6 months of the date of extension. Therefore all Statements of Compliance are requested to be replaced with International AFS Certificates prior to 21/11/2014.

For ships transferring flag to the Isle of Man Ship Registry a new International AFS Certificate may be issued based on the certificate issued by the previous Administration if the record of anti-fouling is up to date, the certificate was valid at the time of transfer and the previous Administration is a Party to the AFS Convention. If those criteria have not been met an initial survey must be carried out prior to the issue of a new International AFS certificate.

BWM Convention

BWM certificate

BWM Convention is not extended to the IoM, authorisation to carry out a survey is not required.

Following a successful survey a Statement of Compliance may be issue at the request of the owner.

Refer to the “Technical Instructions” displayed in Technical Instructions to ROs and their Surveyors.

Approval of ballast water management systems

The convention requires that the Administration approve all Ballast Water Management (BWM) systems (Regulation D-3) and issue a type approval certificate; there are also two types of system: active and passive.

Recognised Organisation (RO) is authorised to complete the following:

  1. Issue type approval certificates for systems complying with IMO Resolution MEPC.300(72) – code for approval of ballast water management systems (BWMS).

  2. Conduct plan approval for a BWM system undergoing type approval

It should be noted that the Ship Registry is not delegating type approval of BWM systems that make use of active substances using the G9 procedure, nor is the Ship Registry completing approval itself. If Recognised Organisation (RO) is approached with regard to the use of this type of system then they will only be acceptable to the Ship Registry if it has previously been approved by an acceptable flag. Recognised Organisation (RO) should contact the Ship Registry directly for confirmation of acceptability.

Commissioning test

(Refer to “Technical Instructions” in Technical Instructions to ROs and their Surveyors)

(TAN 001-22)

BWMS installed prior to the new regulation entering into force (1st June 2022) will not be subject to a commissioning test unless the vessel is required to undertake an Additional Survey due to a change, replacement or significant repair of the BWMS or associated equipment.

The collection and analysis of the samples should be undertaken by an entity independent of the BWMS manufacturer or supplier and approved by Recognised Organisation (RO) who will issue the ship’s International Ballast Water Management Certificate.

Ballast Water Management systems

(Action 7 of the RO BCC dated 31/10/2014)

The Administration will accept type approval certificates issued for Ballast Water Management Systems equipment approved in accordance with the G8 Guidelines (Resolution MEPC.174(58)) by the other Contracting Administrations, on Isle of Man ships.

Re-harmonization of IOPP certificate

(E-mails from the Administration dated 17/07/2017 & 18/07/2017)

In case of owner’s request to re-harmonise the ship’s IOPP Certificate (i.e. maintain the original certificate’s expiry date) on a de-coupled IOPP certificate, the following applies.

  1. If the ship undertook an IOPP renewal survey inside the window period applicable to an annual or intermediate survey of the original certificate, Recognised Organisation (RO) may re-issue the IOPP certificate with the same expiry date as the original certificate. The annual/intermediate surveys can be endorsed on the certificate as applicable. No prior agreement from the Administration is required.

  2. If the IOPP renewal survey was completed outside the window period applicable to an annual or intermediate survey of the original certificate, the survey date and the original certification will not match. If this is the case there may be an option to carry out an annual/intermediate (as applicable) survey to bring the survey back into line with the original certificate. However this would have to be carried out prior to 8th September 2017 and it will only be possible if the original certificate’s survey window is open before the 8th September 2017 . Prior agreement from the Administration is required (The Administration is to be contacted for a final decision to be made).

  3. If the IOPP renewal survey was completed outside the window period applicable to an annual or intermediate survey of the original certificate and the original certificate’s survey window is not open before the 8th September 2017, it will not be possible for the ship to re-harmonise the IOPP certificate prior to 8th September 2017. The Administration is to be contacted for a final decision to be made.

Initial Survey for D-1 compliance only

(UK/REG interim policy received on 24/08/2017).IMO BWM.2/Circ.40 provides for a three-month period of grace for BWM Plans to be approved and placed onboard vessels. This implies that completion of the initial survey has a similar grace period, until an approved plan is onboard.

The validity of the Statement of Compliance issued by Recognised Organisation (RO) shall reflect the status of the initial survey required by the convention. Once Recognised Organisation (RO) is satisfied that the requirements of the initial survey have been fully met, then a full term Statement of Compliance may be issued.As a consequence of the above, if the initial survey requirements are substantially met and Recognised Organisation (RO) is satisfied that the vessel is compliant with the applicable requirements of the Convention, then a one-off Statement of Compliance valid until 7th December 2017 is issued to allow sufficient time for verification of full compliance onboard.

For further information, refer to attached file “BWMC - REG Initial Survey Policy.docx”.

Hopper Dredgers

(Administration email dated 29/06/2018)

With reference to BWM.2/Circ.32, the Administration position is that water held in the hopper of a dredger does not fall under the requirements of the Convention. This does not impact on application of the Convention to any water held in the ballast tanks of hopper dredgers, should they have them.

Electronic Ballast Water Record Book

(TAN 001-25)

The generic system must have been approved by an IoM authorised Recognised Organisation (RO) or member of the REG (in most cases this will be by a RO); and

Recognised Organisation (RO) must be contacted in order to arrange for the system to be accepted for use onboard the ship. Recognised Organisation (RO) is to verify the system has been installed correctly on the ship, including anything ship specific such as back-up systems. If satisfied the system is acceptable, Recognised Organisation (RO) is to issue a Declaration of electronic Ballast Water Management Record Book to the ship. This Declaration must be retained onboard as evidence that the system has been accepted.

Refer to attached file TAN 008-20 for Administration’s policy on electronic signatures, storage of data and offline records.

(Administration email dated 06/05/2025)

The Administration accepts early implementation of the amendments in accordance with MEPC.383(81) and the Guideline MEPC.372(80) ahead of the 1st October 2025 entry into force date.

Challenging water quality (CWQ)

(TAN 009-22)

Operators are reminded that additional non-mandatory procedures added to the BWMP do not require specific approval by the vessels RO. Where addendums for non-mandatory procedures are added to the plan (such as contingency measures to address CWQ) these may be voluntarily approved by the vessels RO but it is not an explicit requirement. Only where the BWMP is completely revised (new chapters, statutory procedure changes etc.) is re-approval by the vessels RO required.

ILO Conventions

ILO 133 Article 6 (&c)

UV sterilisation of water produced on board is not considered sufficient on its own to meet the standards required for drinking water. If UV sterilisation is fitted, then an additional means of sterilisation is required. This can be hyper-chlorinating of the tanks on a regular basis or it can be a separate additional sterilisation system.

Silver ion units and automatic chlorinating systems are acceptable on their own. Sterilisation units should be fitted as close to the outlet of the FW tank as possible.

ILO 152

Lifting appliances, lifting gear and plant - Competent Persons: see IC009 for details - www.iomshipregistry.com

Miscellaneous technical requirements

Large Commercial Yacht Code

Refer to Section 7 of “Technical Instructions” displayed in Technical Instructions to ROs and their Surveyors

General requirements

All commercial yachts of 24m Load Line length and above shall be built and maintained to Recognised Organisation (RO)’s rules and shall comply with the Red Ensign Group (REG) Yacht Code. Further information on the REG Yacht Code and the IoM’s National Annex is available in MSN 054 in attached file.

A matrix detailing the division of responsibilities with respect to surveys and the issue of statutory certification to commercial yachts is provided in Schedule 2 of MSN 054.

  • New build commercial yachts

    Along with applicable statutory certificates, the attending Recognised Organisation (RO)’s surveyor will be asked to issue a statement confirming the yacht meets relevant Yacht Code requirements. A surveyor from the Ship Registry will attend the yard at intervals during the build process.

  • Large Commercial Yacht Code surveys of existing yachts

    Recognised Organisation (RO) is fully authorised to carry out annual Large Commercial Yacht Code surveys. The Ship Registry shall be informed within 5 working days of completing the survey, this is so the Ship Registry’s database is updated and also to ensure the electronic version of the Red Ensign Group Yacht Code Certificate has been digitally endorsed.

    In the event Recognised Organisation (RO) does not maintain its own checklist with respect to Code compliance, the attending surveyor may request the Ship Registry to forward its aide mémoire.

    When completing a yacht Code compliance survey, the RO is to:

    a. verify that there has been no significant modification to the yacht since its last survey.

    b. confirm that the radio equipment on yachts <300GT has been subject to survey by an RO-approved radio technician.

Renewal Surveys will normally be carried out by a Ship Registry surveyor. Where circumstances do not permit this Recognised Organisation (RO) may be appointed to act on our behalf. In such circumstances, a specific appointment will be forwarded by email and the attending surveyor/auditor should be guided by the instructions contained within the appointment.

Additional requirements

Lightweight survey

A lightweight survey is required to be carried out to the satisfaction of the attending Recognised Organisation (RO)’s surveyor at intervals not exceeding five years. Refer to MSN 037 in attached file for further information.

Bow height – Application of the Load Line Convention

Increased bow height requirement introduced by IMO Resolution A972(24) are not applied to yachts certified compliant with the Large Commercial Yacht Code (LY1, LY2, LY3 & REG Yacht Code). Such yachts may be constructed with bow height in accordance with the requirements of the 1966 Load Line Convention. An exemption is not required.

Ship Identification Number (Code Section 19.6)

Commercial yachts of 300GT and above must have the Ship Identification Number marked in accordance with passenger ship requirements stated in SOLAS Ch.XI-1, Reg.3.4.1 hence on a horizontal surface visible from the air.

Launching Appliances - Replacement Intervals for Synthetic Fibre Rope Falls

(REG-UI 005)

The provision for the use of synthetic fibre rope falls and this REG-UI regarding their replacement intervals is limited to those vessels certificated in accordance with the REG Yacht Code only.

The REG has concluded than an extension of the renewal interval to no more than 24 months in order to align with the annual attendance by Surveyors is considered appropriate, subject to compliance with the criteria outlined below.

Synthetic fibre rope falls shall be designed with a Factor of Safety on the basis of the maximum working load assigned and the ultimate strengths of the materials used for construction. The required Factor of Safety shall be at least 7.5 or in accordance with the Rules of a Recognised Organisation (whichever is higher).

Synthetic fibre ropes including the details of any splicing and terminal connections shall comply with the requirements of a Recognised Organisation, be certified accordingly and be suitable for the specific application for which they are proposed.

The weekly and monthly tests and inspections as required by Regulations 20.6 and 20.7 of SOLAS Chapter III shall be carried out onboard under the direction of a senior ships officer.

The thorough examination of synthetic fibre rope falls for man riding launching appliances (both LSA and non-LSA) shall be undertaken by an Authorised Service Provider in accordance with the applicable requirements of IMO Resolution MSC.402(96).

In lieu of compliance with the above paragraph, launching appliances installed onboard vessels of less than 500GT may be dealt with in accordance with the provisions of Part A, 13.4 (3) (g) of the REG Yacht Code (2024 Edition).

The inspection of launching appliances including their synthetic fibre rope falls during periodical surveys shall be dealt with by the attending Surveyor in accordance with standard survey procedures.

Synthetic fibre rope falls shall be replaced at intervals specified either by the manufacturer, the Rules of the applicable Recognised Organisation or 24 months, whichever is less. It shall, however, be noted that the aforementioned provisions are subject to ensuring that no defects are identified during the periodical inspection regime outlined above that would require their replacement any sooner.

Where replacement intervals are based on the number of operating cycles, records of the same shall be maintained and kept onboard as part of the mini-ISM or ISM system as applicable.

Certification

Statutory certification should be annotated as follows:

  • LY1 vessels

    Cargo Ship Safety Construction, Safety Equipment, Safety Radio and International Load Line certificates:

    “This yacht is in compliance with the equivalent arrangements of the Code of Practice for the Safety of Large Commercial Sailing and Motor Vessels extended to the Isle Of Man by IMO Circular Letter No. 2578 dated 8 August 2004".

  • LY2 vessels

    Cargo Ship Safety Construction, Safety Equipment, Safety Radio and International Load Line certificates:

    “This yacht is in compliance with the equivalent arrangements of the Large Commercial Yacht Code (LY2) extended to the Isle Of Man by IMO Circular Letter No. 2937 dated 13 January 2009".

  • LY3 vessels

    Cargo Ship Safety Construction, Safety Equipment, Safety Radio and International Load Line certificates:

    “This yacht is in compliance with the equivalent arrangements of the Large Commercial Yacht Code (LY3) extended to the Isle Of Man by IMO Circular Letter No. 523 dated 16 September 2013".

  • Red Ensign Group Yacht Code

    Cargo Ship Safety Construction, Safety Equipment, Safety Radio and International Load Line certificates:

    “This yacht is in compliance with the equivalent arrangements of the REGYC extended to the Isle of Man by IMO GISIS reference number XQ46476 dated 20th November 2018¡¨

Large Commercial Yacht Code (LY2) - Intact & damage stability

Every commercial yacht, regardless of size, should be inclined upon its completion and the lightship and centres of longitudinal / vertical gravity determined.

When a yacht is refitted or modified in any way, a record of the weight changes is maintained in the yachts stability booklet and where necessary the yacht is re-inclined.

The MANX Shipping Notice (MSN) 037, explains the main requirements for obtaining and checking the lightship and centres of gravity of commercial yachts in compliance with the Large Yacht code (LY2).

Annual surveys (yachts under 500grt)

The form in the attached file “C19YachtRecordOfInspection up to 500GT” is to be filled in by the Recognised Organisation (RO) surveyor at each annual survey and attached to the survey report.

The original is to be sent to CLO.

Merchant Shipping (Vessels in commercial use for sport or pleasure) Regulations 2018 - In force: 1 January 2009

  1. These Regulations require a Manx ship which is a large commercial yacht to comply with Part A of the Red Ensign Group Yacht Code and MSN 054 in respect of manning and seafarer’s certification. Part A of the Red Ensign Group Yacht Code (“the Large Yacht Code”) replaces the existing yacht code known as LY3 with effect from 1 January 2019. The Large Yacht Code has been notified as an equivalent arrangement to certain International Maritime Organization Convention requirements. Regulation 7(4) therefore disapplies the Statutory Documents which require compliance with those Convention requirements to a yacht which has been examined, and in respect of which appropriate certificates have been issued, in accordance with Annex M of the Large Yacht Code. These Regulations come into operation on 1 January 2019 in line with the coming into operation date of the Large Yacht Code and revoke and replace existing legislation which requires a large commercial yacht to comply with LY3. MSN 054 is re-issued and advises of the new Red Ensign Group Yacht Code and includes the Isle of Man’s National Annex.

  2. existing commercial yachts must comply with the additional requirements stated in Chapter 1.6(2) of the REG Yacht Code before their next annual survey.

    The REG Yacht Code is available at: https://www.redensigngroup.org/publications/

  3. MSN 033 which advises of the required manning levels for pleasure yachts is updated

For further information, refer to attached files:

  • “msn-054-isle-of-man-reg-yc-ly3-national-annex-rev-5” - Red Ensign Group Yacht Code & Isle of Man LY3 National Annex

  • “msn-033-pleasure-vesselmanning-october-25” - Pleasure vessel manning

  • “sd2018-0312” - Merchant Shipping Regulations 2018

Disapplication of requirements of the 2024 Edition of the REG Yacht Code

(REG Yacht Code Guidance Information 2024/1 Amendment 03)

REG has taken the decision to disapply the following requirements of the 2024 Edition of the Code to those vessels, whose contract for construction is signed prior to 01 January 2027, or, in the absence of a building contract, the keel of which is laid, or the vessel is at a similar stage of construction prior to 01 January 2027:

  • Stability Criteria: Stability criteria for vessels with openings in the hull, the lower edge of which is less than 600mm above the uppermost load line and floodable tender garages (Part A, Chapter 11, sections 11.5 & 11.6 refer).

    Refer to section 2 of the REG Yacht Code Guidance Information 2024/1 Amendment 03 for the final set of regulatory amendments to the criteria for vessels with openings in the hull, the lower edge of which is less than 600mm above the uppermost load line including vessels with floodable tender garages.

    These amendments shall apply to those vessels, whose contract for construction is signed on or after 01 January 2027 or, in the absence of a building contract, the keel of which is laid, or the vessel is at a similar stage of construction on or after 01 January 2027. However, the early adoption of these amendments, either partial or in full, is recommended.

Following the inspection of several sub 500GT yachts specifically to examine the technical feasibility of installing structural fire protection in tender garage spaces and larger lockers containing Personal Watercraft (PWC’s), due consideration being given to the damp and sometimes wet environment within such spaces and a further review of incident data in relation to fires in such spaces, the REG has taken the decision to remove the following requirement from the 2024 edition of the Code:

  • Fire Safety: Vessels of less than 500GT - Passive fire protection for enclosed spaces containing vehicles with petrol in their tanks (Part A, Table 14A.1 and 14A.2 (3) (b) refer).

Spaces containing lithium-Ion batteries in isolation or lithium-Ion batteries in combination with petrol shall still need to be provided with passive fire protection in accordance with the requirements of the REG Yacht Code 2024, Part A, Chapter 14A, Table 14A.1 and MGN 681 (M) Fire Safety and storage of small electric powered craft on yachts.

Heliports on Large Yachts

(REG-GN 001 Rev.1)

Aviation Inspection Bodies (AIBs) are approved by the UK Maritime and Coastguard Agency (MCA), under the authority of the UK Department for Transport (DfT). AIBs are authorized to conduct yacht heliport inspections and certification against the requirements of the REG Yacht Code (YC) Annex H – ‘Helidecks’.

The ROs have authority to approve aspects of the yacht heliports which are relatively routine for them, such as shipboard heliport structural strength and fixed firefighting systems.

The full division of work between AIBs and ROs is as per the delegation matrix in Annex 1 to this Guidance Note REG-GN 001 (attached file).

Any ‘equivalent arrangements’ to prescriptive requirements must be supported by a robust technical justification which is supported by the AIB and/or RO, in order to receive Flag approval. AIBs and ROs should not be involved in prescribing any mitigation measures, this is the responsibility of the builder/designer or operator, who should seek advice from an independent expert when necessary. Each REG Administration with have their own template for an ‘equivalent arrangement application form’; the AIB or RO, as appropriate, will submit to Flag for approval.

For a newbuild project, the AIB will issue a ‘Helideck Landing Area Technical Certificate (HLATC)’ to the yacht builder when they are satisfied with the shipboard heliport’s physical characteristics and associated hardware under their direct purview as well as the matters being dealt with by the RO.

Special Purpose Ship - SPS Code 2008

(Section1, §12 of “Technical Instructions” displayed in Technical Instructions to ROs and their Surveyors)

The Isle of Man accepts the Code of Safety for Special Purpose Ships, 2008 (SPS Code) to new vessels constructed to the Code from 01 July 2014.

Ships which do not meet the requirements of this Code can be constructed to an equivalent standard, as follows:

  1. Ships that operate within the UK Continental shelf must comply with the requirements stated in MGN 674(M).

  2. All other ships must comply with the requirements of the coastal State where the ship operates.

(Email from the Administration dated 04/08/2014)

For fully SPS compliant vessels Recognised Organisation (RO) is authorised to survey vessels for compliance with and to issue vessels with a Special Purpose Ship Safety Certificate on behalf of the Government of the Isle of Man, in addition to the SOLAS Safety Equipment Certificate as required by the convention.

The required exemption certificate will be issued by the Isle of Man Ship Registry and Recognised Organisation (RO) should contact the Ship Registry well in advance for issuance of this certificate.

Recognised Organisation (RO) shall maintain close contact with the Ship Registry through the design and build of any vessel being built to this code, bringing areas of proposed equivalence or alternative arrangements to the Administration’s attention well in advance of delivery of the vessel in order that these can be assessed for approval.

When an existing vessel re-flags to the Isle of Man and is either: a) SPS certificated; or b) would wish to be assessed for SPS certification, Recognised Organisation (RO) should advise the Ship Registry as soon as possible of the level of compliance with the code and of any equivalence, alternative arrangements or exemptions issued to the vessel as soon as possible.

Carriage of industrial personnel

Until the entry into force of the Industrial Personnel Code on 1 July 2024, operators wishing to carry more than 12 industrial personnel may do so on board ships meeting the provisions of the 2008 SPS Code (or an equivalent standard (see Special Purpose Ship - SPS Code 2008)) and by following the requirements of IMO Resolution MSC.418(97).

After the entry into force of the Industrial Personnel Code, industrial personnel must be carried in accordance with SOLAS Chapter XV and the Industrial Personnel Code.See TAN 003-23 in attached files for further information.It should be noted that since SOLAS Chapter XV aggregates the number of Special Personnel, passengers and Industrial Personnel, the Industrial Personnel Code may apply to vessels carrying as few as one Industrial Personnel.

DP systems

Where vessels require Flag State Verification and Assessment Documents (FSVAD), Recognised Organisation (RO) may issue these documents on the basis of compliance with MSC/Circ.645; it will be up to Recognised Organisation (RO) to determine whether their rules are identical to or more onerous than the circular’s requirements or whether any assessment in addition to survey against Recognised Organisation (RO) DP rules is required in order to issue the FSVAD.

Refer to the “Technical Instructions” displayed in Technical Instructions to ROs and their Surveyors.

Code on Noise Levels on Board Ships

Interpretation: Ch. 6 Acoustic Insulations between Accommodation Spaces

Further to email dated 11/07/2017, the Administration agrees the following interpretations:

  1. Public spaces and Offices:

    - Rw45 is required to the boundaries between public spaces and cabins/hospitals.

    - “Offices” are not categorized as “Public Spaces”, but may be regarded as “Accommodations” in accordance with SOLAS Chap. II-2/ Reg.3.1 which defines each spaces.

  2. Category of Stairways/staircases/elevator:

    Stairways/staircases/elevator should not be categorized as corridor, and then the airborne sound insulation for bulkheads between cabins and stairways/elevator are NOT required.The Administration agrees the code does not require sound insulation in this case, but the maximum noise levels (dB(A)) required for cabins in section 4.2 of the Code must be followed.

  3. Concealed or inaccessible space:

    As to concealed or inaccessible space behind lining, the airborne sound insulation for bulkheads and decks are NOT required.

Ship Recycling and IHM

(Administration email dated 19/03/2020)

The Ship Registry’s policy on these requirements is stated as below.

Hong Kong Convention

The Hong Kong Convention has been ratified but not yet entered into force. At the present time, Convention has not been extended to the Isle of Man.

(Administration email dated 25/09/2025)

Recognised Organisation (RO) is permitted to carry out work according to the Hong Kong Convention 2009. However until the Convention been extended to the Isle of Man, any certification issued must be a Statement of Compliance on behalf of the Government of the Isle of Man (available in National Certificates see Specific Certificates: National and bilingual International certificates.) by exceptional circumstance due to similar to Statement of Compliance issued for EU-SRR, to avoid any PSC related issues.

EU Regulations on Ship Recycling 1257/2013

Certain requirements in the EU’s Ship Recycling Regulations apply to ships of a non-EU flag State.

Recognised Organisation (RO) is permitted to carry out the work associated with these EU Regulations 1257/2013 for Isle of Man registered ships, which includes:

1. Verification of the Inventory of Hazardous Materials in accordance with EU Regulation 1257/2013; and

2. Issue of the “Statement of Compliance” for NON-EU ships on behalf of the Isle of Man (Administration email dated 05/11/20). A specific form is available in Certificate Editor (model EMSA).

Asbestos Containing Materials

(Section 11 of “Technical Instructions” displayed in Technical Instructions to ROs and their Surveyors and TAN 005-20)

Where an IHM reveals the presence of Asbestos Containing Materials in contravention of SOLAS II-2/3-5 then action should be taken to have it removed.

The removal (assigned to professional asbestos removal companies) should take place within a time frame of 3 years from the date when the contravention is found.

In such cases the Isle of Man Ship Registry should be notified when the contravention is found, together with an action plan for the management/removal of the ACM. If this is found to be satisfactory, an exemption will be issued.

An exception to the above exists for asbestos-containing gaskets in good condition, (as verified by class and/or a specialist company) and installed between 1 July 2002 and 1 January 2011 in contravention of SOLAS regulation II 1/3 5. For these, the Administration may issue an equivalence in accordance with SOLAS regulation I/5, instead of removal as per above paragraph, allowing for an onboard implemented risk-based maintenance and monitoring programme of onboard materials containing asbestos, in accordance with the Guidelines for maintenance and monitoring of on-board materials containing asbestos (MSC.1/Circ.1045). Such asbestos-containing gaskets should subsequently be removed when planned repairs or removal of the relevant system (containing these gaskets) is carried out.

Small Commercial Vessels

Recognised Organisation (RO) Newcastle should be contacted when a request for such a code survey is received.

ISM Code

Authorizations and Instructions

Refer to the “Technical Instructions” in Technical Instructions to ROs and their Surveyors.

Audit and ship type accreditation
Ship typePSPHPRBCOTCTGCCHCSMO

Document of Compliance

Interim   XXXXXXX
Initial   XXXXXXX
PeriodicalXXXXXXXXXX
Additional   XXXXXXX
Renewal   XXXXXXX
Note:Except for companies where the Administration carries out the shipboard ISM audit (i.e. Commercial yachts/Passenger ships/High speed crafts). For these companies, the Administration will carry out the initial and renewal DOC audits. Recognised Organisation (RO) is authorised to carry out all of the annual audits.

Safety Management Certificate

Interim   XXXXXXX
Initial   XXXXXXX
Intermediate   XXXXXXX
Additional   XXXXXXX
Renewal   XXXXXXX

Note:

Concerning Commercial Yachts/Passenger Ships/High Speed Crafts, Recognised Organisation (RO) may be authorized on a case by case basis by the Administration for SMC.
Requirements of the Administration
Requirements of the AdministrationAction by
The Administration is to be informed following completion of any SMC or DOC audit.LA/CSQM

For the following, the Administration is to be informed of the following:

  • immediately on identification of a major non-conformity.

  • Within 30 days of the completion of the SMC or DOC audit the RO shall forward a copy of the audit report including any non-conformities and copies of certification to marine.survey@gov.im

LA/CSQM/CSU
When audits are not carried out by the due dates, a major non-conformity is to be raised� which can be downgraded on completion of the audit. This will need to be followed up by an� additional audit within 3 months.LA/CSQM/CSU
Every major non-conformity which has been downgraded to a non-conformity may only be closed out at an additional audit which shall be conducted within 3 months of the audit. The additional audit may be carried out at the ISM company’s office instead of the ship, if agreed with the Ship Registry.LA/CSQM/CSU
The ship Owner is to submit any corrective action plan to Recognised Organisation (RO) within 14 days of the non conformance being raised. A copy of the agreed corrective action is to be forwarded by Recognised Organisation (RO) to the Administration within 5 days of receipt.The ship Owner is to ensure that this corrective action is implemented to the satisfaction of Recognised Organisation (RO) auditor within 3 months or the time limit proposed if less than 3 months. This may be based on receipt of documentary/photographic evidence. 

A copy of any certificate issued or endorsed and the surveyor’s report along with copies of non conformity reports (including observations) shall be forwarded within 14 days of the completion of the audit to:

marine.survey@gov.im

LA/CSQM
At the surveyor’s discretion an emergency drill may be carried out and which may include simulated scenarios, including but not limited to abandon ship, fire, etc. If a drill is carried out details of the drill shall be recorded in the SMC report.LA/CSQM

During the course of an SMC audit if deficiencies are identified with respect to other international conventions (SOLAS, LL, MARPOL, etc.), these shall be identified on the report or reported separately to:

marine.survey@gov.im

LA/CSQM
Reference documents
“Technical Instructions” (attached as Technical Instructions to ROs and their Surveyors)

Specific Requirements

Maritime Cyber Risk Management

(TAN 007-20)

From 1 January 2021, it must be verified no later than the first annual verification of a company’s Document of Compliance that measures ensuring cyber risks have been addressed in safety management systems.

At each DOC audit and each SMC audit following the first annual verification of the company’s DOC after 1 January 2021, the company and the company’s ship(s) will need to demonstrate that ‘cyber risks are appropriately addressed in safety management systems’.

For further information, refer to the attached file “007-20 Cyber Risk Management”.

Enclosed Space Entry Recommendations

(TAN 005-26)

The Administration, strongly advises shipowners, managers, and masters to review their existing arrangements in light of the revised recommendations and, as appropriate, to:

  • Review and update SMS, procedures, and risk assessments to ensure enclosed space entry is addressed in a structured, ship-specific and risk-based manner. This must explicitly consider cargo hazard assessments and specific mitigations (including for carbon dioxide risks) where relevant cargoes are to be carried;

  • Establish and maintain an Enclosed Space Register, reflecting the vessel’s design, configuration, cargoes, and operating profile, and ensure it is subject to periodic review;

  • Verify that portable gas detection equipment carried onboard is suitable for the spaces entered and capable of measuring oxygen (O2), flammable gases, toxic gases, and carbon dioxide (CO2), and that the correct number of sets are carried and comply with Appendix 1;

  • Review enclosed space entry permits and rescue plans to ensure they are aligned with the revised recommendations and clearly define roles, responsibilities, and control measures; and

  • Ensure crew training and drills reflect the revised recommendations and include realistic scenarios relevant to the vessel’s enclosed spaces, periodically incorporating the cargo hazard/atmospheric risk assessment methodology (such as the framework provided in TAN 007-19) to build crew awareness of invisible hazards like CO2.

ISPS Code

Authorizations & Instructions

Refer to the “Technical Instructions” in Technical Instructions to ROs and their Surveyors and MSN 064 in attached file.

SSP approval / reviewShip auditISSC issuance
NoYes(*)Yes(*)

Observation(s):

Ship Security plans and the DMLC Part II must be approved by the Ship Registry. (*) Concerning Commercial Yachts/Passenger Ships/High Speed Crafts, Recognised Organisation (RO) may be authorized on a case by case basis by the Administration for ISSC. Full authorization is granted to Recognised Organisation (RO) for other ship types.

ItemSpecific requirementsObservation(s)
SSP approval / review

- All Ship Security Plans (SSP) are approved by the Administration.

- If Recognised Organisation (RO) is attending a vessel to carry out an interim ISPS audit on behalf of the Administration then the SSP must be with this office prior to the audit being carried out. Once the SSP has been received the Administration will advise the Recognised Organisation (RO) surveyor that the SSP is under review, as required by the ISPS Code.

- In case of electronic SSP, an original stamped approval page is to be retained on board.

- Amendments to SSP: refer to SSP Amendment

Refer to MSN 064
Audits- The Administration shall be informed if the intermediate verification is not carried out between the 2nd and 3rd anniversary dates or the renewal verification is not carried out before the expiry of the ISSC. Any additional audit to be carried out as instructed by the Administration. 
Reporting requirements

In the event of a ‘major failure’ the Ship Registry is to be advised immediately.

Within 30 days of the completion of the ISPS audit Recognised Organisation (RO) shall forward a copy of the audit report including any findings and copies of certification to marine.survey@gov.im

 
Systemic FailureThe Administration shall be contacted for further instructions 
ISPS CertificateThe ISSC shall be withdrawn or suspended after due consultation with the Administration if: - The equivalent alternative security measures do not effectively mitigate the security risks; or - An approved action plan has not been complied with (if identified at any Class visit to the vessel or at the next verification. 
ISPS Records

Records required to be kept by the Ship Security Plan are to be maintained on board and in the English language.

ISPS records are kept for a minimum of 3 years (this may be 1 year on the ship and 2 years in the office – email evidence that the records have been sent to the office should be requested).

 
Ship Security Alert System (SSAS) SSAS function test to be carried out at intervals not exceeding 12 months.
Private Armed Security Personnel (PASP)See MSN 045 attached 
Declaration of appointment of CSOName & contact details of the applicable CSO is retained within the IoMSR and included in SSP. There is no requirement for a “Declaration of CSO” to be retained on board a ship. Similarly there is no requirement for a “Declaration of DPA” to be retained on board a ship.IoMSR letter dated 16/01/2019
Document of reference- “Technical Instructions” (see Technical Instructions to ROs and their Surveyors) - MSN 064 - SOLAS Chapter XI-2 & the ISPS Code (in attached file “msn-064-isps”)

National Requirements

SSP Amendment

(MSN 0064 and IoMSR letter dated 16/01/2019)

The ISPS Code requires that all amendments to the SSP be approved by the Administration. The IOMSR interprets ‘amendments’ to mean material changes to the plan and the procedures contained within. Updates of contact details and minor revisions for the correction of spelling mistakes or similar need not be submitted, but the SSP’s amendment page will be stamped to state the amendments have been approved when an IOMSR surveyor next attends for an ISPS audit or General Inspection.

If the circumstances under which the Ship Security Assessment (SSA) was made have changed (for instance type of cargo, trade area, significant changes in the nationality of the crew, relevant modifications to the vessel, etc.), the vessel should be re-assessed. The revised SSP should be resubmitted for approval.

Competent Authority (CA) - approval by IoMSR

(IoMSR letter dated 16/01/2019)

Further to SOLAS Ch XI-2, Reg.6.2.1, every Manx ship maintains a CA ashore which receive ship-to-shore security alerts trasmitted by the SSAS. Managers must advise details of the nominated CA to the Administration and an approval letter is issued to managers in response.

ISPS Code and Merchant Shipping Regulations do not require the approval letter (or details of the nominated CA) to be retained on board the vessel.

MLC, 2006

Scope of authorisation

Refer to the “Technical Instructions” in Technical Instructions to ROs and their Surveyors.

DMLC II
 YesNoObservation
Approval of DMLC II XThe approval of the DMLC Part II will be completed by the Administration. Recognised Organisation (RO) is not authorised to approve DMLC requirements on behalf of the Ship Registry. Following a successful initial verification Recognised Organisation (RO) will endorse the DMLC Part II as normal. The Administration will continue to issue DMLC documentation. (Refer to MLN 006). No DMLC review letter of review shall be issued by the authorized MLC RO (Administration letter dated 17/01/2019).
Inspection & Certification
 InspectionCertification
YesNo
Full recognition (Recognised Organisation (RO) is RO) for ships other than Commercial Yachts/Passenger Ships/High Speed Crafts. Concerning Commercial Yachts/Passenger Ships/High Speed Crafts, Recognised Organisation (RO) may be authorized on a case by case basis by the Administration.XX 

Specific Flag requirements

Reporting requirements

In the event of a serious deficiency, the Ship Registry is to be advised immediately.

Within 30 days of the completion of the MLC inspection Recognised Organisation (RO) shall forward a copy of the audit report including any findings and copies of certification to marine.survey@gov.im.

Instructions to Surveyors

All Maritime Labour Notices (MLNs) can be found on the following link: https://www.iomshipregistry.com/notices-legislation/mlns/

The following requirements are specific to IOM flagged ships and need to be verified during MLC inspections:

  • Public holiday leave is calculated on the basis of a minimum of 10 days per 12 months of service period, as specified in MLN 2.4.

  • Seafarers Employment Agreement (SEA) must include place of repatriation, as specified in MLN 2.1.

  • Deductions from wages are only permitted where specified in MLN 2.2.

  • Medical stores onboard must comply with in MLN 4.1.

  • Safety Officer must be appointed as specified in MLN 4.3(A)

  • The shipowner must carry out a risk assessment to assess the level of mechanical vibration to which a seafarer is likely to be exposed, as specified in MLN 4.3(B).

  • The shipowner must carry out a risk assessment to assess the level of noise to which seafarers are exposed, as specified in MLN 4.3(C).

  • If hazardous chemical agents are present on-board the ship, the shipowner must carry out a risk assessment to assess any risk to the health and safety of seafarers, as specified in MLN 4.3(D).

  • All Isle of Man registered vessels are required to report casualties, accidents, incidents and occupational diseases to the IOMSR, as specified in MLN 4.3(E).

Exemptions or Equivalences

Any exemptions shall be agreed by the Administration. Equivalents which have already been agreed are listed on the DMLC Part 1. Any other equivalence shall be agreed by the Administration.

Complaints

MLC complaints will be handled by the Administration.

If Recognised Organisation (RO) receive any complaints, this shall be forwarded to MarineMLC.DED@gov.im along with any comments from the attending surveyor as applicable. If an inspection is required further to a complaint, the Administration will attend or may appoint Recognised Organisation (RO).

Amendments of 2022 to the Maritime Labour Convention, 2006

(TAN 007-24)

To ensure that amendments of 2022 have been properly considered and implemented onboard on each vessel, the Administration is asking all MLC shipowners to submit for approval a revised DMLC Part II before 20th December 2024.

As a minimum, the amended DMLC Part II must explain how the shipowner meets the requirement to facilitate both social connectivity and internet access onboard its vessels, taking account of the Ship Registry Policy in Appendix 1. The shipowner should amend Section 9 of the DMLC Part II. The amendment need not be excessively lengthy.

Shipowners may also consider whether it is necessary to amend the DMLC Part II to take account of the other amendments to MLC.

Upon approval of the amended DMLC Part II, the Administration will issue an email confirming that an amended DMLC Part II has been received and approved by this office. A copy of this email shall be kept onboard all vessels, together with a draft of the amended DMLC Part II.

The Administration will allow a ship already on the register as of 23 December 2024 to continue with its current DMLC Part I & II until the first MLC renewal survey after this date. Re-issue of the approved revised DMLC Part I & II should be requested from the Administration when the vessel is arranging the MLC renewal survey.

For the avoidance of doubt, all MLC ships shall comply with the amendments from the entry into force date of the MLC amendments regardless of the status of the DMLC Parts I & II, failure to do so may cause a vessel issue during Port State Control.

Additionally, any ship already on the register as of 23 December 2024 may request an updated DMLC Parts I & II at any time if they do not wish to wait until the first renewal.

Any ship joining the register after 23 December 2024 will be required to have an updated DMLC Parts I & II.

Appendix — Agreement governing the delegation of statutory certification services

Agreement

See the attached file “Agreement_RO SA_Isle of Man_01082021”.

Definitions

See the attached file “Appendix 3 - Isle of Man_RO SA”

Appendix — Annex 1 to the Agreement

Applicable instruments and degree of authorisation

See the attached file “Appendix 1 - Isle of Man_RO SA”

Refer also to “Appendix 1 RO Authorisation table” displayed in last page of “Technical Instructions” displayed in Technical Instructions to ROs and their Surveyors

Appendix — Annex 2 to the Agreement

Reporting to the Administration

See the attached file “Appendix 2 - Isle of Man_RO SA”.

Appendix — Annex 4 to the Agreement

List of current Recognised Organisations

See the attached file “Appendix 4 - Isle of Man_RO SA”.

Appendix — Technical Instructions to ROs and their Surveyors

Survey procedures and issue of certificates for vessels registered in the Isle Of Man

See the attached file “iom-technical-instructions-to-ros-2025”.

Appendix — New construction ships, major modifications or conversions & type approval

New construction

A survey appointment (Form C 33) will be sent to the Recognised Organisation (RO)’s office coordinating the project and copied to the Recognised Organisation (RO)’s flag State coordinator.

Statutory certificates listed in the appointment will be issued to the shipyard by Recognised Organisation (RO). Copies of all certificates issued must be made available to the Administration.When Recognised Organisation (RO) has been advised that the Administration will not be attending, or the delivery takes place after the Administration surveyor's visit, the registry process will be coordinated directly with the attending Recognised Organisation (RO)’s surveyor.

The attending Recognised Organisation (RO)’s surveyor(s) should maintain contact with the Administration coordinating surveyor as necessary.

Major modifications or conversions

For ships undergoing major modifications or conversions, full details are to be advised to the Administration who will then appoint Recognised Organisation (RO) to act on their behalf in the same way as outlined above.

An Isle of Man Ship Registry surveyor may attend on completion.

Statutory equipment requiring type-approval

Statutory equipment requiring type-approval must be accompanied by a type approval certificate issued by:

  • an RO listed in MSN 20; or

  • an RO on behalf of a national Administration; or

  • the Ship Registry.

If the equipment has been issued with a type approval certificate by another organisation it may only be used or fitted with the consent of the Administration.

Equipment which has been certified under the Marine Equipment Directive (MED) is acceptable to be used on IoM registered vessels, although it is not a mandatory requirement that equipment has been certified under the MED.

Except when it is a Convention requirement, individual test certificates are not required in addition to the type approval certificate.

Appendix — Specific Certificates: National and bilingual International certificates.

List of National certificates

Statement of Compliance on IHM for Hong Kong Convention (on behalf of flag)