6.4.1 Prior to survey, the surveyor shall
examine the completeness of the documentation on board, and its contents as a basis
for the survey.
6.4.2 For bulk carriers subject to SOLAS
regulation
II-1/3-10, on completion of the survey, the surveyor shall verify that the
update of the Ship Construction File (SCF) has been done whenever a modification of
the documentation included in the SCF has taken place.
6.4.2.1 For the SCF stored on board ship, the surveyor
shall examine the information on board ship. In cases where any major event takes
place, including, but not limited to, substantial repair and conversion, or any
modification to the ship structures; the surveyor shall also verify that the updated
information is kept on board the ship. If the updating of the SCF on board is not
completed at the time of survey, the surveyor shall record it and require
confirmation at the next periodical survey.
6.4.2.2 For the SCF stored in an onshore archive, the
surveyor shall examine the list of information included in the onshore archive. In
cases where any major event takes place, including, but not limited to, substantial
repair and conversion, or any modification to the ship structures; the surveyor shall
also verify that the updated information is stored in the onshore archive by
examining the list of information included in the onshore archive kept on board the
ship. In addition, the surveyor shall confirm that the service contract with the
archive centre is valid. If the updating of the SCF Supplement ashore is not
completed at the time of survey, the surveyor shall record it and require
confirmation at the next periodical survey.
6.4.3 For bulk carriers subject to SOLAS
regulation
II-1/3-10, on completion of the survey, the surveyor shall verify any
addition and/or renewal of materials used for the construction of the hull structure
are documented within the Ship Construction File's list of materials.
6.4.4 For bulk carriers with coatings of
dedicated seawater ballast tanks subject to PSPC standards (MSC.215(82)), on completion of the survey, the surveyor shall verify any
maintenance, repair or recoating activities to these coatings are documented within
the Coating Technical File (CTF).