1.3.1 The approval requirements for various parts
of a monitoring system as specified in these Guidelines and Specifications
are summarized below:
-
.1 the oil content meter should be tested for
type approval in accordance with the procedures described in part
1 of the Annex;
-
.2 the oil content meter and the control section
of a monitoring system should be subjected to the environmental tests
specified in part 2 of the Annex;
-
.3 documentation for plan approval, as specified
in section 8, should be submitted
to the Administration prior to the installation of the monitoring
system;
-
.4 the component parts of the system should undergo
the workshop functional tests specified in section
7; and
-
.5 the complete monitoring system should be surveyed
in accordance with the procedures laid down in section 10.