5 Integration Survey & Approval
5.1 General
5.2 Installation
5.2.1 Mechanical Appraisal
-
Required Submissions
- Diagrams and details of any additional and modified piping systems
- Arrangements of machinery and equipment (for reference)
- Drawings and details of any hydraulic actuating mechanisms (Pipe
design pressure, inner and outer diameters, thickness, material, design
and working temperature, etc.,)
- Harbour Acceptance Test (HAT) schedule
- Sea trials schedule
-
Applicable Rules (Existing) Provisional Rules for Sail-Assisted Ships, January
2008 Rules and Regulations for the Classification
of Ships
-
Additional Verification No additional requirements.
-
Deliverables The
DAD will be issued at the end of the design approval process.
5.2.2 Structural Appraisal
-
Required Submissions
- Document explaining the design concept of the full system
- Revised Watertight Bulkhead (WT BHD) plan showing the integration
of rotor column including welding details
- Wind force calculations
- Calculations of deck forces due to the rotor
- Full information regarding design parameters, including relevant
environmental data and limiting operating conditions, lift and drag
coefficients and resulting force variations and distributions throughout
the range of operating angle of the rotor systems. These data should
be supported by results from appropriate testing.
- Scantling calculations of rotor column demonstrating that the
strength is equivalent to that of WT BHD including the flooding strength
as per IACS UR S18 and grab reinforcement.
- 3D FEA structural analysis of rotor column integration to WT BHD
- Access arrangement plan to rotor column and to inner bottom
- Revised trim, stability and longitudinal strength calculations
with installation of rotor system
- Revised final loading manual after installation of the full system
- Operation manual of the full system (for reference)
- It is a feature specific to Flettner rotors that ‘conventional
load’ or ‘proof load’ tests defined in LAME Ch 12 Testing, Marking and Surveys of the Rules (as applicable) can’t
be performed. Therefore, the designer and manufacturer are to prepare
a detailed FAT and ship board operational test program, covering a
simulation of all operational and non-operational loads and events
of the rotors through their designed life.
- Test schedules/programs (for both works testing and sea trials)
that are to include the methods of testing and the test facilities
provided.
-
Applicable Rules (Existing) Provisional Rules for Sail-Assisted Ships, January
2008
Evidence will be required to ensure that the vessel has appropriate
stability when the rotor is integrated to the hull.
Evidence will be required to ensure that the propulsive machinery
fitted to the ship is of sufficient power to ensure adequate manoeuvrability
of the vessel in all conditions, including inoperative rotor systems.
In general the propulsion machinery should be capable of operating
in all conditions of heel and trim which may result from operation
of the rotor systems.
If the maximum service speed with combined wind-assisted propulsion
exceeds initial design service speeds, modifications to rudder and
stern frame scantling might be necessary. The service speed, V, used
in the derivation of rudder and stern frame scantling in the Rules
for Ships, is to be taken as the maximum estimated speed, in knots,
with the ship in the loaded condition with any possible combination
of sail and propulsion systems.
It is envisioned that the main sail supporting masts will be
carried through the main strength deck and extended below to a second
deck or equivalent structure. Hull structure is to be reinforced and
stiffened locally to ensure adequate strength and resistance to plate
buckling.
Suitable materials should be used for ships carrying dangerous
goods. Steel used within the structure or associated to the sailing
system should be in compliance with the Rules for Ships, Pt 3, Ch 2 Materials. LR Code
for Lifting Appliances in a Marine Environment (LAME)
(2013)
-
Additional Verification Evidence that the anchoring arrangements installed on board
the ship are adequate for the increased windage area the rotors provide.
-
Deliverables The
DAD will be issued at the end of the design approval process.
5.2.3 Electrotechnical
Systems Appraisal
-
Required Submissions
- Revised power tables
- Revised short circuit calculations
- Single line diagram
- Cable installation practice
- Control philosophy
- Navigation bridge visibility
- Navigation lights arrangements
- HAT schedule
-
Applicable Rules (Existing) Rules and Regulations for the Classification of Ships
-
Pt 6, Ch 2, 14 Electrical equipment for use in explosive gas atmospheres or in the presence of combustible dusts
-
Pt 6, Ch 2, 1.3 Documentation required for supporting evidence 1.3.5
-
Pt 6, Ch 2, 11 Electric cables, optical fibre cables and busbar trunking systems (busways)
-
Pt 6, Ch 2, 7 Switchgear and controlgear assemblies
-
Pt 6, Ch 2, 1.2 Documentation required for design review 1.2.6
Provisional Rules for Sail-Assisted Ships, January
2008
A control system is to be provided so that the setting and trimming
of sails may be carried out from the bridge, and is to be such that,
once established, the desired settings and trimming may be automatically
maintained. The control system is to provide adequate speed of response
to automatically neutralise the sail system in the event of wind conditions
which may damage the sail system and endanger the ship.
-
Additional Verification No additional requirements.
-
Deliverables The
DAD will be issued at the end of the design approval process.
5.3 Survey, Inspection, Testing & Trials
5.3.1
Survey &
Inspection. The survey and inspection of the rotor and foundation
structure during its installation/integration are to ensure that the
relevant Rule requirements stated in these Guidance Notes have been
complied and any conditions given in DAD are addressed. It has to
be conducted in accordance with Ch 1, 1.6 Survey requirements for sail systemsof Provisional Rules for Sail-Assisted Ships, January 2008 and
LAME (2013), Ch 12, 3 Survey requirements as
applicable.
5.3.2
Testing &
Trials. The testing during the Flettner rotor installation/integration
and under working conditions after installation/integration has to
be carried out according to the requirements given in Ch 1, 1.6 Survey requirements for sail systems of Provisional Rules for
Sail-Assisted Ships, January 2008 and LAME (2013), Ch 12, 3 Survey requirements as applicable.
5.3.3 Sea trials for
control engineering aspects are to be carried out according to Ship
Rules Pt 6, Ch 1 Control Engineering Systems, Pt 6, Ch 1, 7.1 General and Pt 6, Ch 1, 7.4 Record of trials, and for electrical engineering
aspects, Ship Rules Pt 6, Ch 2 Electrical Engineering, Pt 6, Ch 2, 21 Testing and trials are to be implemented.
|
Copyright 2022 Clasifications Register Group Limited, International Maritime Organization, International Labour Organization or Maritime
and Coastguard Agency. All rights reserved. Clasifications Register Group Limited, its affiliates and subsidiaries and their respective
officers, employees or agents are, individually and collectively, referred to in this clause as 'Clasifications Register'. Clasifications
Register assumes no responsibility and shall not be liable to any person for any loss, damage or expense caused by reliance
on the information or advice in this document or howsoever provided, unless that person has signed a contract with the relevant
Clasifications Register entity for the provision of this information or advice and in that case any responsibility or liability is
exclusively on the terms and conditions set out in that contract.
|
 |
|